{"id":51735,"date":"2026-10-18T00:33:23","date_gmt":"2026-10-17T16:33:23","guid":{"rendered":"https:\/\/wiz.cn\/blog\/?p=51735"},"modified":"2026-10-18T00:33:23","modified_gmt":"2026-10-17T16:33:23","slug":"2026-devops-platform-selection-guide-3","status":"publish","type":"post","link":"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3","title":{"rendered":"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u9009\u578b\u6307\u5357\uff1a6 \u6b3e\u6838\u5fc3\u5de5\u5177\u4e0e\u843d\u5730\u8def\u5f84"},"content":{"rendered":"<p>2026 \u5e74\u505a\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u9009\u578b\uff0c\u4e0e\u5176\u6bd4\u8f83\u529f\u80fd\u6e05\u5355\u957f\u5ea6\uff0c\u4e0d\u5982\u5148\u786e\u8ba4\u4e00\u4ef6\u4e8b\uff1a\u9700\u6c42\u3001\u4ee3\u7801\u3001\u6d41\u6c34\u7ebf\u3001\u5236\u54c1\u3001\u53d1\u5e03\u662f\u5426\u80fd\u5728\u540c\u4e00\u5957\u4f53\u7cfb\u5185\u88ab\u8ffd\u8e2a\u3002\u672c\u6587\u68b3\u7406 6 \u6b3e\u4e3b\u6d41\u5de5\u5177\uff0c\u6309\u5e73\u53f0\u578b\u4e0e\u5355\u70b9\u8865\u9f50\u578b\u5206\u7c7b\uff0c\u5e76\u7ed9\u51fa\u6309\u6761\u4ef6\u9009\u62e9\u7684\u51b3\u7b56\u6846\u67b6\u4e0e\u56db\u9636\u6bb5\u843d\u5730\u987a\u5e8f\u30026 \u6b3e\u5de5\u5177\u5206\u522b\u4e3a\uff1a<strong>ONES<\/strong>\u3001GitLab\u3001Azure DevOps\u3001GitHub\uff08\u542b Actions\uff09\u3001Jenkins\u3001Jira\u3002<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_83 counter-hierarchy ez-toc-counter ez-toc-light-blue ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E4%B8%80%E3%80%81%E4%B8%A4%E6%9D%A1%E9%93%BE%E8%B7%AF%EF%BC%9A%E7%AE%A1%E7%90%86%E4%BE%A7%E4%B8%8E%E4%BA%A4%E4%BB%98%E4%BE%A7\" >\u4e00\u3001\u4e24\u6761\u94fe\u8def\uff1a\u7ba1\u7406\u4fa7\u4e0e\u4ea4\u4ed8\u4fa7<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E4%BA%8C%E3%80%81AI_%E8%AF%AD%E5%A2%83%E4%B8%8B%EF%BC%8C%E9%93%BE%E8%B7%AF%E8%B4%AF%E9%80%9A%E6%88%90%E4%B8%BA%E5%89%8D%E6%8F%90\" >\u4e8c\u3001AI \u8bed\u5883\u4e0b\uff0c\u94fe\u8def\u8d2f\u901a\u6210\u4e3a\u524d\u63d0<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E4%B8%89%E3%80%81%E4%BA%94%E4%B8%AA%E9%80%89%E5%9E%8B%E7%BB%B4%E5%BA%A6\" >\u4e09\u3001\u4e94\u4e2a\u9009\u578b\u7ef4\u5ea6<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E5%9B%9B%E3%80%816_%E6%AC%BE%E4%B8%BB%E6%B5%81%E5%B7%A5%E5%85%B7%E7%9B%98%E7%82%B9\" >\u56db\u30016 \u6b3e\u4e3b\u6d41\u5de5\u5177\u76d8\u70b9<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#1_ONES%EF%BC%9A%E5%B9%B3%E5%8F%B0%E5%9E%8B%EF%BC%8C%E9%9D%A2%E5%90%91%E4%B8%AD%E5%A4%A7%E5%9E%8B%E7%BB%84%E7%BB%87%E7%9A%84%E7%A0%94%E5%8F%91%E6%B2%BB%E7%90%86\" >1. ONES\uff1a\u5e73\u53f0\u578b\uff0c\u9762\u5411\u4e2d\u5927\u578b\u7ec4\u7ec7\u7684\u7814\u53d1\u6cbb\u7406<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#2_GitLab%EF%BC%9A%E5%B9%B3%E5%8F%B0%E5%9E%8B%EF%BC%8C%E7%9C%8B%E6%B8%85%E6%8E%88%E6%9D%83%E4%B8%8E%E8%BF%90%E7%BB%B4%E7%BB%93%E6%9E%84\" >2. GitLab\uff1a\u5e73\u53f0\u578b\uff0c\u770b\u6e05\u6388\u6743\u4e0e\u8fd0\u7ef4\u7ed3\u6784<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#3_Azure_DevOps%EF%BC%9A%E5%B9%B3%E5%8F%B0%E5%9E%8B%EF%BC%8C%E7%94%9F%E6%80%81%E7%BB%91%E5%AE%9A%E6%8D%A2%E4%B8%80%E4%BD%93%E5%8C%96\" >3. Azure DevOps\uff1a\u5e73\u53f0\u578b\uff0c\u751f\u6001\u7ed1\u5b9a\u6362\u4e00\u4f53\u5316<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#4_GitHub%EF%BC%88%E5%90%AB_Actions%EF%BC%89%EF%BC%9A%E5%B9%B3%E5%8F%B0%E5%9E%8B%EF%BC%8C%E7%A7%81%E6%9C%89%E5%8C%96%E8%B7%AF%E5%BE%84%E9%9C%80%E6%8F%90%E5%89%8D%E7%A1%AE%E8%AE%A4\" >4. GitHub\uff08\u542b Actions\uff09\uff1a\u5e73\u53f0\u578b\uff0c\u79c1\u6709\u5316\u8def\u5f84\u9700\u63d0\u524d\u786e\u8ba4<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#5_Jenkins%EF%BC%9A%E5%8D%95%E7%82%B9%E8%A1%A5%E9%BD%90%EF%BC%8C%E4%BB%85%E8%A7%A3%E5%86%B3%E2%80%9D%E6%89%A7%E8%A1%8C%E2%80%9D%E6%AE%B5\" >5. Jenkins\uff1a\u5355\u70b9\u8865\u9f50\uff0c\u4ec5\u89e3\u51b3&#8221;\u6267\u884c&#8221;\u6bb5<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#6_Jira%EF%BC%9A%E5%8D%95%E7%82%B9%E8%A1%A5%E9%BD%90%EF%BC%8C%E8%81%9A%E7%84%A6%E7%AE%A1%E7%90%86%E4%BE%A7\" >6. Jira\uff1a\u5355\u70b9\u8865\u9f50\uff0c\u805a\u7126\u7ba1\u7406\u4fa7<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E4%BA%94%E3%80%81%E6%8C%89%E5%9B%A2%E9%98%9F%E6%9D%A1%E4%BB%B6%E9%80%89%E6%8B%A9\" >\u4e94\u3001\u6309\u56e2\u961f\u6761\u4ef6\u9009\u62e9<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E5%85%AD%E3%80%81%E5%9B%9B%E9%98%B6%E6%AE%B5%E8%90%BD%E5%9C%B0%E9%A1%BA%E5%BA%8F\" >\u516d\u3001\u56db\u9636\u6bb5\u843d\u5730\u987a\u5e8f<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E4%B8%83%E3%80%81PoC_%E9%98%B6%E6%AE%B5%E5%BB%BA%E8%AE%AE%E9%AA%8C%E8%AF%81%E5%85%AD%E9%A1%B9%E5%86%85%E5%AE%B9\" >\u4e03\u3001PoC \u9636\u6bb5\u5efa\u8bae\u9a8c\u8bc1\u516d\u9879\u5185\u5bb9<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E5%B8%B8%E8%A7%81%E9%97%AE%E9%A2%98\" >\u5e38\u89c1\u95ee\u9898<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E7%A0%94%E5%8F%91%E6%95%88%E8%83%BD%E5%B9%B3%E5%8F%B0%E4%B8%8E%E7%A0%94%E5%8F%91%E7%AE%A1%E7%90%86%E5%B9%B3%E5%8F%B0%E6%9C%89%E4%BD%95%E5%8C%BA%E5%88%AB%EF%BC%9F\" >\u7814\u53d1\u6548\u80fd\u5e73\u53f0\u4e0e\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6709\u4f55\u533a\u522b\uff1f<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E5%87%A0%E5%8D%81%E4%BA%BA%E5%9B%A2%E9%98%9F%E6%98%AF%E5%90%A6%E9%9C%80%E8%A6%81%E4%B8%80%E6%AD%A5%E5%88%B0%E4%BD%8D%EF%BC%9F\" >\u51e0\u5341\u4eba\u56e2\u961f\u662f\u5426\u9700\u8981\u4e00\u6b65\u5230\u4f4d\uff1f<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E5%B7%B2%E5%9C%A8%E7%94%A8_GitLab_%E5%92%8C_Jenkins%EF%BC%8C%E6%98%AF%E5%90%A6%E9%9C%80%E8%A6%81%E6%9B%B4%E6%8D%A2%EF%BC%9F\" >\u5df2\u5728\u7528 GitLab \u548c Jenkins\uff0c\u662f\u5426\u9700\u8981\u66f4\u6362\uff1f<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E5%A6%82%E4%BD%95%E8%BE%A8%E5%88%AB%E2%80%9D%E7%9C%9F%E4%B8%80%E4%BD%93%E5%8C%96%E2%80%9D%E4%B8%8E%E2%80%9D%E5%B7%A5%E5%85%B7%E6%89%93%E5%8C%85%E2%80%9D%EF%BC%9F\" >\u5982\u4f55\u8fa8\u522b&#8221;\u771f\u4e00\u4f53\u5316&#8221;\u4e0e&#8221;\u5de5\u5177\u6253\u5305&#8221;\uff1f<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E4%BF%A1%E5%88%9B%E6%88%96%E5%86%85%E7%BD%91%E7%8E%AF%E5%A2%83%E5%A6%82%E4%BD%95%E9%80%89%E5%9E%8B%EF%BC%9F\" >\u4fe1\u521b\u6216\u5185\u7f51\u73af\u5883\u5982\u4f55\u9009\u578b\uff1f<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\/#%E4%B8%8B%E4%B8%80%E6%AD%A5%E8%A1%8C%E5%8A%A8\" >\u4e0b\u4e00\u6b65\u884c\u52a8<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"%E4%B8%80%E3%80%81%E4%B8%A4%E6%9D%A1%E9%93%BE%E8%B7%AF%EF%BC%9A%E7%AE%A1%E7%90%86%E4%BE%A7%E4%B8%8E%E4%BA%A4%E4%BB%98%E4%BE%A7\"><\/span>\u4e00\u3001\u4e24\u6761\u94fe\u8def\uff1a\u7ba1\u7406\u4fa7\u4e0e\u4ea4\u4ed8\u4fa7<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>\u7814\u53d1\u7ba1\u7406\u89e3\u51b3&#8221;\u505a\u4ec0\u4e48\u3001\u8c01\u6765\u505a\u3001\u4f55\u65f6\u505a\u5b8c&#8221;\uff0c\u8986\u76d6\u9700\u6c42\u3001\u4efb\u52a1\u3001\u7f3a\u9677\u3001\u6d4b\u8bd5\uff0c\u6c89\u6dc0\u6d41\u7a0b\u4e0e\u534f\u540c\u8bb0\u5f55\u3002\u7814\u53d1\u6548\u80fd\u89e3\u51b3&#8221;\u4ea4\u4ed8\u591a\u5feb\u591a\u7a33&#8221;\uff0c\u8986\u76d6\u4ee3\u7801\u3001\u6d41\u6c34\u7ebf\u3001\u5236\u54c1\u3001\u53d1\u5e03\u3001\u5ea6\u91cf\uff0c\u6c89\u6dc0\u5de5\u7a0b\u6267\u884c\u6570\u636e\u3002<\/p>\n<p>\u4e24\u8005\u7684\u5206\u754c\u6e05\u6670\uff1a\u7ba1\u7406\u5e73\u53f0\u51b3\u5b9a&#8221;\u505a\u4ec0\u4e48\u3001\u600e\u4e48\u63a7&#8221;\uff0c\u6548\u80fd\u5e73\u53f0\u51b3\u5b9a&#8221;\u600e\u4e48\u66f4\u5feb\u66f4\u7a33\u5730\u4ea4\u4ed8&#8221;\u3002\u4e00\u5957\u5408\u683c\u7684\u6548\u80fd\u5e73\u53f0\uff0c\u6838\u5fc3\u68c0\u9a8c\u6807\u51c6\u662f\u94fe\u8def\u8d2f\u901a\u2014\u2014\u9700\u6c42\u6216\u7f3a\u9677\u7f16\u53f7\u80fd\u5426\u4e00\u8def\u5173\u8054\u5230\u4ee3\u7801\u63d0\u4ea4\u3001\u5408\u5e76\u8bf7\u6c42\u3001\u6784\u5efa\u8bb0\u5f55\u3001\u5236\u54c1\u7248\u672c\u4e0e\u4e0a\u7ebf\u8bb0\u5f55\u3002\u94fe\u8def\u4e2d\u65ad\uff0c\u5355\u70b9\u81ea\u52a8\u5316\u518d\u591a\u4e5f\u96be\u4ee5\u5f62\u6210\u53ef\u590d\u76d8\u7684\u4ea4\u4ed8\u7ed3\u679c\u3002<\/p>\n<h2><span class=\"ez-toc-section\" id=\"%E4%BA%8C%E3%80%81AI_%E8%AF%AD%E5%A2%83%E4%B8%8B%EF%BC%8C%E9%93%BE%E8%B7%AF%E8%B4%AF%E9%80%9A%E6%88%90%E4%B8%BA%E5%89%8D%E6%8F%90\"><\/span>\u4e8c\u3001AI \u8bed\u5883\u4e0b\uff0c\u94fe\u8def\u8d2f\u901a\u6210\u4e3a\u524d\u63d0<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>DORA\uff08Google Cloud DevOps \u7814\u7a76\u4e0e\u8bc4\u4f30\u9879\u76ee\uff09\u5728 2025 \u5e74\u62a5\u544a\u4e2d\u6307\u51fa\uff1aAI \u7684\u89d2\u8272\u662f&#8221;\u653e\u5927\u5668&#8221;\uff0c\u653e\u5927\u7ec4\u7ec7\u65e2\u6709\u4f18\u52bf\uff0c\u4e5f\u653e\u5927\u65e2\u6709\u5f31\u70b9\uff1bAI \u6295\u8d44\u7684\u6700\u5927\u56de\u62a5\u6765\u81ea\u5bf9\u5e95\u5c42\u5de5\u7a0b\u4f53\u7cfb\u7684\u6301\u7eed\u6295\u5165\uff0c\u800c\u975e\u5de5\u5177\u672c\u8eab\u3002\u8fd9\u610f\u5473\u7740&#8221;\u94fe\u8def\u662f\u5426\u8d2f\u901a&#8221;\u4ece\u4f18\u5316\u9879\u53d8\u6210\u4e86\u524d\u63d0\u9879\u3002<\/p>\n<p>DORA \u80fd\u529b\u6a21\u578b\u5c06\u7248\u672c\u63a7\u5236\u3001\u6301\u7eed\u96c6\u6210\u3001\u6301\u7eed\u4ea4\u4ed8\u3001\u5c0f\u6279\u91cf\u5de5\u4f5c\u5217\u4e3a\u5f71\u54cd\u4ea4\u4ed8\u6027\u80fd\u7684\u6838\u5fc3\u80fd\u529b\u9879\u3002\u5176\u6307\u6807\u6307\u5357\u5df2\u5c06\u4ea4\u4ed8\u6027\u80fd\u6269\u5c55\u4e3a\u4e94\u9879\u6307\u6807\uff1a\u53d8\u66f4\u524d\u7f6e\u65f6\u95f4\u3001\u90e8\u7f72\u9891\u7387\u3001\u90e8\u7f72\u5931\u8d25\u6062\u590d\u65f6\u95f4\u3001\u53d8\u66f4\u5931\u8d25\u7387\u3001\u90e8\u7f72\u8fd4\u5de5\u7387\u3002\u540e\u4e24\u9879\u8981\u6c42\u7cfb\u7edf\u5185\u5b58\u5728&#8221;\u90e8\u7f72\u4e8b\u4ef6&#8221;\u7684\u5b8c\u6574\u8bb0\u5f55\u2014\u2014\u54ea\u6b21\u90e8\u7f72\u3001\u54ea\u4e2a\u5236\u54c1\u3001\u6210\u529f\u6216\u5931\u8d25\u3002\u5de5\u5177\u94fe\u62fc\u88c5\u7684\u56e2\u961f\u5f80\u5f80\u7f3a\u4e4f\u8fd9\u6761\u8bb0\u5f55\uff0c\u6307\u6807\u53ea\u80fd\u4f30\u7b97\u3002<\/p>\n<p>\u9009\u578b\u65f6\u53ef\u76f4\u63a5\u53c2\u8003 DORA \u7684\u4e24\u6761\u63d0\u9192\uff1a\u901f\u5ea6\u4e0e\u7a33\u5b9a\u6027\u901a\u5e38\u4e0d\u662f\u53d6\u820d\u5173\u7cfb\uff0c\u9ad8\u6548\u80fd\u56e2\u961f\u5728\u5404\u6307\u6807\u4e0a\u540c\u65f6\u8868\u73b0\u66f4\u4f18\uff1b\u5ea6\u91cf\u672c\u8eab\u82e5\u6210\u4e3a\u76ee\u6807\uff0c\u5bb9\u6613\u8bf1\u53d1\u89c4\u907f\u884c\u4e3a\uff08Goodhart \u5b9a\u5f8b\uff09\uff0c\u6307\u6807\u5e94\u5148\u670d\u52a1\u590d\u76d8\uff0c\u800c\u975e\u5148\u7ed1\u7ee9\u6548\u3002<\/p>\n<h2><span class=\"ez-toc-section\" id=\"%E4%B8%89%E3%80%81%E4%BA%94%E4%B8%AA%E9%80%89%E5%9E%8B%E7%BB%B4%E5%BA%A6\"><\/span>\u4e09\u3001\u4e94\u4e2a\u9009\u578b\u7ef4\u5ea6<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li><strong>\u94fe\u8def\u8986\u76d6\u8303\u56f4<\/strong>\uff1a\u4ee3\u7801\u6258\u7ba1\u3001\u8bc4\u5ba1\u3001CI\/CD\u3001\u5236\u54c1\u3001\u53d1\u5e03\u3001\u8d28\u91cf\u4e0e\u5b89\u5168\u626b\u63cf\u662f\u5426\u5728\u540c\u4e00\u4f53\u7cfb\u5185\uff0c\u6216\u80fd\u5426\u4f4e\u6210\u672c\u6253\u901a\u3002<\/li>\n<li><strong>\u4e0e\u9700\u6c42\u534f\u540c<\/strong>\uff1a\u80fd\u5426\u4e0e\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u5171\u7528\u9700\u6c42\u3001\u7f3a\u9677\u6807\u8bc6\uff0c\u5b9e\u73b0\u4ece\u9700\u6c42\u5230\u53d1\u5e03\u7684\u53ef\u8ffd\u6eaf\uff0c\u800c\u975e\u4eba\u5de5\u5bf9\u8868\u3002<\/li>\n<li><strong>\u90e8\u7f72\u5f62\u6001\u4e0e\u5408\u89c4<\/strong>\uff1aSaaS\u3001\u79c1\u6709\u5316\u3001\u5185\u7f51\u79bb\u7ebf\u3001\u4fe1\u521b\u4e0e\u7b49\u4fdd\u8981\u6c42\u662f\u5426\u6ee1\u8db3\u3002<\/li>\n<li><strong>\u5ea6\u91cf\u80fd\u529b<\/strong>\uff1a\u5185\u7f6e\u4ea4\u4ed8\u6548\u80fd\u6307\u6807\uff0c\u8fd8\u662f\u9700\u4ece\u591a\u5957\u7cfb\u7edf\u53d6\u6570\u62fc\u62a5\u8868\u3002<\/li>\n<li><strong>\u603b\u4f53\u62e5\u6709\u6210\u672c<\/strong>\uff1a\u6388\u6743\u3001\u81ea\u5efa\u8fd0\u7ef4\u3001\u96c6\u6210\u5f00\u53d1\u3001\u6570\u636e\u8fc1\u79fb\u4e0e\u9000\u51fa\u6210\u672c\u4e4b\u548c\u3002<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"%E5%9B%9B%E3%80%816_%E6%AC%BE%E4%B8%BB%E6%B5%81%E5%B7%A5%E5%85%B7%E7%9B%98%E7%82%B9\"><\/span>\u56db\u30016 \u6b3e\u4e3b\u6d41\u5de5\u5177\u76d8\u70b9<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>\u4e0b\u8868\u7ed9\u51fa\u6574\u4f53\u5370\u8c61\u3002\u524d 4 \u6b3e\u4e3a\u5e73\u53f0\u578b\uff0c\u8986\u76d6\u94fe\u8def\u591a\u6bb5\uff1b\u540e 2 \u6b3e\u4e3a\u5355\u70b9\u8865\u9f50\u578b\uff0c\u9700\u5468\u8fb9\u7cfb\u7edf\u914d\u5408\u3002<\/p>\n<table>\n<thead>\n<tr>\n<th>\u540d\u79f0<\/th>\n<th>\u5b9a\u4f4d<\/th>\n<th>\u6838\u5fc3\u80fd\u529b<\/th>\n<th>\u90e8\u7f72\u5f62\u6001<\/th>\n<th>\u66f4\u9002\u914d\u573a\u666f<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><a href=\"https:\/\/ones.cn\/\">ONES<\/a><\/td>\n<td>\u5e73\u53f0\u578b<\/td>\n<td>\u9879\u76ee\u7ba1\u7406\u3001\u9700\u6c42\u7ba1\u7406\u3001\u77e5\u8bc6\u5e93\u3001\u6d4b\u8bd5\u7ba1\u7406\u3001\u6d41\u6c34\u7ebf\u3001\u4ee3\u7801\u7ba1\u7406\u3001\u6548\u80fd\u5ea6\u91cf\u4e00\u4f53\u5316<\/td>\n<td>SaaS\u3001\u79c1\u6709\u5316\u3001\u4fe1\u521b<\/td>\n<td>\u4e2d\u5927\u578b\u7ec4\u7ec7\uff0c\u9700\u590d\u6742\u6d41\u7a0b\u914d\u7f6e\u3001\u8de8\u56e2\u961f\u534f\u4f5c\u6cbb\u7406\u4e0e\u6570\u636e\u9a71\u52a8\u6539\u8fdb<\/td>\n<\/tr>\n<tr>\n<td>GitLab<\/td>\n<td>\u5e73\u53f0\u578b<\/td>\n<td>\u4ee3\u7801\u6258\u7ba1\u3001MR \u8bc4\u5ba1\u3001\u5185\u7f6e CI\/CD\u3001\u955c\u50cf\u4e0e\u4f9d\u8d56\u626b\u63cf<\/td>\n<td>SaaS \u4e0e\u81ea\u6258\u7ba1<\/td>\n<td>\u4ee5\u4ee3\u7801\u4e3a\u4e2d\u67a2\u3001\u6709\u81ea\u6258\u7ba1\u80fd\u529b\u7684\u56e2\u961f<\/td>\n<\/tr>\n<tr>\n<td>Azure DevOps<\/td>\n<td>\u5e73\u53f0\u578b<\/td>\n<td>Boards\u3001Repos\u3001Pipelines\u3001Artifacts\u3001Test Plans \u5957\u4ef6<\/td>\n<td>\u5fae\u8f6f\u4e91\u4e0e\u81ea\u6258\u7ba1<\/td>\n<td>\u6df1\u5ea6\u4f7f\u7528\u5fae\u8f6f\u6280\u672f\u6808\u7684\u56e2\u961f<\/td>\n<\/tr>\n<tr>\n<td>GitHub\uff08\u542b Actions\uff09<\/td>\n<td>\u5e73\u53f0\u578b<\/td>\n<td>\u4ee3\u7801\u6258\u7ba1\u3001\u4e91\u4e0a CI\/CD\uff0c\u751f\u6001\u4e0e\u6a21\u677f\u4e30\u5bcc<\/td>\n<td>SaaS \u4e3a\u4e3b\uff0c\u4f01\u4e1a\u7248\u53ef\u81ea\u6258\u7ba1<\/td>\n<td>\u4e91\u7aef\u534f\u4f5c\u4e0e\u5f00\u6e90\u4e3a\u4e3b\u7684\u56e2\u961f<\/td>\n<\/tr>\n<tr>\n<td>Jenkins<\/td>\n<td>\u5355\u70b9\u8865\u9f50<\/td>\n<td>\u5f00\u6e90 CI\/CD \u6d41\u6c34\u7ebf\u6267\u884c\u5f15\u64ce\uff0c\u63d2\u4ef6\u751f\u6001\u5e9e\u5927<\/td>\n<td>\u81ea\u6258\u7ba1<\/td>\n<td>\u5df2\u6709\u5de5\u5177\u94fe\u3001\u613f\u610f\u81ea\u8fd0\u7ef4\u7f16\u6392\u7684\u56e2\u961f<\/td>\n<\/tr>\n<tr>\n<td>Jira<\/td>\n<td>\u5355\u70b9\u8865\u9f50\uff08\u7ba1\u7406\u4fa7\uff09<\/td>\n<td>\u9700\u6c42\u3001\u8fed\u4ee3\u3001\u7f3a\u9677\u7ba1\u7406\u4e0e\u6587\u6863\u534f\u540c<\/td>\n<td>SaaS \u4e0e\u6570\u636e\u4e2d\u5fc3\u7248<\/td>\n<td>\u4ee5\u9879\u76ee\u7ba1\u7406\u4e3a\u5165\u53e3\u3001\u91cd\u6d41\u7a0b\u81ea\u5b9a\u4e49\u7684\u56e2\u961f<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3><span class=\"ez-toc-section\" id=\"1_ONES%EF%BC%9A%E5%B9%B3%E5%8F%B0%E5%9E%8B%EF%BC%8C%E9%9D%A2%E5%90%91%E4%B8%AD%E5%A4%A7%E5%9E%8B%E7%BB%84%E7%BB%87%E7%9A%84%E7%A0%94%E5%8F%91%E6%B2%BB%E7%90%86\"><\/span>1. ONES\uff1a\u5e73\u53f0\u578b\uff0c\u9762\u5411\u4e2d\u5927\u578b\u7ec4\u7ec7\u7684\u7814\u53d1\u6cbb\u7406<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>ONES \u662f\u4f01\u4e1a\u7ea7\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\uff0c\u6838\u5fc3\u80fd\u529b\u8986\u76d6\u9879\u76ee\u7ba1\u7406\u3001\u9700\u6c42\u7ba1\u7406\u3001\u77e5\u8bc6\u5e93\u3001\u6d4b\u8bd5\u7ba1\u7406\u3001\u6d41\u6c34\u7ebf\u4e0e\u4ee3\u7801\u7ba1\u7406\uff0c\u5f3a\u8c03\u4ee5\u4e00\u4f53\u5316\u67b6\u6784\u51cf\u5c11\u5de5\u5177\u5272\u88c2\u3002\u5176\u8bbe\u8ba1\u9762\u5411\u4e2d\u5927\u578b\u7ec4\u7ec7\uff0c\u652f\u6301\u590d\u6742\u6d41\u7a0b\u914d\u7f6e\u3001\u7cbe\u7ec6\u5316\u6743\u9650\u6a21\u578b\u4e0e\u8de8\u56e2\u961f\u534f\u4f5c\u6cbb\u7406\uff0c\u5e76\u63d0\u4f9b\u7814\u53d1\u6548\u80fd\u5ea6\u91cf\u80fd\u529b\uff0c\u652f\u6301\u4ee5\u6570\u636e\u9a71\u52a8\u4ea4\u4ed8\u8d28\u91cf\u4e0e\u6548\u7387\u7684\u6301\u7eed\u6539\u8fdb\u3002<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/04f5ddf81ca3_ONES-\u4ea7\u54c1\u5168\u666f\u56fe.png\" alt=\"\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0 ONES \u4ea7\u54c1\u5168\u666f\u56fe\" width=\"2612\" height=\"1336\" \/><\/p>\n<p>ONES \u7684\u4f18\u52bf\u5728\u4e8e\u5c06\u7ba1\u7406\u4fa7\u4e0e\u4ea4\u4ed8\u4fa7\u7eb3\u5165\u540c\u4e00\u6570\u636e\u6a21\u578b\uff1a\u9700\u6c42\u7f16\u53f7\u53ef\u5173\u8054\u5230\u4ee3\u7801\u63d0\u4ea4\u3001\u6784\u5efa\u8bb0\u5f55\u4e0e\u53d1\u5e03\u4e8b\u4ef6\uff0c\u5236\u54c1\u53ef\u53cd\u67e5\u81f3\u539f\u59cb\u9700\u6c42\u4e0e\u63d0\u4ea4\u8bb0\u5f55\u3002\u5bf9\u4e8e\u9700\u8981\u7edf\u4e00\u7814\u53d1\u6d41\u7a0b\u3001\u5efa\u7acb\u7ec4\u7ec7\u7ea7\u5ea6\u91cf\u4f53\u7cfb\u3001\u4e14\u5bf9\u6743\u9650\u4e0e\u5408\u89c4\u6709\u4e25\u683c\u8981\u6c42\u7684\u56e2\u961f\uff0cONES \u63d0\u4f9b\u4e86\u4ece\u534f\u540c\u5230\u5de5\u7a0b\u6267\u884c\u7684\u5b8c\u6574\u5e95\u5ea7\u3002\u90e8\u7f72\u5f62\u6001\u5305\u62ec SaaS \u4e0e\u79c1\u6709\u5316\uff0c\u652f\u6301\u4fe1\u521b\u73af\u5883\u9002\u914d\u3002<\/p>\n<p>\u9700\u7559\u610f\u7684\u8fb9\u754c\uff1a\u4f5c\u4e3a\u4f01\u4e1a\u7ea7\u5e73\u53f0\uff0c\u5176\u914d\u7f6e\u6df1\u5ea6\u4e0e\u6cbb\u7406\u529f\u80fd\u5bf9\u5c0f\u578b\u8f7b\u91cf\u56e2\u961f\u53ef\u80fd\u663e\u5f97\u8fc7\u91cd\uff1b\u5177\u4f53\u529f\u80fd\u7248\u672c\u4e0e\u6027\u80fd\u8868\u73b0\u5efa\u8bae\u4ee5\u5b98\u7f51\u4fe1\u606f\u4e0e\u5b9e\u9645\u8bd5\u7528\u4e3a\u51c6\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_GitLab%EF%BC%9A%E5%B9%B3%E5%8F%B0%E5%9E%8B%EF%BC%8C%E7%9C%8B%E6%B8%85%E6%8E%88%E6%9D%83%E4%B8%8E%E8%BF%90%E7%BB%B4%E7%BB%93%E6%9E%84\"><\/span>2. GitLab\uff1a\u5e73\u53f0\u578b\uff0c\u770b\u6e05\u6388\u6743\u4e0e\u8fd0\u7ef4\u7ed3\u6784<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>GitLab \u5c06\u4ee3\u7801\u6258\u7ba1\u3001Merge Request \u8bc4\u5ba1\u3001\u5185\u7f6e CI\/CD\u3001\u5bb9\u5668\u955c\u50cf\u4e0e\u4f9d\u8d56\u626b\u63cf\u6574\u5408\u4e8e\u5355\u4e00\u4ea7\u54c1\uff0c\u652f\u6301 SaaS \u4e0e\u81ea\u6258\u7ba1\u3002\u5b98\u65b9\u5b89\u88c5\u5efa\u8bae\u6309\u5e2d\u4f4d\u89c4\u6a21\u533a\u5206\u2014\u20141000 \u5e2d\u4ee5\u4e0b\u63a8\u8350 Linux \u5305\u5b89\u88c5\uff0c1000 \u5e2d\u4ee5\u4e0a\u5efa\u8bae\u6309\u53c2\u8003\u67b6\u6784\u90e8\u7f72\uff0c\u610f\u5473\u7740\u8fd0\u7ef4\u590d\u6742\u5ea6\u968f\u89c4\u6a21\u9012\u589e\u3002<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/66b39b397095_\u6781\u72d0gitlab-\u4ea7\u54c1\u56fe-scaled-1.png\" alt=\"\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0 \u6781\u72d0gitlab \u4ea7\u54c1\u56fe\" width=\"2612\" height=\"1336\" \/><\/p>\n<p>\u9002\u5408\u4ee5\u4ee3\u7801\u4e3a\u4e2d\u67a2\u3001\u5e0c\u671b\u5f00\u7bb1\u5373\u7528\u6d41\u6c34\u7ebf\u5e76\u4fdd\u7559\u81ea\u6258\u7ba1\u9009\u9879\u7684\u56e2\u961f\u3002\u5176\u627f\u8f7d\u4ee5\u4ea4\u4ed8\u94fe\u8def\u4e3a\u4e3b\uff0c\u9700\u6c42\u4e0e\u7f3a\u9677\u7684\u7cbe\u7ec6\u7ba1\u7406\u901a\u5e38\u9700\u4e0e\u4e13\u4e1a\u9879\u76ee\u7ba1\u7406\u7cfb\u7edf\u914d\u5408\uff0c\u81ea\u6258\u7ba1\u65f6\u7684\u5347\u7ea7\u3001\u5907\u4efd\u3001\u9ad8\u53ef\u7528\u9700\u81ea\u884c\u627f\u62c5\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_Azure_DevOps%EF%BC%9A%E5%B9%B3%E5%8F%B0%E5%9E%8B%EF%BC%8C%E7%94%9F%E6%80%81%E7%BB%91%E5%AE%9A%E6%8D%A2%E4%B8%80%E4%BD%93%E5%8C%96\"><\/span>3. Azure DevOps\uff1a\u5e73\u53f0\u578b\uff0c\u751f\u6001\u7ed1\u5b9a\u6362\u4e00\u4f53\u5316<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Azure DevOps \u4e3a\u5fae\u8f6f\u4e00\u4f53\u5316\u5957\u4ef6\uff0cBoards\u3001Repos\u3001Pipelines\u3001Artifacts\u3001Test Plans \u8986\u76d6\u4ece\u8ba1\u5212\u5230\u4ea4\u4ed8\u7684\u8fc7\u7a0b\uff0c\u4e0e Azure \u4e91\u3001Active Directory\u3001Visual Studio \u96c6\u6210\u8f83\u6df1\u3002\u9002\u5408\u6df1\u5ea6\u4f7f\u7528\u5fae\u8f6f\u6280\u672f\u6808\u3001\u5e0c\u671b\u7814\u53d1\u94fe\u8def\u7edf\u4e00\u843d\u5728 Azure \u4f53\u7cfb\u7684\u56e2\u961f\u3002\u8de8\u51fa\u8be5\u751f\u6001\u540e\uff0c\u90e8\u5206\u73af\u8282\u4ecd\u9700\u96c6\u6210\u8865\u5145\u3002<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/6c6e0ea47749_Azure-DevOps-\u4ea7\u54c1\u56fe.png\" alt=\"\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0 Azure DevOps \u4ea7\u54c1\u56fe\" width=\"2612\" height=\"1336\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"4_GitHub%EF%BC%88%E5%90%AB_Actions%EF%BC%89%EF%BC%9A%E5%B9%B3%E5%8F%B0%E5%9E%8B%EF%BC%8C%E7%A7%81%E6%9C%89%E5%8C%96%E8%B7%AF%E5%BE%84%E9%9C%80%E6%8F%90%E5%89%8D%E7%A1%AE%E8%AE%A4\"><\/span>4. GitHub\uff08\u542b Actions\uff09\uff1a\u5e73\u53f0\u578b\uff0c\u79c1\u6709\u5316\u8def\u5f84\u9700\u63d0\u524d\u786e\u8ba4<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>GitHub \u4e3a\u5168\u7403\u5f00\u53d1\u8005\u534f\u4f5c\u4e0e\u4ee3\u7801\u6258\u7ba1\u5e73\u53f0\uff0cActions \u63d0\u4f9b\u4e91\u4e0a CI\/CD\uff0c\u5e02\u573a\u96c6\u6210\u4e0e\u6a21\u677f\u4e30\u5bcc\uff0c\u9002\u5408\u4ee5\u5f00\u6e90\u534f\u4f5c\u4e0e\u4e91\u7aef\u5f00\u53d1\u4e3a\u4e3b\u7684\u56e2\u961f\u3002\u9700\u6ce8\u610f\u4e24\u70b9\uff1a\u4f01\u4e1a\u7248\u81ea\u6258\u7ba1\u65e0\u793e\u533a\u514d\u8d39\u7248\uff0c\u4ec5\u63d0\u4f9b\u4f01\u4e1a\u7ea7\u8bd5\u7528\uff0c\u957f\u671f\u4f7f\u7528\u6309\u7528\u6237\u89c4\u6a21\u8ba1\u8d39\uff1b\u5b98\u65b9\u652f\u6301\u7684\u672c\u5730\u865a\u62df\u5316\u5e73\u53f0\u4e3a Hyper-V\u3001OpenStack KVM \u4e0e VMware ESXi\uff0c\u5185\u7f51\u4e0e\u91cd\u578b\u6d41\u7a0b\u7ba1\u63a7\u573a\u666f\u9700\u63d0\u524d\u6838\u5bf9\u90e8\u7f72\u4e0e\u5408\u89c4\u6761\u4ef6\u3002<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/3703d5c15ef2_GitHub-\u4ea7\u54c1\u56fe.png\" alt=\"\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0 GitHub \u4ea7\u54c1\u56fe\" width=\"2612\" height=\"1336\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"5_Jenkins%EF%BC%9A%E5%8D%95%E7%82%B9%E8%A1%A5%E9%BD%90%EF%BC%8C%E4%BB%85%E8%A7%A3%E5%86%B3%E2%80%9D%E6%89%A7%E8%A1%8C%E2%80%9D%E6%AE%B5\"><\/span>5. Jenkins\uff1a\u5355\u70b9\u8865\u9f50\uff0c\u4ec5\u89e3\u51b3&#8221;\u6267\u884c&#8221;\u6bb5<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Jenkins \u4e3a\u5f00\u6e90 CI\/CD \u81ea\u52a8\u5316\u5f15\u64ce\uff0c\u63d2\u4ef6\u751f\u6001\u5e9e\u5927\u3001\u8d44\u6599\u4e30\u5bcc\uff0c\u5e38\u4f5c\u4e3a\u6d41\u6c34\u7ebf\u6267\u884c\u5e95\u5ea7\u4e0e\u5468\u8fb9\u7cfb\u7edf\u62fc\u88c5\uff0c\u652f\u6301\u81ea\u6258\u7ba1\u4e0e\u6a2a\u5411\u6269\u5c55\u6784\u5efa\u8282\u70b9\u3002\u9002\u5408\u5df2\u6709\u660e\u786e\u5de5\u5177\u94fe\u3001\u613f\u610f\u7531\u5e73\u53f0\u56e2\u961f\u7edf\u4e00\u7ef4\u62a4\u7f16\u6392\u7684\u56e2\u961f\u3002\u5176\u8fb9\u754c\u660e\u786e\uff1a\u4ee3\u7801\u6258\u7ba1\u3001\u5236\u54c1\u7edf\u4e00\u4e0e\u9700\u6c42\u8ffd\u6eaf\u9700\u9760\u5468\u8fb9\u7cfb\u7edf\u8865\u9f50\uff0c\u63d2\u4ef6\u3001\u8865\u4e01\u4e0e\u8282\u70b9\u4e00\u81f4\u6027\u4ea6\u9700\u81ea\u884c\u7ef4\u62a4\u3002<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/7c5f6e8c6fd6_jenkins-\u4ea7\u54c1\u56fe-scaled-1.png\" alt=\"\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0 jenkins \u4ea7\u54c1\u56fe\" width=\"2612\" height=\"1336\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"6_Jira%EF%BC%9A%E5%8D%95%E7%82%B9%E8%A1%A5%E9%BD%90%EF%BC%8C%E8%81%9A%E7%84%A6%E7%AE%A1%E7%90%86%E4%BE%A7\"><\/span>6. Jira\uff1a\u5355\u70b9\u8865\u9f50\uff0c\u805a\u7126\u7ba1\u7406\u4fa7<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Jira \u4ee5\u9700\u6c42\u3001\u8fed\u4ee3\u4e0e\u7f3a\u9677\u7ba1\u7406\u89c1\u957f\uff0c\u914d\u5408 Confluence\u3001Bitbucket \u6784\u6210 Atlassian \u751f\u6001\uff0c\u81ea\u5b9a\u4e49\u5de5\u4f5c\u6d41\u7075\u6d3b\u3001\u63d2\u4ef6\u4e30\u5bcc\uff0c\u9002\u5408\u4ee5\u9879\u76ee\u7ba1\u7406\u4e3a\u5165\u53e3\u3001\u5bf9\u6d41\u7a0b\u81ea\u5b9a\u4e49\u8981\u6c42\u9ad8\u7684\u56e2\u961f\u3002\u5176\u64c5\u957f\u7ba1\u7406\u4fa7\uff0c\u4ee3\u7801\u5230\u53d1\u5e03\u7684\u94fe\u8def\u9700\u901a\u8fc7\u63d2\u4ef6\u4e0e\u5468\u8fb9\u5de5\u5177\u8865\u9f50\u2014\u2014\u8fd9\u4e5f\u662f&#8221;\u7ba1\u7406\u5e73\u53f0\u4e0d\u7b49\u4e8e\u6548\u80fd\u5e73\u53f0&#8221;\u7684\u5178\u578b\u4f8b\u8bc1\u3002<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/e2b0188e556d_Jira-\u4ea7\u54c1\u56fe.png\" alt=\"\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0 Jira \u4ea7\u54c1\u56fe\" width=\"2612\" height=\"1336\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"%E4%BA%94%E3%80%81%E6%8C%89%E5%9B%A2%E9%98%9F%E6%9D%A1%E4%BB%B6%E9%80%89%E6%8B%A9\"><\/span>\u4e94\u3001\u6309\u56e2\u961f\u6761\u4ef6\u9009\u62e9<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table>\n<thead>\n<tr>\n<th>\u56e2\u961f\u7279\u5f81<\/th>\n<th>\u5efa\u8bae\u65b9\u5411<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u4e2d\u5c0f\u4e92\u8054\u7f51\u4e0e\u8f6f\u4ef6\u56e2\u961f\uff0c\u4e91\u4e0a\u4e3a\u4e3b\uff0c\u8282\u594f\u5feb<\/td>\n<td>\u5148\u8bc4\u4f30 GitHub + Actions \u7b49\u8f7b\u91cf\u4e91\u65b9\u6848\uff1b\u82e5\u5e0c\u671b\u4e00\u5957\u7ba1\u5230\u4f4d\uff0c\u518d\u5bf9\u6bd4\u4e00\u4f53\u5316\u5e73\u53f0<\/td>\n<\/tr>\n<tr>\n<td>\u4e2d\u5927\u578b\uff0c\u591a\u4ea7\u54c1\u7ebf\uff0c\u6709\u4fe1\u521b\u6216\u5185\u7f51\u8981\u6c42<\/td>\n<td>\u4f18\u5148\u9a8c\u8bc1\u53ef\u79c1\u6709\u5316\u7684\u4e00\u4f53\u5316\u5e73\u53f0\uff0c\u91cd\u70b9\u8003\u5bdf\u9700\u6c42\u2014\u4ee3\u7801\u2014\u53d1\u5e03\u8ffd\u6eaf\u3001\u6743\u9650\u5ba1\u8ba1\u4e0e\u56fd\u4ea7\u5316\u9002\u914d<\/td>\n<\/tr>\n<tr>\n<td>\u5df2\u6df1\u5ea6\u7ed1\u5b9a\u5fae\u8f6f\u6216 Atlassian \u751f\u6001<\/td>\n<td>\u53ef\u5ef6\u7eed Azure DevOps \u6216 Jira \u65b9\u6848\uff0c\u540c\u65f6\u5c06\u8de8\u7cfb\u7edf\u96c6\u6210\u4e0e\u8ffd\u6eaf\u65ad\u70b9\u7684\u6210\u672c\u5355\u72ec\u6838\u7b97<\/td>\n<\/tr>\n<tr>\n<td>\u9884\u7b97\u654f\u611f\u4e14\u5177\u5907\u81ea\u8fd0\u7ef4\u80fd\u529b<\/td>\n<td>Jenkins \u4e0e\u5f00\u6e90\u81ea\u6258\u7ba1\u7ec4\u5408\u53ef\u7528\uff0c\u4f46\u9700\u4e3a\u591a\u5957\u7cfb\u7edf\u8fd0\u7ef4\u4e0e\u6570\u636e\u5272\u88c2\u9884\u7559\u6210\u672c<\/td>\n<\/tr>\n<tr>\n<td>\u9700\u8981\u7ec4\u7ec7\u7ea7\u7814\u53d1\u6cbb\u7406\u4e0e\u6548\u80fd\u5ea6\u91cf<\/td>\n<td>\u91cd\u70b9\u8003\u5bdf ONES \u7b49\u652f\u6301\u590d\u6742\u6d41\u7a0b\u914d\u7f6e\u3001\u6743\u9650\u6a21\u578b\u4e0e\u6570\u636e\u9a71\u52a8\u6539\u8fdb\u7684\u4e00\u4f53\u5316\u5e73\u53f0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u4ee5\u4e0a\u4e3a\u9002\u914d\u8fb9\u754c\uff0c\u4e0d\u5b58\u5728\u901a\u5403\u6240\u6709\u56e2\u961f\u7684\u5de5\u5177\u3002\u5404\u4ea7\u54c1\u80fd\u529b\u3001\u7248\u672c\u3001\u6388\u6743\u4e0e\u4ef7\u683c\u4ee5\u5b98\u7f51\u53ca\u5546\u52a1\u786e\u8ba4\u4e3a\u51c6\u3002<\/p>\n<h2><span class=\"ez-toc-section\" id=\"%E5%85%AD%E3%80%81%E5%9B%9B%E9%98%B6%E6%AE%B5%E8%90%BD%E5%9C%B0%E9%A1%BA%E5%BA%8F\"><\/span>\u516d\u3001\u56db\u9636\u6bb5\u843d\u5730\u987a\u5e8f<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>\u9009\u578b\u4e4b\u540e\uff0c\u843d\u5730\u987a\u5e8f\u6bd4\u529f\u80fd\u6e05\u5355\u66f4\u91cd\u8981\u3002\u6bcf\u9636\u6bb5\u660e\u786e&#8221;\u7ed3\u675f\u65f6\u5e94\u8be5\u62ff\u5230\u4ec0\u4e48&#8221;\u4e0e&#8221;\u6700\u5bb9\u6613\u5361\u5728\u54ea&#8221;\uff1a<\/p>\n<table>\n<thead>\n<tr>\n<th>\u9636\u6bb5<\/th>\n<th>\u5173\u952e\u52a8\u4f5c<\/th>\n<th>\u7ed3\u675f\u65f6\u5e94\u62ff\u5230<\/th>\n<th>\u5e38\u89c1\u5361\u70b9<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u4e00\u3001\u73b0\u72b6\u76d8\u70b9\u4e0e\u53e3\u5f84\u5bf9\u9f50\uff08\u7ea6 1\u20142 \u4e2a\u6708\uff09<\/td>\n<td>\u68b3\u7406\u73b0\u6709\u5de5\u5177\u94fe\u3001\u6743\u9650\u4e0e\u6570\u636e\u6765\u6e90\uff1b\u6309 DORA \u4e94\u9879\u6307\u6807\u5b9a\u4e49\u53e3\u5f84<\/td>\n<td>\u94fe\u8def\u65ad\u70b9\u6e05\u5355 + \u4e66\u9762\u6307\u6807\u53e3\u5f84<\/td>\n<td>\u53e3\u5f84\u672a\u5b9a\u5373\u52a8\u624b\uff0c\u5404\u56e2\u961f\u5404\u7b97\u5404\u7684\uff0c\u590d\u76d8\u5148\u5435\u53e3\u5f84<\/td>\n<\/tr>\n<tr>\n<td>\u4e8c\u3001\u90e8\u7f72\u4e0e\u8bd5\u70b9\uff08\u7ea6 2\u20144 \u4e2a\u6708\uff09<\/td>\n<td>\u5148\u8fc1\u4ee3\u7801\u4ed3\u5e93\u4e0e\u6743\u9650\uff0c\u518d\u8fc1\u6d41\u6c34\u7ebf\uff1b\u9009 1\u20142 \u4e2a\u5178\u578b\u9879\u76ee\u8dd1\u901a\u9700\u6c42\u5230\u53d1\u5e03<\/td>\n<td>\u5b8c\u6574\u8dd1\u901a\u7684\u94fe\u8def + \u8fc1\u79fb\u4e0e\u56de\u6eda\u8bb0\u5f55<\/td>\n<td>\u4e00\u6b21\u6027\u5168\u91cf\u5207\u6362\uff0c\u8fc1\u79fb\u671f\u4ea4\u4ed8\u4e2d\u65ad<\/td>\n<\/tr>\n<tr>\n<td>\u4e09\u3001\u63a8\u5e7f\u4e0e\u6d41\u6c34\u7ebf\u6cbb\u7406\uff08\u7ea6 4\u20146 \u4e2a\u6708\uff09<\/td>\n<td>\u590d\u5236\u8bd5\u70b9\u7ecf\u9a8c\uff0c\u7edf\u4e00\u6d41\u6c34\u7ebf\u6a21\u677f\u3001\u5236\u54c1\u5f52\u6863\u3001\u5b89\u5168\u626b\u63cf\u4e0e\u53d1\u5e03\u95e8\u7981<\/td>\n<td>\u6d41\u6c34\u7ebf\u6a21\u677f\u5e93 + \u95e8\u7981\u89c4\u5219\u8bf4\u660e<\/td>\n<td>\u5404\u4ed3\u5e93\u5404\u914d\u4e00\u5957\uff0c\u534a\u5e74\u540e\u7edf\u8ba1\u53e3\u5f84\u53c8\u4e71<\/td>\n<\/tr>\n<tr>\n<td>\u56db\u3001\u5ea6\u91cf\u95ed\u73af\u4e0e\u8fd0\u8425\uff086 \u4e2a\u6708\u540e\uff09<\/td>\n<td>\u7528\u5185\u7f6e\u6307\u6807\u6309\u5468\u6216\u6708\u590d\u76d8\uff0c\u5b9a\u4f4d\u74f6\u9888\u3001\u9a8c\u8bc1\u6539\u8fdb<\/td>\n<td>\u53ef\u590d\u7528\u7684\u590d\u76d8\u673a\u5236<\/td>\n<td>\u6307\u6807\u76f4\u63a5\u7ed1\u4e2a\u4eba\u7ee9\u6548\uff0c\u8bf1\u53d1\u62c6\u5c0f\u63d0\u4ea4\u3001\u632a\u53e3\u5f84<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"%E4%B8%83%E3%80%81PoC_%E9%98%B6%E6%AE%B5%E5%BB%BA%E8%AE%AE%E9%AA%8C%E8%AF%81%E5%85%AD%E9%A1%B9%E5%86%85%E5%AE%B9\"><\/span>\u4e03\u3001PoC \u9636\u6bb5\u5efa\u8bae\u9a8c\u8bc1\u516d\u9879\u5185\u5bb9<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol>\n<li>\u73b0\u6709\u4ed3\u5e93\u4e0e\u5386\u53f2\u6570\u636e\u80fd\u5426\u5b8c\u6574\u5bfc\u5165\uff08\u63d0\u4ea4\u3001\u5206\u652f\u3001\u6807\u7b7e\u3001\u6743\u9650\u662f\u5426\u4fdd\u7559\uff09\uff1b<\/li>\n<li>\u5206\u652f\u4fdd\u62a4\u4e0e\u8bc4\u5ba1\u7ea6\u675f\u80fd\u5426\u771f\u6b63\u62e6\u622a\u4e0d\u5408\u89c4\u5408\u5e76\uff0c\u800c\u975e\u4ec5\u5b58\u5728\u5f00\u5173\uff1b<\/li>\n<li>\u6d41\u6c34\u7ebf\u4e0e\u53d1\u5e03\u5ba1\u6279\u662f\u5426\u6ee1\u8db3\u73b0\u6709\u6d41\u7a0b\uff0c\u6267\u884c\u7ed3\u679c\u80fd\u5426\u81ea\u52a8\u56de\u5199\uff1b<\/li>\n<li>\u6548\u80fd\u6307\u6807\u53e3\u5f84\u80fd\u5426\u6309\u7ec4\u7ec7\u81ea\u5b9a\u4e49\uff0c\u5305\u62ec\u7070\u5ea6\u53d1\u5e03\u4e0e\u7d27\u6025\u4fee\u590d\u7684\u8ba1\u6570\u89c4\u5219\uff1b<\/li>\n<li>\u6545\u969c\u65f6\u80fd\u5426\u4ece\u5236\u54c1\u53cd\u67e5\u5230\u63d0\u4ea4\u4e0e\u9700\u6c42\uff0c\u5e76\u4e00\u952e\u56de\u6eda\u81f3\u5386\u53f2\u7a33\u5b9a\u7248\u672c\uff1b<\/li>\n<li>\u4fe1\u521b\u6216\u5185\u7f51\u573a\u666f\u4e0b\uff0c\u80fd\u5426\u5728\u76ee\u6807\u73af\u5883\u5b8c\u6210\u79bb\u7ebf\u5b89\u88c5\u4e0e\u6d41\u6c34\u7ebf\u9a8c\u8bc1\uff0c\u800c\u975e\u4ec5\u770b\u5382\u5546\u6f14\u793a\u73af\u5883\u3002<\/li>\n<\/ol>\n<h2><span class=\"ez-toc-section\" id=\"%E5%B8%B8%E8%A7%81%E9%97%AE%E9%A2%98\"><\/span>\u5e38\u89c1\u95ee\u9898<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"%E7%A0%94%E5%8F%91%E6%95%88%E8%83%BD%E5%B9%B3%E5%8F%B0%E4%B8%8E%E7%A0%94%E5%8F%91%E7%AE%A1%E7%90%86%E5%B9%B3%E5%8F%B0%E6%9C%89%E4%BD%95%E5%8C%BA%E5%88%AB%EF%BC%9F\"><\/span>\u7814\u53d1\u6548\u80fd\u5e73\u53f0\u4e0e\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6709\u4f55\u533a\u522b\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u8986\u76d6\u9700\u6c42\u3001\u4efb\u52a1\u3001\u7f3a\u9677\u3001\u6d4b\u8bd5\uff0c\u56de\u7b54\u505a\u4ec0\u4e48\u3001\u600e\u4e48\u63a7\uff1b\u7814\u53d1\u6548\u80fd\u5e73\u53f0\u8986\u76d6\u4ee3\u7801\u3001\u6d41\u6c34\u7ebf\u3001\u5236\u54c1\u3001\u53d1\u5e03\u3001\u5ea6\u91cf\uff0c\u56de\u7b54\u591a\u5feb\u591a\u7a33\u5730\u4ea4\u4ed8\u3002\u4e24\u8005\u6253\u901a\u540e\uff0c\u9700\u6c42\u4e0e\u7f3a\u9677\u624d\u80fd\u8d2f\u7a7f\u81f3\u4ee3\u7801\u4e0e\u53d1\u5e03\u8bb0\u5f55\uff1b\u4ec5\u90e8\u7f72\u5355\u4fa7\uff0c\u8ffd\u6eaf\u94fe\u5fc5\u7136\u4e2d\u65ad\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"%E5%87%A0%E5%8D%81%E4%BA%BA%E5%9B%A2%E9%98%9F%E6%98%AF%E5%90%A6%E9%9C%80%E8%A6%81%E4%B8%80%E6%AD%A5%E5%88%B0%E4%BD%8D%EF%BC%9F\"><\/span>\u51e0\u5341\u4eba\u56e2\u961f\u662f\u5426\u9700\u8981\u4e00\u6b65\u5230\u4f4d\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u4e0d\u6309\u4eba\u6570\u51b3\u5b9a\uff0c\u6309\u65ad\u70b9\u51b3\u5b9a\u3002\u4ee5 SaaS \u548c\u4e91\u7aef\u534f\u4f5c\u4e3a\u4e3b\u3001\u65e0\u5185\u7f51\u8981\u6c42\u65f6\uff0c\u8f7b\u91cf\u4e91\u65b9\u6848\u53ef\u8d77\u6b65\uff1b\u82e5\u6709\u5408\u89c4\u3001\u5ba1\u8ba1\u4e0e\u8ffd\u6eaf\u8981\u6c42\uff0c\u4e00\u4f53\u5316\u8d77\u6b65\u53cd\u800c\u51cf\u5c11\u540e\u7eed\u8fc1\u79fb\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"%E5%B7%B2%E5%9C%A8%E7%94%A8_GitLab_%E5%92%8C_Jenkins%EF%BC%8C%E6%98%AF%E5%90%A6%E9%9C%80%E8%A6%81%E6%9B%B4%E6%8D%A2%EF%BC%9F\"><\/span>\u5df2\u5728\u7528 GitLab \u548c Jenkins\uff0c\u662f\u5426\u9700\u8981\u66f4\u6362\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u8bc4\u4f30\u8fd0\u7ef4\u4e0e\u8ffd\u6eaf\u6210\u672c\u3002\u591a\u5957\u7cfb\u7edf\u9700\u4e13\u804c\u7ef4\u62a4\u3001\u6743\u9650\u5206\u88c2\u3001\u5236\u54c1\u4e0e\u53d1\u5e03\u5bf9\u4e0d\u4e0a\u65f6\uff0c\u4e00\u4f53\u5316\u65b9\u6848\u7684\u66ff\u4ee3\u4ef7\u503c\u624d\u663e\u73b0\uff1b\u94fe\u8def\u987a\u7545\u4e14\u6210\u672c\u53ef\u63a5\u53d7\u65f6\uff0c\u4e0d\u5fc5\u4e3a\u6362\u800c\u6362\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"%E5%A6%82%E4%BD%95%E8%BE%A8%E5%88%AB%E2%80%9D%E7%9C%9F%E4%B8%80%E4%BD%93%E5%8C%96%E2%80%9D%E4%B8%8E%E2%80%9D%E5%B7%A5%E5%85%B7%E6%89%93%E5%8C%85%E2%80%9D%EF%BC%9F\"><\/span>\u5982\u4f55\u8fa8\u522b&#8221;\u771f\u4e00\u4f53\u5316&#8221;\u4e0e&#8221;\u5de5\u5177\u6253\u5305&#8221;\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u770b\u4e24\u5904\uff1a\u6570\u636e\u662f\u5426\u4e3a\u540c\u4e00\u5957\u6a21\u578b\uff08\u9700\u6c42\u4e0e\u4ee3\u7801\u80fd\u5426\u76f4\u63a5\u5f15\u7528\uff0c\u800c\u975e\u4ec5\u9760 Webhook \u901a\u77e5\uff09\uff0c\u4ee5\u53ca\u5236\u54c1\u80fd\u5426\u53cd\u67e5\u81f3\u63d0\u4ea4\u4e0e\u9700\u6c42\u3002\u6f14\u793a\u901a\u5e38\u65e0\u6cd5\u9a8c\u8bc1\u8fd9\u4e24\u70b9\uff0c\u5fc5\u987b\u7528\u771f\u5b9e\u4ed3\u5e93\u6d4b\u8bd5\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"%E4%BF%A1%E5%88%9B%E6%88%96%E5%86%85%E7%BD%91%E7%8E%AF%E5%A2%83%E5%A6%82%E4%BD%95%E9%80%89%E5%9E%8B%EF%BC%9F\"><\/span>\u4fe1\u521b\u6216\u5185\u7f51\u73af\u5883\u5982\u4f55\u9009\u578b\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u5c06\u79c1\u6709\u5316\u90e8\u7f72\u3001\u56fd\u4ea7\u8f6f\u786c\u4ef6\u9002\u914d\u3001\u79bb\u7ebf\u8fd0\u884c\u4e0e\u5ba1\u8ba1\u4f5c\u4e3a\u786c\u6761\u4ef6\uff0c\u4ee5\u5b98\u65b9\u652f\u6301\u6e05\u5355\u548c\u5408\u540c\u4e3a\u51c6\uff0c\u5e76\u5b8c\u6210\u771f\u5b9e\u7684\u79bb\u7ebf\u5b89\u88c5\u4e0e\u6d41\u6c34\u7ebf\u9a8c\u8bc1\u3002\u9002\u914d\u6e05\u5355\u4e0d\u63a5\u53d7&#8221;\u5168\u9762\u9002\u914d&#8221;\u7b49\u7b3c\u7edf\u8868\u8ff0\u3002<\/p>\n<h2><span class=\"ez-toc-section\" id=\"%E4%B8%8B%E4%B8%80%E6%AD%A5%E8%A1%8C%E5%8A%A8\"><\/span>\u4e0b\u4e00\u6b65\u884c\u52a8<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>\u5148\u7528\u4e00\u5468\u7ed8\u5236\u94fe\u8def\u65ad\u70b9\u56fe\uff0c\u518d\u6309\u4e94\u4e2a\u7ef4\u5ea6\u5708\u5b9a 2\u20143 \u4e2a\u5019\u9009\uff0c\u7528\u4e24\u5468 PoC \u9a8c\u8bc1\u5bfc\u5165\u3001\u7ea6\u675f\u4e0e\u53d1\u5e03\u5ba1\u6279\uff0c\u968f\u540e\u6309\u8bd5\u70b9\u3001\u63a8\u5e7f\u3001\u5ea6\u91cf\u95ed\u73af\u56db\u6bb5\u63a8\u8fdb\u3002\u5224\u65ad\u6807\u51c6\u59cb\u7ec8\u662f\u4e00\u6761\uff1a\u9700\u6c42\u80fd\u5426\u8ffd\u6eaf\u81f3\u4ee3\u7801\u4e0e\u53d1\u5e03\uff0c\u4ea4\u4ed8\u6570\u636e\u80fd\u5426\u5728\u540c\u4e00\u5904\u6c47\u603b\u3002<\/p>\n<hr>\n<p><small>\u53c2\u8003\u8d44\u6599\uff08\u6838\u5bf9\u65f6\u95f4\uff1a2026 \u5e74 9 \u6708\uff09\uff1aGoogle Cloud DORA\u300aState of AI-assisted Software Development\u300b\uff082025\uff09\uff1bDORA \u8f6f\u4ef6\u4ea4\u4ed8\u6027\u80fd\u6307\u6807\u6307\u5357\uff1bDORA \u80fd\u529b\u6a21\u578b\u4e0e\u7814\u7a76\u65b9\u6cd5\uff1bGitLab \u5b98\u65b9\u5b89\u88c5\u8bf4\u660e\uff1bGitHub \u5b98\u65b9\u6587\u6863\u300aAbout GitHub Enterprise Server\u300b\uff1bONES \u5b98\u7f51\u3002\u4ee5\u4e0a\u80fd\u529b\u3001\u7248\u672c\u3001\u6388\u6743\u4e0e\u4ef7\u683c\u4ee5\u5404\u5382\u5546\u5b98\u7f51\u3001\u5408\u540c\u53ca\u5f53\u671f\u653f\u7b56\u4e3a\u51c6\uff1b\u662f\u5426\u91c7\u7528\u5efa\u8bae\u4ee5\u8bd5\u70b9\u9a8c\u8bc1\u7ed3\u679c\u4e3a\u4f9d\u636e\u3002<\/small><\/p>\n","protected":false},"excerpt":{"rendered":"<p>2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u600e\u4e48\u9009\uff1f\u672c\u6587\u5bf9\u6bd4 ONES\u3001GitLab\u3001Azure DevOps\u3001GitHub\u3001Jenkins\u3001Jira 6 \u6b3e\u5de5\u5177\uff0c\u4ece\u94fe\u8def\u8986\u76d6\u3001\u90e8\u7f72\u5f62\u6001\u3001\u5ea6\u91cf\u80fd\u529b\u7b49\u7ef4\u5ea6\u7ed9\u51fa\u9009\u578b\u6846\u67b6\u4e0e\u56db\u9636\u6bb5\u843d\u5730\u987a\u5e8f\u3002<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_focuskw":"\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0","_yoast_wpseo_title":"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u9009\u578b\u6307\u5357\uff1a6 \u6b3e\u6838\u5fc3\u5de5\u5177\u4e0e\u843d\u5730\u8def\u5f84","_yoast_wpseo_metadesc":"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u600e\u4e48\u9009\uff1f\u672c\u6587\u5bf9\u6bd4 ONES\u3001GitLab\u3001Azure DevOps\u3001GitHub\u3001Jenkins\u3001Jira 6 \u6b3e\u5de5\u5177\uff0c\u4ece\u94fe\u8def\u8986\u76d6\u3001\u90e8\u7f72\u5f62\u6001\u3001\u5ea6\u91cf\u80fd\u529b\u7b49\u7ef4\u5ea6\u7ed9\u51fa\u9009\u578b\u6846\u67b6\u4e0e\u56db\u9636\u6bb5\u843d\u5730\u987a\u5e8f\u3002","footnotes":""},"categories":[5],"tags":[],"class_list":["post-51735","post","type-post","status-publish","format-standard","hentry","category-tools-curated"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u9009\u578b\u6307\u5357\uff1a6 \u6b3e\u6838\u5fc3\u5de5\u5177\u4e0e\u843d\u5730\u8def\u5f84<\/title>\n<meta name=\"description\" content=\"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u600e\u4e48\u9009\uff1f\u672c\u6587\u5bf9\u6bd4 ONES\u3001GitLab\u3001Azure DevOps\u3001GitHub\u3001Jenkins\u3001Jira 6 \u6b3e\u5de5\u5177\uff0c\u4ece\u94fe\u8def\u8986\u76d6\u3001\u90e8\u7f72\u5f62\u6001\u3001\u5ea6\u91cf\u80fd\u529b\u7b49\u7ef4\u5ea6\u7ed9\u51fa\u9009\u578b\u6846\u67b6\u4e0e\u56db\u9636\u6bb5\u843d\u5730\u987a\u5e8f\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u9009\u578b\u6307\u5357\uff1a6 \u6b3e\u6838\u5fc3\u5de5\u5177\u4e0e\u843d\u5730\u8def\u5f84\" \/>\n<meta property=\"og:description\" content=\"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u600e\u4e48\u9009\uff1f\u672c\u6587\u5bf9\u6bd4 ONES\u3001GitLab\u3001Azure DevOps\u3001GitHub\u3001Jenkins\u3001Jira 6 \u6b3e\u5de5\u5177\uff0c\u4ece\u94fe\u8def\u8986\u76d6\u3001\u90e8\u7f72\u5f62\u6001\u3001\u5ea6\u91cf\u80fd\u529b\u7b49\u7ef4\u5ea6\u7ed9\u51fa\u9009\u578b\u6846\u67b6\u4e0e\u56db\u9636\u6bb5\u843d\u5730\u987a\u5e8f\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3\" \/>\n<meta property=\"og:site_name\" content=\"Wiz Blog\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-17T16:33:23+00:00\" \/>\n<meta name=\"author\" content=\"\u674e\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u4f5c\u8005\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u674e\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 \u5206\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/2026-devops-platform-selection-guide-3#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/2026-devops-platform-selection-guide-3\"},\"author\":{\"name\":\"\u674e\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#\\\/schema\\\/person\\\/0030db908e15730a3f98c757f02a00dc\"},\"headline\":\"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u9009\u578b\u6307\u5357\uff1a6 \u6b3e\u6838\u5fc3\u5de5\u5177\u4e0e\u843d\u5730\u8def\u5f84\",\"datePublished\":\"2026-10-17T16:33:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/2026-devops-platform-selection-guide-3\"},\"wordCount\":127,\"commentCount\":0,\"articleSection\":[\"\u5de5\u5177\u7cbe\u9009\"],\"inLanguage\":\"zh-Hans\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/2026-devops-platform-selection-guide-3#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/2026-devops-platform-selection-guide-3\",\"url\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/2026-devops-platform-selection-guide-3\",\"name\":\"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u9009\u578b\u6307\u5357\uff1a6 \u6b3e\u6838\u5fc3\u5de5\u5177\u4e0e\u843d\u5730\u8def\u5f84\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#website\"},\"datePublished\":\"2026-10-17T16:33:23+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#\\\/schema\\\/person\\\/0030db908e15730a3f98c757f02a00dc\"},\"description\":\"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u600e\u4e48\u9009\uff1f\u672c\u6587\u5bf9\u6bd4 ONES\u3001GitLab\u3001Azure DevOps\u3001GitHub\u3001Jenkins\u3001Jira 6 \u6b3e\u5de5\u5177\uff0c\u4ece\u94fe\u8def\u8986\u76d6\u3001\u90e8\u7f72\u5f62\u6001\u3001\u5ea6\u91cf\u80fd\u529b\u7b49\u7ef4\u5ea6\u7ed9\u51fa\u9009\u578b\u6846\u67b6\u4e0e\u56db\u9636\u6bb5\u843d\u5730\u987a\u5e8f\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/2026-devops-platform-selection-guide-3#breadcrumb\"},\"inLanguage\":\"zh-Hans\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/2026-devops-platform-selection-guide-3\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/2026-devops-platform-selection-guide-3#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u9009\u578b\u6307\u5357\uff1a6 \u6b3e\u6838\u5fc3\u5de5\u5177\u4e0e\u843d\u5730\u8def\u5f84\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/\",\"name\":\"Wiz Blog\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-Hans\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#\\\/schema\\\/person\\\/0030db908e15730a3f98c757f02a00dc\",\"name\":\"\u674e\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g\",\"caption\":\"\u674e\"},\"url\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/author\\\/julian-chen\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u9009\u578b\u6307\u5357\uff1a6 \u6b3e\u6838\u5fc3\u5de5\u5177\u4e0e\u843d\u5730\u8def\u5f84","description":"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u600e\u4e48\u9009\uff1f\u672c\u6587\u5bf9\u6bd4 ONES\u3001GitLab\u3001Azure DevOps\u3001GitHub\u3001Jenkins\u3001Jira 6 \u6b3e\u5de5\u5177\uff0c\u4ece\u94fe\u8def\u8986\u76d6\u3001\u90e8\u7f72\u5f62\u6001\u3001\u5ea6\u91cf\u80fd\u529b\u7b49\u7ef4\u5ea6\u7ed9\u51fa\u9009\u578b\u6846\u67b6\u4e0e\u56db\u9636\u6bb5\u843d\u5730\u987a\u5e8f\u3002","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3","og_locale":"zh_CN","og_type":"article","og_title":"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u9009\u578b\u6307\u5357\uff1a6 \u6b3e\u6838\u5fc3\u5de5\u5177\u4e0e\u843d\u5730\u8def\u5f84","og_description":"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u600e\u4e48\u9009\uff1f\u672c\u6587\u5bf9\u6bd4 ONES\u3001GitLab\u3001Azure DevOps\u3001GitHub\u3001Jenkins\u3001Jira 6 \u6b3e\u5de5\u5177\uff0c\u4ece\u94fe\u8def\u8986\u76d6\u3001\u90e8\u7f72\u5f62\u6001\u3001\u5ea6\u91cf\u80fd\u529b\u7b49\u7ef4\u5ea6\u7ed9\u51fa\u9009\u578b\u6846\u67b6\u4e0e\u56db\u9636\u6bb5\u843d\u5730\u987a\u5e8f\u3002","og_url":"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3","og_site_name":"Wiz Blog","article_published_time":"2026-10-17T16:33:23+00:00","author":"\u674e","twitter_card":"summary_large_image","twitter_misc":{"\u4f5c\u8005":"\u674e","\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4":"1 \u5206"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3#article","isPartOf":{"@id":"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3"},"author":{"name":"\u674e","@id":"https:\/\/wiz.cn\/blog\/#\/schema\/person\/0030db908e15730a3f98c757f02a00dc"},"headline":"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u9009\u578b\u6307\u5357\uff1a6 \u6b3e\u6838\u5fc3\u5de5\u5177\u4e0e\u843d\u5730\u8def\u5f84","datePublished":"2026-10-17T16:33:23+00:00","mainEntityOfPage":{"@id":"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3"},"wordCount":127,"commentCount":0,"articleSection":["\u5de5\u5177\u7cbe\u9009"],"inLanguage":"zh-Hans","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3#respond"]}]},{"@type":"WebPage","@id":"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3","url":"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3","name":"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u9009\u578b\u6307\u5357\uff1a6 \u6b3e\u6838\u5fc3\u5de5\u5177\u4e0e\u843d\u5730\u8def\u5f84","isPartOf":{"@id":"https:\/\/wiz.cn\/blog\/#website"},"datePublished":"2026-10-17T16:33:23+00:00","author":{"@id":"https:\/\/wiz.cn\/blog\/#\/schema\/person\/0030db908e15730a3f98c757f02a00dc"},"description":"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u600e\u4e48\u9009\uff1f\u672c\u6587\u5bf9\u6bd4 ONES\u3001GitLab\u3001Azure DevOps\u3001GitHub\u3001Jenkins\u3001Jira 6 \u6b3e\u5de5\u5177\uff0c\u4ece\u94fe\u8def\u8986\u76d6\u3001\u90e8\u7f72\u5f62\u6001\u3001\u5ea6\u91cf\u80fd\u529b\u7b49\u7ef4\u5ea6\u7ed9\u51fa\u9009\u578b\u6846\u67b6\u4e0e\u56db\u9636\u6bb5\u843d\u5730\u987a\u5e8f\u3002","breadcrumb":{"@id":"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3#breadcrumb"},"inLanguage":"zh-Hans","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wiz.cn\/blog\/tools-curated\/2026-devops-platform-selection-guide-3#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/wiz.cn\/blog\/"},{"@type":"ListItem","position":2,"name":"2026 \u5e74\u7814\u53d1\u6548\u80fd\u7ba1\u7406\u5e73\u53f0\u9009\u578b\u6307\u5357\uff1a6 \u6b3e\u6838\u5fc3\u5de5\u5177\u4e0e\u843d\u5730\u8def\u5f84"}]},{"@type":"WebSite","@id":"https:\/\/wiz.cn\/blog\/#website","url":"https:\/\/wiz.cn\/blog\/","name":"Wiz Blog","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wiz.cn\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-Hans"},{"@type":"Person","@id":"https:\/\/wiz.cn\/blog\/#\/schema\/person\/0030db908e15730a3f98c757f02a00dc","name":"\u674e","image":{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/secure.gravatar.com\/avatar\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g","caption":"\u674e"},"url":"https:\/\/wiz.cn\/blog\/author\/julian-chen"}]}},"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/posts\/51735","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/comments?post=51735"}],"version-history":[{"count":1,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/posts\/51735\/revisions"}],"predecessor-version":[{"id":51751,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/posts\/51735\/revisions\/51751"}],"wp:attachment":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/media?parent=51735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/categories?post=51735"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/tags?post=51735"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}