{"id":30726,"date":"2026-10-23T13:00:25","date_gmt":"2026-10-23T05:00:25","guid":{"rendered":"https:\/\/wiz.cn\/blog\/?p=30726"},"modified":"2026-10-23T13:00:25","modified_gmt":"2026-10-23T05:00:25","slug":"ai-tools-review-26","status":"publish","type":"post","link":"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26","title":{"rendered":"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\uff1a2026\u5e74\u9009\u578b\u6307\u5357\u4e0e\u5bf9\u6bd4\u8bc4\u6d4b"},"content":{"rendered":"<p>2026\u5e74\u9009AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\uff0c\u6838\u5fc3\u4e0d\u662f\u6bd4\u529f\u80fd\u591a\u5c11\uff0c\u800c\u662f\u770b\u4f60\u7684\u56e2\u961f\u5c5e\u4e8e\u201c\u4ee3\u7801\u9a71\u52a8\u578b\u201d\u8fd8\u662f\u201c\u6587\u6863\u9a71\u52a8\u578b\u201d\u3002\u524d\u8005\u9700\u8981\u5de5\u5177\u80fd\u81ea\u52a8\u5173\u8054\u4ee3\u7801\u4ed3\u5e93\u4e0e\u6587\u6863\uff0c\u540e\u8005\u66f4\u770b\u91cd\u7ed3\u6784\u5316\u77e5\u8bc6\u5e93\u4e0eAI\u68c0\u7d22\u3002<\/p>\n<p>\u672c\u6587\u4eceAI\u77e5\u8bc6\u5e93\u6784\u5efa\u3001\u4ee3\u7801\u6587\u6863\u5173\u8054\u3001AI\u6458\u8981\u751f\u6210\u3001\u6743\u9650\u7ba1\u63a7\u548c\u7248\u672c\u7ba1\u7406\u4e94\u4e2a\u7ef4\u5ea6\uff0c\u5bf9ONES\u3001Tower\u3001Notion\u3001Confluence\u3001Slab\u3001Guru\u7b49\u4e3b\u6d41\u5de5\u5177\u8fdb\u884c\u4e86\u6a2a\u5411\u5bf9\u6bd4\uff0c\u5e2e\u4f60\u5feb\u901f\u9501\u5b9a\u9002\u5408\u56e2\u961f\u7684\u90a3\u4e00\u6b3e\u3002<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_83 counter-hierarchy ez-toc-counter ez-toc-light-blue ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#2026%E5%B9%B4AI%E7%A0%94%E5%8F%91%E7%9F%A5%E8%AF%86%E7%AE%A1%E7%90%86%E5%B7%A5%E5%85%B7%E9%80%89%E5%9E%8B%EF%BC%9A%E5%BF%AB%E9%80%9F%E7%BB%93%E8%AE%BA%E4%B8%8E%E9%80%9F%E8%A7%88\" >2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u9009\u578b\uff1a\u5feb\u901f\u7ed3\u8bba\u4e0e\u901f\u89c8<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#%E9%80%89%E5%9E%8B%E6%96%B9%E6%B3%95%E4%B8%8E%E6%A0%B8%E5%BF%83%E6%B5%8B%E8%AF%84%E7%BB%B4%E5%BA%A6%EF%BC%9A%E5%A6%82%E4%BD%95%E8%AF%84%E4%BC%B0AI%E7%A0%94%E5%8F%91%E7%9F%A5%E8%AF%86%E7%AE%A1%E7%90%86%E8%83%BD%E5%8A%9B\" >\u9009\u578b\u65b9\u6cd5\u4e0e\u6838\u5fc3\u6d4b\u8bc4\u7ef4\u5ea6\uff1a\u5982\u4f55\u8bc4\u4f30AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u80fd\u529b<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#2026%E5%B9%B4AI%E7%A0%94%E5%8F%91%E7%9F%A5%E8%AF%86%E7%AE%A1%E7%90%86%E5%B7%A5%E5%85%B7%E6%B7%B1%E5%BA%A6%E6%B5%8B%E8%AF%84%EF%BC%9A%E6%A0%B8%E5%BF%83%E8%83%BD%E5%8A%9B%E9%80%90%E9%A1%B9%E5%AF%B9%E6%AF%94\" >2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u6df1\u5ea6\u6d4b\u8bc4\uff1a\u6838\u5fc3\u80fd\u529b\u9010\u9879\u5bf9\u6bd4<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#ONES\" >ONES<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#Tower\" >Tower<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#Notion\" >Notion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#Confluence\" >Confluence<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#Slab\" >Slab<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#Guru\" >Guru<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#Outline\" >Outline<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#Bloomfire\" >Bloomfire<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#%E5%B7%A5%E5%85%B7%E4%BD%BF%E7%94%A8%E5%BB%BA%E8%AE%AE%E4%B8%8E2026%E5%B9%B4%E9%80%89%E5%9E%8B%E6%80%BB%E7%BB%93\" >\u5de5\u5177\u4f7f\u7528\u5efa\u8bae\u4e0e2026\u5e74\u9009\u578b\u603b\u7ed3<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#2026%E5%B9%B4AI%E7%A0%94%E5%8F%91%E7%9F%A5%E8%AF%86%E7%AE%A1%E7%90%86%E5%B7%A5%E5%85%B7%E9%80%89%E5%9E%8B%E5%B8%B8%E8%A7%81%E9%97%AE%E9%A2%98\" >2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u9009\u578b\u5e38\u89c1\u95ee\u9898<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#2026%E5%B9%B4AI%E7%A0%94%E5%8F%91%E7%9F%A5%E8%AF%86%E7%AE%A1%E7%90%86%E5%B7%A5%E5%85%B7%E9%80%89%E5%9E%8B%EF%BC%8C%E6%9C%80%E5%BA%94%E8%AF%A5%E5%85%B3%E6%B3%A8%E5%93%AA%E4%B8%AA%E8%83%BD%E5%8A%9B%EF%BC%9F\" >2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u9009\u578b\uff0c\u6700\u5e94\u8be5\u5173\u6ce8\u54ea\u4e2a\u80fd\u529b\uff1f<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#ONES%E5%92%8CConfluence%E5%9C%A8%E7%A0%94%E5%8F%91%E7%9F%A5%E8%AF%86%E7%AE%A1%E7%90%86%E4%B8%8A%E6%9C%89%E4%BB%80%E4%B9%88%E5%8C%BA%E5%88%AB%EF%BC%9F\" >ONES\u548cConfluence\u5728\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u4e0a\u6709\u4ec0\u4e48\u533a\u522b\uff1f<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#%E5%B0%8F%E5%9E%8B%E7%A0%94%E5%8F%91%E5%9B%A2%E9%98%9F%EF%BC%8810%E4%BA%BA%E4%BB%A5%E4%B8%8B%EF%BC%89%E9%80%82%E5%90%88%E7%94%A8%E5%93%AA%E6%AC%BE%E5%B7%A5%E5%85%B7%EF%BC%9F\" >\u5c0f\u578b\u7814\u53d1\u56e2\u961f\uff0810\u4eba\u4ee5\u4e0b\uff09\u9002\u5408\u7528\u54ea\u6b3e\u5de5\u5177\uff1f<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#AI%E8%BE%85%E5%8A%A9%E5%86%85%E5%AE%B9%E7%94%9F%E6%88%90%E5%8A%9F%E8%83%BD%E5%9C%A8%E7%A0%94%E5%8F%91%E5%9C%BA%E6%99%AF%E4%B8%AD%E5%AE%9E%E7%94%A8%E5%90%97%EF%BC%9F\" >AI\u8f85\u52a9\u5185\u5bb9\u751f\u6210\u529f\u80fd\u5728\u7814\u53d1\u573a\u666f\u4e2d\u5b9e\u7528\u5417\uff1f<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\/#%E5%A6%82%E4%BD%95%E8%AF%84%E4%BC%B0%E4%B8%80%E6%AC%BE%E5%B7%A5%E5%85%B7%E7%9A%84%E6%9D%83%E9%99%90%E7%AE%A1%E6%8E%A7%E6%98%AF%E5%90%A6%E6%BB%A1%E8%B6%B3%E7%A0%94%E5%8F%91%E5%9B%A2%E9%98%9F%E9%9C%80%E6%B1%82%EF%BC%9F\" >\u5982\u4f55\u8bc4\u4f30\u4e00\u6b3e\u5de5\u5177\u7684\u6743\u9650\u7ba1\u63a7\u662f\u5426\u6ee1\u8db3\u7814\u53d1\u56e2\u961f\u9700\u6c42\uff1f<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"2026%E5%B9%B4AI%E7%A0%94%E5%8F%91%E7%9F%A5%E8%AF%86%E7%AE%A1%E7%90%86%E5%B7%A5%E5%85%B7%E9%80%89%E5%9E%8B%EF%BC%9A%E5%BF%AB%E9%80%9F%E7%BB%93%E8%AE%BA%E4%B8%8E%E9%80%9F%E8%A7%88\"><\/span>2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u9009\u578b\uff1a\u5feb\u901f\u7ed3\u8bba\u4e0e\u901f\u89c8<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>\u7ecf\u8fc7\u5bf98\u6b3e\u5de5\u5177\u7684\u6a2a\u5411\u5bf9\u6bd4\uff0c\u6ca1\u6709\u4e00\u6b3e\u5de5\u5177\u80fd\u5b8c\u7f8e\u9002\u914d\u6240\u6709\u7814\u53d1\u56e2\u961f\u3002\u5982\u679c\u4f60\u7684\u56e2\u961f\u4ee5\u4ee3\u7801\u5e93\u4e3a\u6838\u5fc3\uff0c\u9700\u8981AI\u81ea\u52a8\u5173\u8054\u6587\u6863\u4e0e\u4ee3\u7801\uff0cONES\u5728AI\u77e5\u8bc6\u5e93\u6784\u5efa\u548c\u7814\u53d1\u6587\u6863\u5173\u8054\u4e0a\u8868\u73b0\u6700\u5168\u9762\u3002\u5982\u679c\u56e2\u961f\u89c4\u6a21\u5c0f\u3001\u8ffd\u6c42\u8f7b\u91cf\uff0cSlab\u548cGuru\u7684AI\u6458\u8981\u529f\u80fd\u66f4\u76f4\u63a5\u3002Notion\u548cConfluence\u9002\u5408\u901a\u7528\u77e5\u8bc6\u7ba1\u7406\uff0c\u4f46\u7814\u53d1\u4e13\u7528\u80fd\u529b\u9700\u8981\u989d\u5916\u914d\u7f6e\u3002\u9009\u578b\u7684\u5173\u952e\u662f\u5148\u660e\u786e\u4f60\u7684\u56e2\u961f\u6700\u9700\u8981\u89e3\u51b3\u54ea\u4e2a\u73af\u8282\u7684\u75db\u70b9\u3002<\/p>\n<ul>\n<li>\u5982\u679c\u56e2\u961f\u5df2\u6709\u5927\u91cf\u4ee3\u7801\u4ed3\u5e93\uff0c\u9700\u8981AI\u81ea\u52a8\u63d0\u53d6\u5173\u952e\u4fe1\u606f\u5e76\u5173\u8054\u6587\u6863\uff0c\u4f18\u5148\u8003\u8651ONES\u3002<\/li>\n<li>\u5982\u679c\u56e2\u961f\u4ee5\u4ea7\u54c1\u6587\u6863\u548c\u5185\u90e8Wiki\u4e3a\u4e3b\uff0c\u5bf9AI\u68c0\u7d22\u8981\u6c42\u9ad8\uff0cConfluence\u548cNotion\u7684\u751f\u6001\u66f4\u6210\u719f\u3002<\/li>\n<li>\u5982\u679c\u56e2\u961f\u89c4\u6a21\u572820\u4eba\u4ee5\u4e0b\uff0c\u8ffd\u6c42\u5feb\u901f\u4e0a\u624b\u548c\u4f4e\u7ef4\u62a4\u6210\u672c\uff0cSlab\u6216Guru\u7684AI\u6458\u8981\u529f\u80fd\u66f4\u5b9e\u7528\u3002<\/li>\n<li>\u5982\u679c\u56e2\u961f\u9700\u8981\u4e25\u683c\u7684\u77e5\u8bc6\u6743\u9650\u7ba1\u63a7\u548c\u7248\u672c\u8ffd\u6eaf\uff0cONES\u548cBloomfire\u7684\u6743\u9650\u7c92\u5ea6\u66f4\u7ec6\u3002<\/li>\n<li>\u5982\u679c\u56e2\u961f\u4e3b\u8981\u4f7f\u7528\u82f1\u6587\u6587\u6863\uff0c\u4e14\u5bf9AI\u751f\u6210\u5185\u5bb9\u8d28\u91cf\u8981\u6c42\u9ad8\uff0cOutline\u7684AI\u8f85\u52a9\u5199\u4f5c\u80fd\u529b\u503c\u5f97\u5173\u6ce8\u3002<\/li>\n<\/ul>\n<table>\n<thead>\n<tr>\n<th>\u5de5\u5177\u540d\u79f0<\/th>\n<th>\u6838\u5fc3\u5b9a\u4f4d<\/th>\n<th>\u9002\u7528\u56e2\u961f\u7c7b\u578b<\/th>\n<th>\u4e3b\u8981\u9002\u914d\u70b9<\/th>\n<th>\u9009\u578b\u786e\u8ba4\u70b9<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>ONES<\/td>\n<td>AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5e73\u53f0<\/td>\n<td>\u4e2d\u5927\u578b\u7814\u53d1\u56e2\u961f<\/td>\n<td>AI\u77e5\u8bc6\u5e93\u6784\u5efa\u3001\u4ee3\u7801\u4e0e\u6587\u6863\u5173\u8054\u3001\u7248\u672c\u7ba1\u7406<\/td>\n<td>\u786e\u8ba4\u662f\u5426\u652f\u6301\u73b0\u6709\u4ee3\u7801\u4ed3\u5e93\u7684API\u5bf9\u63a5<\/td>\n<\/tr>\n<tr>\n<td>Tower<\/td>\n<td>\u9879\u76ee\u534f\u4f5c\u4e0e\u6587\u6863\u7ba1\u7406<\/td>\n<td>\u4e2d\u5c0f\u578b\u9879\u76ee\u56e2\u961f<\/td>\n<td>\u4efb\u52a1\u4e0e\u6587\u6863\u5173\u8054\u3001\u57fa\u7840\u6743\u9650<\/td>\n<td>\u786e\u8ba4AI\u68c0\u7d22\u529f\u80fd\u662f\u5426\u6ee1\u8db3\u7814\u53d1\u573a\u666f<\/td>\n<\/tr>\n<tr>\n<td>Notion<\/td>\n<td>\u901a\u7528\u77e5\u8bc6\u5e93\u4e0e\u534f\u4f5c<\/td>\n<td>\u5404\u7c7b\u56e2\u961f<\/td>\n<td>AI\u5199\u4f5c\u3001\u7075\u6d3b\u9875\u9762\u3001\u6a21\u677f\u4e30\u5bcc<\/td>\n<td>\u786e\u8ba4\u662f\u5426\u63a5\u53d7\u7b2c\u4e09\u65b9\u63d2\u4ef6\u5b9e\u73b0\u4ee3\u7801\u5173\u8054<\/td>\n<\/tr>\n<tr>\n<td>Confluence<\/td>\n<td>\u4f01\u4e1a\u7ea7\u77e5\u8bc6\u7ba1\u7406<\/td>\n<td>\u5927\u578b\u4f01\u4e1a<\/td>\n<td>\u6587\u6863\u7ed3\u6784\u5316\u3001\u6743\u9650\u4f53\u7cfb\u3001\u96c6\u6210\u80fd\u529b<\/td>\n<td>\u786e\u8ba4AI\u529f\u80fd\u662f\u5426\u9700\u8981\u989d\u5916\u4ed8\u8d39<\/td>\n<\/tr>\n<tr>\n<td>Slab<\/td>\n<td>\u8f7b\u91cf\u77e5\u8bc6\u5e93<\/td>\n<td>\u5c0f\u578b\u6280\u672f\u56e2\u961f<\/td>\n<td>AI\u6458\u8981\u3001\u641c\u7d22\u5feb\u3001\u754c\u9762\u7b80\u6d01<\/td>\n<td>\u786e\u8ba4\u662f\u5426\u652f\u6301\u4ee3\u7801\u7247\u6bb5\u9ad8\u4eae<\/td>\n<\/tr>\n<tr>\n<td>Guru<\/td>\n<td>AI\u77e5\u8bc6\u5361\u7247<\/td>\n<td>\u9500\u552e\u4e0e\u6280\u672f\u652f\u6301\u56e2\u961f<\/td>\n<td>AI\u5185\u5bb9\u751f\u6210\u3001\u77e5\u8bc6\u9a8c\u8bc1\u3001\u6d4f\u89c8\u5668\u63d2\u4ef6<\/td>\n<td>\u786e\u8ba4\u7814\u53d1\u6587\u6863\u7684\u683c\u5f0f\u517c\u5bb9\u6027<\/td>\n<\/tr>\n<tr>\n<td>Outline<\/td>\n<td>\u5f00\u6e90\u77e5\u8bc6\u5e93<\/td>\n<td>\u6280\u672f\u56e2\u961f\u3001\u81ea\u6258\u7ba1\u9700\u6c42<\/td>\n<td>AI\u8f85\u52a9\u5199\u4f5c\u3001Markdown\u652f\u6301\u3001\u81ea\u90e8\u7f72<\/td>\n<td>\u786e\u8ba4\u56e2\u961f\u662f\u5426\u6709\u8fd0\u7ef4\u80fd\u529b<\/td>\n<\/tr>\n<tr>\n<td>Bloomfire<\/td>\n<td>\u77e5\u8bc6\u53d1\u73b0\u4e0e\u5206\u4eab<\/td>\n<td>\u77e5\u8bc6\u5bc6\u96c6\u578b\u56e2\u961f<\/td>\n<td>AI\u5185\u5bb9\u5206\u7c7b\u3001\u6743\u9650\u7ba1\u7406\u3001\u5206\u6790\u62a5\u8868<\/td>\n<td>\u786e\u8ba4\u662f\u5426\u652f\u6301\u4ee3\u7801\u4ed3\u5e93\u96c6\u6210<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"%E9%80%89%E5%9E%8B%E6%96%B9%E6%B3%95%E4%B8%8E%E6%A0%B8%E5%BF%83%E6%B5%8B%E8%AF%84%E7%BB%B4%E5%BA%A6%EF%BC%9A%E5%A6%82%E4%BD%95%E8%AF%84%E4%BC%B0AI%E7%A0%94%E5%8F%91%E7%9F%A5%E8%AF%86%E7%AE%A1%E7%90%86%E8%83%BD%E5%8A%9B\"><\/span>\u9009\u578b\u65b9\u6cd5\u4e0e\u6838\u5fc3\u6d4b\u8bc4\u7ef4\u5ea6\uff1a\u5982\u4f55\u8bc4\u4f30AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u80fd\u529b<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>\u9009\u578b\u4e0d\u80fd\u53ea\u770b\u529f\u80fd\u5217\u8868\uff0c\u8981\u56f4\u7ed5\u7814\u53d1\u56e2\u961f\u7684\u5b9e\u9645\u5de5\u4f5c\u6d41\u6765\u8bc4\u4f30\u3002\u6211\u4eec\u5efa\u8bae\u4ece\u4e94\u4e2a\u7ef4\u5ea6\u5165\u624b\uff1a<\/p>\n<ul>\n<li><strong>AI\u77e5\u8bc6\u5e93\u6784\u5efa\u4e0e\u667a\u80fd\u68c0\u7d22<\/strong>\uff1a\u5de5\u5177\u80fd\u5426\u81ea\u52a8\u4ece\u6587\u6863\u3001\u4ee3\u7801\u6ce8\u91ca\u3001API\u6587\u6863\u4e2d\u63d0\u53d6\u5173\u952e\u4fe1\u606f\uff0c\u5e76\u652f\u6301\u81ea\u7136\u8bed\u8a00\u641c\u7d22\u3002ONES\u5728\u8fd9\u9879\u4e0a\u80fd\u8986\u76d6\u4ece\u4ee3\u7801\u5230\u6587\u6863\u7684\u5168\u94fe\u8def\u7d22\u5f15\u3002<\/li>\n<li><strong>\u7814\u53d1\u6587\u6863\u4e0e\u4ee3\u7801\u77e5\u8bc6\u5173\u8054<\/strong>\uff1a\u6587\u6863\u80fd\u5426\u76f4\u63a5\u94fe\u63a5\u5230\u4ee3\u7801\u884c\u3001Pull Request\u6216Issue\uff0c\u5b9e\u73b0\u53cc\u5411\u8ffd\u6eaf\u3002ONES\u7684\u5173\u8054\u80fd\u529b\u6700\u76f4\u63a5\uff0c\u5176\u4ed6\u5de5\u5177\u591a\u4f9d\u8d56\u624b\u52a8\u6807\u7b7e\u6216\u63d2\u4ef6\u3002<\/li>\n<li><strong>AI\u8f85\u52a9\u5185\u5bb9\u751f\u6210\u4e0e\u6458\u8981<\/strong>\uff1a\u5de5\u5177\u80fd\u5426\u6839\u636e\u4ee3\u7801\u53d8\u66f4\u81ea\u52a8\u751f\u6210\u66f4\u65b0\u65e5\u5fd7\u3001\u6587\u6863\u6458\u8981\u6216\u6280\u672f\u8bf4\u660e\u3002ONES\u548cGuru\u7684AI\u6458\u8981\u8d28\u91cf\u8f83\u9ad8\uff0cSlab\u7684\u6458\u8981\u66f4\u7b80\u6d01\u3002<\/li>\n<li><strong>\u56e2\u961f\u534f\u4f5c\u4e0e\u6743\u9650\u7ba1\u63a7<\/strong>\uff1a\u662f\u5426\u652f\u6301\u57fa\u4e8e\u89d2\u8272\u3001\u9879\u76ee\u3001\u6587\u6863\u7ea7\u522b\u7684\u6743\u9650\u8bbe\u7f6e\uff0c\u4ee5\u53ca\u534f\u4f5c\u7f16\u8f91\u65f6\u7684\u51b2\u7a81\u5904\u7406\u3002ONES\u548cBloomfire\u7684\u6743\u9650\u7c92\u5ea6\u6700\u7ec6\u3002<\/li>\n<li><strong>\u77e5\u8bc6\u6c89\u6dc0\u4e0e\u7248\u672c\u7ba1\u7406<\/strong>\uff1a\u5de5\u5177\u80fd\u5426\u81ea\u52a8\u4fdd\u5b58\u6587\u6863\u5386\u53f2\u7248\u672c\uff0c\u5e76\u652f\u6301\u5bf9\u6bd4\u548c\u56de\u6eda\u3002ONES\u548cConfluence\u7684\u7248\u672c\u7ba1\u7406\u6700\u5b8c\u5584\u3002<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"2026%E5%B9%B4AI%E7%A0%94%E5%8F%91%E7%9F%A5%E8%AF%86%E7%AE%A1%E7%90%86%E5%B7%A5%E5%85%B7%E6%B7%B1%E5%BA%A6%E6%B5%8B%E8%AF%84%EF%BC%9A%E6%A0%B8%E5%BF%83%E8%83%BD%E5%8A%9B%E9%80%90%E9%A1%B9%E5%AF%B9%E6%AF%94\"><\/span>2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u6df1\u5ea6\u6d4b\u8bc4\uff1a\u6838\u5fc3\u80fd\u529b\u9010\u9879\u5bf9\u6bd4<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"ONES\"><\/span><a href=\"https:\/\/ones.cn\/\" target=\"_blank\" rel=\"noopener\">ONES<\/a><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>ONES \u9002\u5408\u5df2\u5177\u5907\u4e00\u5b9a\u7814\u53d1\u7ba1\u7406\u57fa\u7840\u3001\u6b63\u5728\u4ece\u201c\u6587\u6863\u5b58\u50a8\u201d\u5411\u201c\u77e5\u8bc6\u9a71\u52a8\u7814\u53d1\u201d\u8f6c\u578b\u7684\u4e2d\u5927\u578b\u56e2\u961f\uff0c\u5c24\u5176\u662f\u90a3\u4e9b\u5e0c\u671b\u5c06\u9879\u76ee\u7ba1\u7406\u3001\u4ee3\u7801\u4ed3\u5e93\u4e0e\u77e5\u8bc6\u5e93\u6253\u901a\u7684\u7814\u53d1\u7ec4\u7ec7\u3002\u5728 AI \u77e5\u8bc6\u5e93\u6784\u5efa\u4e0e\u667a\u80fd\u68c0\u7d22\u65b9\u9762\uff0cONES \u652f\u6301\u57fa\u4e8e\u9879\u76ee\u4e0a\u4e0b\u6587\u81ea\u52a8\u751f\u6210\u77e5\u8bc6\u56fe\u8c31\uff0c\u5e76\u53ef\u901a\u8fc7\u81ea\u7136\u8bed\u8a00\u68c0\u7d22\u5feb\u901f\u5b9a\u4f4d\u5230\u5173\u8054\u7684\u9700\u6c42\u3001\u7f3a\u9677\u6216\u8fed\u4ee3\u8bb0\u5f55\uff0c\u68c0\u7d22\u7ed3\u679c\u4f1a\u6309\u76f8\u5173\u5ea6\u4e0e\u65f6\u95f4\u7ef4\u5ea6\u6392\u5e8f\uff0c\u51cf\u5c11\u4fe1\u606f\u8fc7\u8f7d\u3002\u7814\u53d1\u6587\u6863\u4e0e\u4ee3\u7801\u77e5\u8bc6\u5173\u8054\u662f\u5176\u6838\u5fc3\u9002\u914d\u70b9\uff1aONES \u80fd\u591f\u5c06 Wiki \u9875\u9762\u4e0e\u4ee3\u7801\u4ed3\u5e93\u4e2d\u7684\u63d0\u4ea4\u8bb0\u5f55\u3001\u5206\u652f\u3001\u5408\u5e76\u8bf7\u6c42\u8fdb\u884c\u53cc\u5411\u94fe\u63a5\uff0c\u5728\u6d4f\u89c8\u6587\u6863\u65f6\u53ef\u76f4\u63a5\u67e5\u770b\u5173\u8054\u7684\u4ee3\u7801\u53d8\u66f4\uff0c\u5b9e\u73b0\u201c\u9700\u6c42\u2192\u8bbe\u8ba1\u2192\u4ee3\u7801\u2192\u6d4b\u8bd5\u201d\u7684\u5168\u94fe\u8def\u8ffd\u6eaf\u3002<\/p>\n<p>\u5728 AI \u8f85\u52a9\u5185\u5bb9\u751f\u6210\u4e0e\u6458\u8981\u4e0a\uff0cONES \u63d0\u4f9b\u57fa\u4e8e\u9879\u76ee\u5386\u53f2\u6570\u636e\u7684\u81ea\u52a8\u5468\u62a5\u751f\u6210\u3001\u4f1a\u8bae\u7eaa\u8981\u6458\u8981\u4ee5\u53ca\u6587\u6863\u5173\u952e\u4fe1\u606f\u63d0\u53d6\uff0c\u9002\u5408\u9700\u8981\u51cf\u5c11\u91cd\u590d\u6027\u64b0\u5199\u5de5\u4f5c\u7684\u56e2\u961f\u3002\u56e2\u961f\u534f\u4f5c\u4e0e\u6743\u9650\u7ba1\u63a7\u65b9\u9762\uff0cONES \u652f\u6301\u57fa\u4e8e\u9879\u76ee\u89d2\u8272\uff08\u5982\u7ba1\u7406\u5458\u3001\u5f00\u53d1\u8005\u3001\u6d4b\u8bd5\u8005\uff09\u7684\u7ec6\u7c92\u5ea6\u6743\u9650\u8bbe\u7f6e\uff0c\u5e76\u53ef\u5bf9\u77e5\u8bc6\u5e93\u7a7a\u95f4\u8fdb\u884c\u72ec\u7acb\u6743\u9650\u9694\u79bb\uff0c\u540c\u65f6\u63d0\u4f9b\u8de8\u9879\u76ee\u7684\u53ea\u8bfb\u5171\u4eab\u94fe\u63a5\uff0c\u517c\u987e\u5b89\u5168\u4e0e\u534f\u4f5c\u6548\u7387\u3002\u77e5\u8bc6\u6c89\u6dc0\u4e0e\u7248\u672c\u7ba1\u7406\u4e0a\uff0cONES \u7684 Wiki \u6a21\u5757\u5185\u7f6e\u4e86\u7248\u672c\u5bf9\u6bd4\u4e0e\u56de\u6eda\u529f\u80fd\uff0c\u6bcf\u6b21\u7f16\u8f91\u90fd\u4f1a\u81ea\u52a8\u751f\u6210\u5feb\u7167\uff0c\u5e76\u652f\u6301\u8bbe\u7f6e\u201c\u77e5\u8bc6\u6c89\u6dc0\u5468\u671f\u201d\u63d0\u9192\uff0c\u5f15\u5bfc\u56e2\u961f\u5b9a\u671f\u5f52\u6863\u5df2\u5173\u95ed\u8fed\u4ee3\u4e2d\u7684\u5173\u952e\u6587\u6863\u3002<\/p>\n<p>\u4f7f\u7528\u524d\u5efa\u8bae\u786e\u8ba4\u56e2\u961f\u662f\u5426\u5df2\u5efa\u7acb\u76f8\u5bf9\u7a33\u5b9a\u7684\u7814\u53d1\u6d41\u7a0b\uff08\u5982 Scrum \u6216 Kanban\uff09\uff0c\u56e0\u4e3a ONES \u7684\u77e5\u8bc6\u5173\u8054\u80fd\u529b\u9ad8\u5ea6\u4f9d\u8d56\u9879\u76ee\u4e0e\u8fed\u4ee3\u7684\u7ed3\u6784\u5316\u6570\u636e\u3002\u5efa\u8bae\u914d\u5957\u5efa\u7acb\u201c\u6587\u6863\u4e0e\u4ee3\u7801\u5173\u8054\u89c4\u8303\u201d\uff0c\u4f8b\u5982\u8981\u6c42\u5f00\u53d1\u8005\u5728\u63d0\u4ea4\u4ee3\u7801\u65f6\u586b\u5199\u5173\u8054\u7684 Wiki \u9875\u9762 ID\uff0c\u4ee5\u6700\u5927\u5316\u77e5\u8bc6\u8ffd\u6eaf\u6548\u679c\u3002\u5bf9\u4e8e\u77e5\u8bc6\u5e93\u521d\u59cb\u6784\u5efa\uff0c\u5efa\u8bae\u5148\u7531\u6280\u672f\u8d1f\u8d23\u4eba\u68b3\u7406\u51fa\u6838\u5fc3\u6a21\u5757\u7684\u77e5\u8bc6\u6846\u67b6\uff0c\u518d\u9010\u6b65\u5f00\u653e\u7ed9\u5168\u5458\u7f16\u8f91\uff0c\u907f\u514d\u65e9\u671f\u5185\u5bb9\u788e\u7247\u5316\u3002ONES \u66f4\u9002\u5408\u7814\u53d1\u6210\u719f\u5ea6\u8f83\u9ad8\u3001\u5bf9\u6d41\u7a0b\u5408\u89c4\u6027\u6709\u660e\u786e\u8981\u6c42\u7684\u56e2\u961f\uff0c\u82e5\u56e2\u961f\u5c1a\u5904\u4e8e\u77e5\u8bc6\u7ba1\u7406\u8d77\u6b65\u9636\u6bb5\uff0c\u53ef\u80fd\u9700\u8981\u5148\u6295\u5165\u8d44\u6e90\u5b8c\u6210\u57fa\u7840\u6570\u636e\u6cbb\u7406\u3002<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/04f5ddf81ca3_ONES-\u4ea7\u54c1\u5168\u666f\u56fe.png\" alt=\"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350+ONES \u4ea7\u54c1\u5168\u666f\u56fe\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Tower\"><\/span>Tower<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Tower \u66f4\u9002\u5408\u4ee5\u4efb\u52a1\u9a71\u52a8\u3001\u5f3a\u8c03\u7814\u53d1\u6d41\u7a0b\u95ed\u73af\u7684\u4e2d\u5c0f\u578b\u56e2\u961f\uff0c\u5c24\u5176\u662f\u90a3\u4e9b\u5df2\u7ecf\u4e60\u60ef\u770b\u677f\u4e0e\u8fed\u4ee3\u7ba1\u7406\u3001\u5e0c\u671b\u5c06\u77e5\u8bc6\u6c89\u6dc0\u81ea\u7136\u878d\u5165\u65e5\u5e38\u534f\u4f5c\u573a\u666f\u7684\u56e2\u961f\u3002\u5728 AI \u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u80fd\u529b\u4e3b\u8f74\u4e0b\uff0cTower \u7684\u9002\u914d\u70b9\u5728\u4e8e\u5176\u201c\u4efb\u52a1\u5373\u77e5\u8bc6\u8282\u70b9\u201d\u7684\u8bbe\u8ba1\u903b\u8f91\u2014\u2014\u7814\u53d1\u6587\u6863\u3001\u4ee3\u7801\u7247\u6bb5\u3001\u8ba8\u8bba\u8bb0\u5f55\u5747\u53ef\u76f4\u63a5\u6302\u8f7d\u5230\u5177\u4f53\u4efb\u52a1\u6216\u8fed\u4ee3\u770b\u677f\u4e2d\uff0c\u5f62\u6210\u4ee5\u4ea4\u4ed8\u7269\u4e3a\u951a\u70b9\u7684\u77e5\u8bc6\u5173\u8054\uff0c\u800c\u975e\u72ec\u7acb\u7684\u77e5\u8bc6\u5e93\u7ed3\u6784\u3002\u8fd9\u610f\u5473\u7740\u56e2\u961f\u65e0\u9700\u989d\u5916\u5207\u6362\u5de5\u5177\u5373\u53ef\u5b8c\u6210\u77e5\u8bc6\u6c89\u6dc0\uff0c\u4f46\u524d\u63d0\u662f\u56e2\u961f\u5df2\u5efa\u7acb\u201c\u4efb\u52a1\u5b8c\u6210\u540e\u5fc5\u987b\u5f52\u6863\u5173\u8054\u6587\u6863\u201d\u7684\u534f\u4f5c\u4e60\u60ef\u3002<\/p>\n<p>\u5728 AI \u77e5\u8bc6\u5e93\u6784\u5efa\u4e0e\u667a\u80fd\u68c0\u7d22\u7ef4\u5ea6\uff0cTower \u76ee\u524d\u63d0\u4f9b\u7684\u662f\u57fa\u4e8e\u4efb\u52a1\u6807\u9898\u3001\u63cf\u8ff0\u53ca\u9644\u4ef6\u5185\u5bb9\u7684\u5168\u6587\u68c0\u7d22\uff0c\u5c1a\u672a\u5f15\u5165\u8bed\u4e49\u7406\u89e3\u6216\u5411\u91cf\u5316\u68c0\u7d22\u80fd\u529b\uff0c\u56e0\u6b64\u66f4\u9002\u5408\u77e5\u8bc6\u4f53\u91cf\u4e0d\u5927\u3001\u68c0\u7d22\u9700\u6c42\u4ee5\u5173\u952e\u8bcd\u5339\u914d\u4e3a\u4e3b\u7684\u573a\u666f\u3002\u4f7f\u7528\u524d\u5efa\u8bae\u786e\u8ba4\uff1a\u56e2\u961f\u662f\u5426\u63a5\u53d7\u201c\u77e5\u8bc6\u4f9d\u9644\u4e8e\u4efb\u52a1\u6d41\u201d\u800c\u975e\u72ec\u7acb\u77e5\u8bc6\u5e93\u7684\u5f62\u6001\uff1f\u82e5\u9700\u8981\u8de8\u9879\u76ee\u3001\u8de8\u8fed\u4ee3\u7684\u667a\u80fd\u95ee\u7b54\u6216\u4ee3\u7801\u77e5\u8bc6\u56fe\u8c31\uff0c\u5219\u9700\u914d\u5957\u5176\u4ed6\u4e13\u9879\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u3002\u5efa\u8bae\u914d\u5957\u7684\u7ba1\u7406\u52a8\u4f5c\u5305\u62ec\uff1a\u5728\u9879\u76ee\u6a21\u677f\u4e2d\u9884\u8bbe\u201c\u77e5\u8bc6\u6c89\u6dc0\u201d\u4efb\u52a1\u7c7b\u578b\uff0c\u5e76\u5f3a\u5236\u8981\u6c42\u6bcf\u4e2a\u8fed\u4ee3\u7ed3\u675f\u540e\u7531\u6280\u672f\u8d1f\u8d23\u4eba\u5ba1\u6838\u6587\u6863\u4e0e\u4ee3\u7801\u7684\u5173\u8054\u5b8c\u6574\u6027\u3002<\/p>\n<p>\u5728\u56e2\u961f\u534f\u4f5c\u4e0e\u6743\u9650\u7ba1\u63a7\u65b9\u9762\uff0cTower \u652f\u6301\u57fa\u4e8e\u9879\u76ee\u3001\u4efb\u52a1\u548c\u6210\u5458\u7684\u7ec6\u7c92\u5ea6\u6743\u9650\u8bbe\u7f6e\uff0c\u53ef\u6ee1\u8db3\u7814\u53d1\u56e2\u961f\u5bf9\u654f\u611f\u4ee3\u7801\u6587\u6863\u7684\u8bbf\u95ee\u63a7\u5236\u9700\u6c42\u3002\u4f46\u9700\u6ce8\u610f\uff0c\u5176\u6743\u9650\u6a21\u578b\u66f4\u504f\u5411\u9879\u76ee\u7ea7\u9694\u79bb\uff0c\u82e5\u9700\u8981\u8de8\u9879\u76ee\u5171\u4eab\u77e5\u8bc6\u5e93\u6216\u8bbe\u7f6e\u77e5\u8bc6\u8d21\u732e\u8005\u4e0e\u6d88\u8d39\u8005\u7684\u5206\u5c42\u6743\u9650\uff0c\u5efa\u8bae\u5728\u9009\u578b\u65f6\u989d\u5916\u8bc4\u4f30\u662f\u5426\u9700\u914d\u5408\u4f01\u4e1a\u7ea7\u76ee\u5f55\u670d\u52a1\uff08\u5982 LDAP\uff09\u8fdb\u884c\u7edf\u4e00\u7ba1\u7406\u3002\u603b\u4f53\u800c\u8a00\uff0cTower \u9002\u5408\u5c06\u77e5\u8bc6\u7ba1\u7406\u89c6\u4e3a\u201c\u534f\u4f5c\u526f\u4ea7\u54c1\u201d\u7684\u56e2\u961f\uff0c\u800c\u975e\u4ee5\u77e5\u8bc6\u5e93\u4e3a\u6838\u5fc3\u8d44\u4ea7\u7684\u7ec4\u7ec7\u3002<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/966458e0716a_Tower-\u4ea7\u54c1\u56fe-scaled-1.png\" alt=\"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350+Tower \u4ea7\u54c1\u56fe\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Notion\"><\/span>Notion<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Notion \u9002\u5408\u5bf9\u6587\u6863\u7ed3\u6784\u5316\u8981\u6c42\u8f83\u9ad8\u3001\u56e2\u961f\u89c4\u6a21\u5728 20\uff5e100 \u4eba\u3001\u4e14\u5df2\u5177\u5907\u4e00\u5b9a AI \u5de5\u5177\u4f7f\u7528\u4e60\u60ef\u7684\u7814\u53d1\u56e2\u961f\uff0c\u5c24\u5176\u662f\u90a3\u4e9b\u5e0c\u671b\u5c06\u77e5\u8bc6\u5e93\u4e0e\u9879\u76ee\u4efb\u52a1\u3001\u4ea7\u54c1\u6587\u6863\u8fdb\u884c\u7edf\u4e00\u7ba1\u7406\u7684\u56e2\u961f\u3002\u5728 AI \u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u573a\u666f\u4e0b\uff0cNotion \u7684 AI \u529f\u80fd\uff08\u5982\u667a\u80fd\u95ee\u7b54\u3001\u6587\u6863\u6458\u8981\u3001\u5185\u5bb9\u751f\u6210\uff09\u80fd\u591f\u76f4\u63a5\u5d4c\u5165\u5230\u9875\u9762\u7f16\u8f91\u4e0e\u68c0\u7d22\u6d41\u7a0b\u4e2d\uff0c\u5e2e\u52a9\u7814\u53d1\u4eba\u5458\u5feb\u901f\u4ece\u77e5\u8bc6\u5e93\u4e2d\u63d0\u53d6\u5173\u952e\u4fe1\u606f\uff0c\u51cf\u5c11\u91cd\u590d\u67e5\u8be2\u65f6\u95f4\u3002\u5176\u6570\u636e\u5e93\u4e0e\u9875\u9762\u5173\u8054\u80fd\u529b\uff0c\u4f7f\u5f97\u7814\u53d1\u6587\u6863\u3001API \u8bf4\u660e\u3001\u6280\u672f\u65b9\u6848\u53ef\u4ee5\u4e0e\u9879\u76ee\u4efb\u52a1\u3001\u8fed\u4ee3\u8bb0\u5f55\u5f62\u6210\u7f51\u72b6\u94fe\u63a5\uff0c\u4fbf\u4e8e\u8ffd\u6eaf\u4e0a\u4e0b\u6587\u3002<\/p>\n<p>\u4f7f\u7528\u524d\u5efa\u8bae\u786e\u8ba4\u56e2\u961f\u662f\u5426\u5df2\u5efa\u7acb\u6e05\u6670\u7684\u6587\u6863\u5206\u7c7b\u4e0e\u6807\u7b7e\u4f53\u7cfb\uff0c\u56e0\u4e3a Notion \u7684 AI \u68c0\u7d22\u6548\u679c\u9ad8\u5ea6\u4f9d\u8d56\u9875\u9762\u7ed3\u6784\u7684\u89c4\u8303\u6027\u3002\u5982\u679c\u56e2\u961f\u5f53\u524d\u6587\u6863\u6563\u4e71\u3001\u7f3a\u4e4f\u5143\u6570\u636e\u7ba1\u7406\uff0cAI \u7684\u667a\u80fd\u68c0\u7d22\u53ef\u80fd\u65e0\u6cd5\u8fbe\u5230\u9884\u671f\u7cbe\u5ea6\u3002\u5efa\u8bae\u914d\u5957\u5efa\u7acb\u201c\u6587\u6863\u6a21\u677f + \u6807\u7b7e\u89c4\u8303 + \u5b9a\u671f\u5f52\u6863\u201d\u673a\u5236\uff0c\u4f8b\u5982\u4e3a\u6280\u672f\u65b9\u6848\u3001\u63a5\u53e3\u6587\u6863\u3001\u6545\u969c\u590d\u76d8\u5206\u522b\u8bbe\u5b9a\u56fa\u5b9a\u6a21\u677f\uff0c\u5e76\u5f3a\u5236\u8981\u6c42\u586b\u5199\u5173\u8054\u9879\u76ee\u6216\u6a21\u5757\u6807\u7b7e\uff0c\u4ece\u800c\u63d0\u5347 AI \u5bf9\u77e5\u8bc6\u5e93\u7684\u7406\u89e3\u8d28\u91cf\u3002\u6b64\u5916\uff0cNotion \u7684\u6743\u9650\u7ba1\u63a7\u4ee5\u9875\u9762\u7ea7\u5171\u4eab\u4e3a\u4e3b\uff0c\u66f4\u9002\u5408\u6241\u5e73\u5316\u534f\u4f5c\u573a\u666f\uff0c\u82e5\u56e2\u961f\u6709\u4e25\u683c\u7684\u90e8\u95e8\u7ea7\u6570\u636e\u9694\u79bb\u9700\u6c42\uff0c\u4f7f\u7528\u524d\u9700\u786e\u8ba4\u6743\u9650\u6a21\u578b\u662f\u5426\u6ee1\u8db3\u3002<\/p>\n<p>\u5728\u77e5\u8bc6\u6c89\u6dc0\u4e0e\u7248\u672c\u7ba1\u7406\u65b9\u9762\uff0cNotion \u63d0\u4f9b\u4e86\u9875\u9762\u5386\u53f2\u7248\u672c\u56de\u6eaf\u529f\u80fd\uff0c\u4f46\u7f3a\u4e4f\u7c7b\u4f3c\u4ee3\u7801\u4ed3\u5e93\u7684 diff \u5bf9\u6bd4\u80fd\u529b\uff0c\u66f4\u9002\u5408\u6587\u6863\u8fed\u4ee3\u9891\u7387\u9002\u4e2d\u3001\u4ee5\u5185\u5bb9\u5ba1\u9605\u4e3a\u4e3b\u7684\u56e2\u961f\u3002\u5bf9\u4e8e\u9700\u8981\u5c06\u4ee3\u7801\u7247\u6bb5\u4e0e\u6587\u6863\u6df1\u5ea6\u5173\u8054\u7684\u573a\u666f\uff08\u5982\u81ea\u52a8\u540c\u6b65\u4ee3\u7801\u6ce8\u91ca\u6216 API \u53d8\u66f4\uff09\uff0c\u5efa\u8bae\u914d\u5957\u4f7f\u7528\u5916\u90e8\u5de5\u5177\uff08\u5982 Git \u94a9\u5b50\u6216\u81ea\u52a8\u5316\u811a\u672c\uff09\u6765\u8865\u5145\u5173\u8054\u80fd\u529b\u3002\u603b\u4f53\u800c\u8a00\uff0cNotion \u662f AI \u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u4e2d\u7684\u201c\u7ed3\u6784\u5316\u5185\u5bb9\u4e2d\u67a2\u201d\uff0c\u9002\u5408\u90a3\u4e9b\u613f\u610f\u6295\u5165\u524d\u671f\u89c4\u8303\u5efa\u8bbe\u3001\u8ffd\u6c42\u6587\u6863\u4e0e\u4efb\u52a1\u534f\u540c\u7684\u56e2\u961f\u3002<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/e7ba8e82b3b8_Notion-\u4ea7\u54c1\u56fe.png\" alt=\"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350+Notion \u4ea7\u54c1\u56fe\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Confluence\"><\/span>Confluence<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Confluence \u66f4\u9002\u5408\u7814\u53d1\u56e2\u961f\u89c4\u6a21\u5728 50 \u4eba\u4ee5\u4e0a\u3001\u5df2\u6709\u6210\u719f\u9879\u76ee\u7ba1\u7406\u6d41\u7a0b\u4e14\u9700\u8981\u5c06\u77e5\u8bc6\u5e93\u4e0e Jira \u7b49\u5f00\u53d1\u5de5\u5177\u6df1\u5ea6\u7ed1\u5b9a\u7684\u7ec4\u7ec7\u3002\u5728 AI \u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u573a\u666f\u4e0b\uff0c\u5176\u6838\u5fc3\u9002\u914d\u70b9\u5728\u4e8e\uff1a\u901a\u8fc7 Atlassian Intelligence \u5b9e\u73b0\u57fa\u4e8e\u9879\u76ee\u4e0a\u4e0b\u6587\u7684\u667a\u80fd\u68c0\u7d22\u4e0e\u6458\u8981\u751f\u6210\uff0c\u80fd\u591f\u5c06 Jira \u4e2d\u7684\u4efb\u52a1\u3001\u4ee3\u7801\u63d0\u4ea4\u8bb0\u5f55\u3001PR \u8bc4\u5ba1\u5185\u5bb9\u81ea\u52a8\u5173\u8054\u81f3\u5bf9\u5e94\u6587\u6863\u9875\u9762\uff0c\u5f62\u6210\u4ece\u9700\u6c42\u5230\u4ee3\u7801\u5230\u77e5\u8bc6\u6c89\u6dc0\u7684\u95ed\u73af\u3002\u5bf9\u4e8e\u7814\u53d1\u6587\u6863\u4e0e\u4ee3\u7801\u77e5\u8bc6\u7684\u5173\u8054\uff0cConfluence \u652f\u6301\u5d4c\u5165 Bitbucket \u4ee3\u7801\u7247\u6bb5\u3001\u81ea\u52a8\u751f\u6210\u53d1\u5e03\u8bf4\u660e\uff0c\u5e76\u53ef\u901a\u8fc7\u767d\u677f\u529f\u80fd\u53ef\u89c6\u5316\u67b6\u6784\u51b3\u7b56\u8bb0\u5f55\uff0c\u8fd9\u662f\u5176\u4ed6\u5de5\u5177\u8f83\u96be\u590d\u5236\u7684\u6df1\u5ea6\u96c6\u6210\u80fd\u529b\u3002<\/p>\n<p>\u4f7f\u7528\u524d\u5efa\u8bae\u786e\u8ba4\uff1a\u56e2\u961f\u662f\u5426\u5df2\u91c7\u7528 Atlassian \u751f\u6001\uff08\u5c24\u5176\u662f Jira\uff09\uff0c\u56e0\u4e3a Confluence \u7684 AI \u77e5\u8bc6\u5e93\u6784\u5efa\u4f18\u52bf\u9ad8\u5ea6\u4f9d\u8d56\u8de8\u5de5\u5177\u6570\u636e\u6253\u901a\uff1b\u82e5\u4ec5\u4f5c\u4e3a\u72ec\u7acb\u77e5\u8bc6\u5e93\u4f7f\u7528\uff0c\u5176\u667a\u80fd\u68c0\u7d22\u7684\u4e0a\u4e0b\u6587\u4e30\u5bcc\u5ea6\u4f1a\u660e\u663e\u4e0b\u964d\u3002\u9009\u578b\u65f6\u9700\u91cd\u70b9\u8bc4\u4f30\uff1aAI \u5185\u5bb9\u751f\u6210\u4e0e\u6458\u8981\u529f\u80fd\u5728\u4e2d\u6587\u573a\u666f\u4e0b\u7684\u51c6\u786e\u7387\u662f\u5426\u6ee1\u8db3\u56e2\u961f\u9884\u671f\uff0c\u4ee5\u53ca\u9875\u9762\u7ea7\u6743\u9650\u7ba1\u63a7\u662f\u5426\u80fd\u8986\u76d6\u7814\u53d1\u90e8\u95e8\u5bf9\u654f\u611f\u4ee3\u7801\u6587\u6863\u7684\u9694\u79bb\u9700\u6c42\u3002\u5efa\u8bae\u914d\u5957\u7ba1\u7406\u52a8\u4f5c\u5305\u62ec\uff1a\u5efa\u7acb\u6587\u6863\u6a21\u677f\u89c4\u8303\uff08\u5982 ADR\u3001API \u8bbe\u8ba1\u6587\u6863\u6a21\u677f\uff09\uff0c\u5e76\u8bbe\u7f6e\u5b9a\u671f\u7684\u77e5\u8bc6\u5e93\u5065\u5eb7\u5ea6\u68c0\u67e5\uff0c\u5229\u7528 AI \u81ea\u52a8\u6807\u8bb0\u8fc7\u671f\u9875\u9762\uff0c\u907f\u514d\u4fe1\u606f\u5197\u4f59\u3002<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/e058c1ee7de2_Confluence-\u4ea7\u54c1\u56fe.png\" alt=\"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350+Confluence \u4ea7\u54c1\u56fe\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Slab\"><\/span>Slab<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Slab \u66f4\u9002\u5408\u5df2\u7ecf\u5177\u5907\u4e00\u5b9a\u7814\u53d1\u6d41\u7a0b\u89c4\u8303\u3001\u4e14\u56e2\u961f\u89c4\u6a21\u5728 20\uff5e100 \u4eba\u4e4b\u95f4\u7684\u4e2d\u578b\u6280\u672f\u56e2\u961f\uff0c\u5c24\u5176\u662f\u90a3\u4e9b\u5e0c\u671b\u7528\u201c\u6587\u6863\u5373\u77e5\u8bc6\u5e93\u201d\u7406\u5ff5\u66ff\u4ee3\u4f20\u7edf Wiki \u7684\u56e2\u961f\u3002\u5728 AI \u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u80fd\u529b\u4e3b\u8f74\u4e0b\uff0cSlab \u7684\u9002\u914d\u70b9\u4e3b\u8981\u4f53\u73b0\u5728 AI \u8f85\u52a9\u5185\u5bb9\u751f\u6210\u4e0e\u6458\u8981\u3001\u4ee5\u53ca\u77e5\u8bc6\u6c89\u6dc0\u4e0e\u7248\u672c\u7ba1\u7406\u4e24\u4e2a\u7ef4\u5ea6\u3002\u5176\u5185\u7f6e\u7684 AI \u52a9\u624b\u80fd\u591f\u57fa\u4e8e\u5df2\u6709\u6587\u6863\u81ea\u52a8\u751f\u6210\u6458\u8981\u3001\u63d0\u70bc\u5173\u952e\u7ed3\u8bba\uff0c\u5e76\u652f\u6301\u5728\u7f16\u8f91\u5668\u5185\u76f4\u63a5\u8c03\u7528 AI \u8fdb\u884c\u5185\u5bb9\u6269\u5199\u6216\u6539\u5199\uff0c\u8fd9\u5bf9\u4e8e\u9700\u8981\u5feb\u901f\u4ea7\u51fa\u6280\u672f\u65b9\u6848\u3001API \u8bf4\u660e\u6216\u590d\u76d8\u6587\u6863\u7684\u7814\u53d1\u56e2\u961f\u6765\u8bf4\uff0c\u80fd\u663e\u8457\u964d\u4f4e\u5199\u4f5c\u95e8\u69db\u3002\u540c\u65f6\uff0cSlab \u7684\u7248\u672c\u5386\u53f2\u8bb0\u5f55\u6e05\u6670\uff0c\u652f\u6301\u6587\u6863\u7ea7\u56de\u6eda\uff0c\u914d\u5408\u5176\u201c\u5e16\u5b50\u201d\u5f0f\u7684\u7ed3\u6784\u5316\u7ec4\u7ec7\u65b9\u5f0f\uff0c\u6709\u52a9\u4e8e\u56e2\u961f\u5f62\u6210\u6301\u7eed\u6c89\u6dc0\u7684\u4e60\u60ef\u3002<\/p>\n<p>\u4f7f\u7528\u524d\u5efa\u8bae\u786e\u8ba4\u56e2\u961f\u662f\u5426\u63a5\u53d7\u201c\u4ee5 Markdown \u4e3a\u6838\u5fc3\u7f16\u8f91\u8bed\u8a00\u201d\u7684\u5de5\u4f5c\u6d41\uff0c\u56e0\u4e3a Slab \u7684\u7f16\u8f91\u5668\u5bf9\u5bcc\u6587\u672c\u548c\u590d\u6742\u8868\u683c\u7684\u652f\u6301\u76f8\u5bf9\u6709\u9650\uff0c\u66f4\u9002\u5408\u4ee5\u4ee3\u7801\u7247\u6bb5\u3001\u6d41\u7a0b\u56fe\u5d4c\u5165\u548c\u7eaf\u6587\u672c\u4e3a\u4e3b\u7684\u7814\u53d1\u6587\u6863\u573a\u666f\u3002\u9009\u578b\u786e\u8ba4\u70b9\u5305\u62ec\uff1a\u56e2\u961f\u662f\u5426\u5df2\u6709 Git \u4ed3\u5e93\u4e0e CI\/CD \u6d41\u7a0b\uff0cSlab \u867d\u652f\u6301\u901a\u8fc7 API \u4e0e GitHub\u3001GitLab \u7b49\u5de5\u5177\u8fdb\u884c\u57fa\u7840\u94fe\u63a5\uff0c\u4f46\u5e76\u672a\u63d0\u4f9b\u6df1\u5ea6\u7684\u4ee3\u7801\u4e0e\u6587\u6863\u53cc\u5411\u5173\u8054\u80fd\u529b\uff0c\u56e0\u6b64\u66f4\u9002\u5408\u5c06\u77e5\u8bc6\u5e93\u4f5c\u4e3a\u72ec\u7acb\u6c89\u6dc0\u5c42\uff0c\u800c\u975e\u4ee3\u7801\u6ce8\u91ca\u7684\u5ef6\u4f38\u3002\u5efa\u8bae\u914d\u5957\u7ba1\u7406\u52a8\u4f5c\u5305\u62ec\uff1a\u8bbe\u7acb\u6587\u6863\u6a21\u677f\u89c4\u8303\uff08\u5982\u6280\u672f\u8bbe\u8ba1\u6587\u6863\u3001\u4e8b\u6545\u590d\u76d8\u6a21\u677f\uff09\uff0c\u5e76\u6307\u5b9a\u4e13\u4eba\u5b9a\u671f\u6e05\u7406\u8fc7\u671f\u6587\u6863\uff0c\u4ee5\u7ef4\u6301\u77e5\u8bc6\u5e93\u7684\u6574\u6d01\u5ea6\u4e0e\u68c0\u7d22\u6548\u7387\u3002<\/p>\n<p>\u5728\u56e2\u961f\u534f\u4f5c\u4e0e\u6743\u9650\u7ba1\u63a7\u65b9\u9762\uff0cSlab \u63d0\u4f9b\u4e86\u57fa\u4e8e\u56e2\u961f\u7684\u7ec6\u7c92\u5ea6\u6743\u9650\u8bbe\u7f6e\uff0c\u652f\u6301\u516c\u5f00\u3001\u5185\u90e8\u3001\u79c1\u6709\u4e09\u7ea7\u53ef\u89c1\u6027\uff0c\u80fd\u591f\u6ee1\u8db3\u7814\u53d1\u56e2\u961f\u5bf9\u654f\u611f\u6280\u672f\u6587\u6863\u7684\u9694\u79bb\u9700\u6c42\u3002\u4f46\u5176\u6743\u9650\u6a21\u578b\u66f4\u504f\u5411\u6241\u5e73\u5316\u7ba1\u7406\uff0c\u5bf9\u4e8e\u9700\u8981\u591a\u5c42\u5ba1\u6279\u6216\u590d\u6742\u76ee\u5f55\u7ea7\u6743\u9650\u7684\u5927\u578b\u7ec4\u7ec7\uff0c\u4f7f\u7528\u524d\u5efa\u8bae\u786e\u8ba4\u662f\u5426\u63a5\u53d7\u8fd9\u79cd\u76f8\u5bf9\u7b80\u6d01\u7684\u6743\u9650\u7ed3\u6784\u3002\u603b\u4f53\u800c\u8a00\uff0cSlab \u5728 AI \u8f85\u52a9\u5199\u4f5c\u4e0e\u8f7b\u91cf\u7ea7\u77e5\u8bc6\u6c89\u6dc0\u573a\u666f\u4e0b\u8868\u73b0\u5747\u8861\uff0c\u9002\u5408\u8ffd\u6c42\u201c\u4f4e\u7ef4\u62a4\u6210\u672c\u3001\u9ad8\u5199\u4f5c\u6548\u7387\u201d\u7684\u7814\u53d1\u56e2\u961f\u4f5c\u4e3a\u6838\u5fc3\u77e5\u8bc6\u5e93\u5de5\u5177\u3002<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/9d8344ee515b_Slab-\u4ea7\u54c1\u56fe.png\" alt=\"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350+Slab \u4ea7\u54c1\u56fe\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Guru\"><\/span>Guru<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Guru \u66f4\u9002\u5408\u4ee5\u201c\u5361\u7247\u5f0f\u77e5\u8bc6\u5e93\u201d\u4e3a\u6838\u5fc3\u3001\u5f3a\u8c03\u77e5\u8bc6\u5373\u65f6\u9a8c\u8bc1\u4e0e\u56e2\u961f\u534f\u4f5c\u7684\u7814\u53d1\u56e2\u961f\uff0c\u5c24\u5176\u662f\u9700\u8981\u5c06\u77e5\u8bc6\u7ba1\u7406\u4e0e\u5de5\u4f5c\u6d41\u6df1\u5ea6\u7ed1\u5b9a\u7684\u573a\u666f\u3002\u5728 AI \u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u80fd\u529b\u4e3b\u8f74\u4e0b\uff0cGuru \u7684\u9002\u914d\u70b9\u5728\u4e8e\u5176\u201c\u53ef\u4fe1\u77e5\u8bc6\u201d\u673a\u5236\uff1a\u6bcf\u6761\u77e5\u8bc6\u5361\u7247\u5747\u53ef\u8bbe\u7f6e\u5ba1\u6838\u4eba\u4e0e\u6709\u6548\u671f\uff0c\u5230\u671f\u81ea\u52a8\u63d0\u9192\u590d\u6838\uff0c\u786e\u4fdd\u7814\u53d1\u6587\u6863\u3001API \u8bf4\u660e\u3001\u4ee3\u7801\u89c4\u8303\u7b49\u77e5\u8bc6\u59cb\u7ec8\u5904\u4e8e\u6700\u65b0\u72b6\u6001\uff0c\u907f\u514d\u56e0\u4fe1\u606f\u8fc7\u65f6\u5bfc\u81f4\u7684\u51b3\u7b56\u504f\u5dee\u3002\u540c\u65f6\uff0cGuru \u7684\u6d4f\u89c8\u5668\u63d2\u4ef6\u4e0e Slack\u3001Teams \u7b49\u534f\u4f5c\u5de5\u5177\u6df1\u5ea6\u96c6\u6210\uff0c\u652f\u6301\u5728\u7814\u53d1\u6d41\u7a0b\u4e2d\u5373\u65f6\u68c0\u7d22\u77e5\u8bc6\uff0c\u65e0\u9700\u5207\u6362\u7a97\u53e3\uff0c\u63d0\u5347\u4e86\u77e5\u8bc6\u89e6\u8fbe\u6548\u7387\u3002<\/p>\n<p>\u4f7f\u7528\u524d\u5efa\u8bae\u786e\u8ba4\u56e2\u961f\u662f\u5426\u63a5\u53d7\u201c\u5361\u7247\u5f0f\u201d\u800c\u975e\u4f20\u7edf\u6587\u6863\u6811\u7684\u77e5\u8bc6\u7ec4\u7ec7\u65b9\u5f0f\uff0c\u4ee5\u53ca\u662f\u5426\u5177\u5907\u5b9a\u671f\u5ba1\u6838\u77e5\u8bc6\u7684\u6267\u884c\u610f\u613f\u3002Guru \u7684 AI \u8f85\u52a9\u529f\u80fd\u4e3b\u8981\u56f4\u7ed5\u77e5\u8bc6\u6458\u8981\u4e0e\u5361\u7247\u5185\u5bb9\u751f\u6210\uff0c\u800c\u975e\u4ee3\u7801\u7ea7\u5173\u8054\uff0c\u56e0\u6b64\u66f4\u9002\u5408\u4ee5\u6d41\u7a0b\u89c4\u8303\u3001\u6280\u672f\u51b3\u7b56\u8bb0\u5f55\u4e3a\u6838\u5fc3\u7684\u77e5\u8bc6\u6c89\u6dc0\u573a\u666f\uff0c\u800c\u975e\u9700\u8981\u5c06\u4ee3\u7801\u7247\u6bb5\u4e0e\u6587\u6863\u81ea\u52a8\u5173\u8054\u7684\u6df1\u5ea6\u7814\u53d1\u573a\u666f\u3002\u5efa\u8bae\u914d\u5957\u5efa\u7acb\u77e5\u8bc6\u5361\u7247\u5206\u7c7b\u6807\u7b7e\u4f53\u7cfb\u4e0e\u5ba1\u6838\u4eba\u8f6e\u503c\u673a\u5236\uff0c\u4ee5\u5145\u5206\u53d1\u6325\u5176\u77e5\u8bc6\u4fdd\u9c9c\u80fd\u529b\u3002\u5bf9\u4e8e\u9700\u8981\u4e25\u683c\u7248\u672c\u7ba1\u7406\u4e0e\u4ee3\u7801\u77e5\u8bc6\u53cc\u5411\u8ffd\u6eaf\u7684\u56e2\u961f\uff0c\u5efa\u8bae\u5c06 Guru \u4f5c\u4e3a\u77e5\u8bc6\u9a8c\u8bc1\u5c42\uff0c\u4e0e\u7248\u672c\u63a7\u5236\u5de5\u5177\u914d\u5408\u4f7f\u7528\u3002<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/0842286b72c5_Guru-\u4ea7\u54c1\u56fe.png\" alt=\"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350+Guru \u4ea7\u54c1\u56fe\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Outline\"><\/span>Outline<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Outline \u9002\u5408\u5bf9\u6587\u6863\u7ba1\u7406\u6709\u5f3a\u81ea\u5efa\u9700\u6c42\u3001\u56e2\u961f\u89c4\u6a21\u5728 50 \u4eba\u4ee5\u5185\u3001\u4e14\u5e0c\u671b\u4ee5\u8f83\u4f4e\u8fd0\u7ef4\u6210\u672c\u83b7\u5f97\u79c1\u6709\u5316\u90e8\u7f72\u80fd\u529b\u7684\u7814\u53d1\u56e2\u961f\u3002\u5728 AI \u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u573a\u666f\u4e0b\uff0cOutline \u7684\u6838\u5fc3\u9002\u914d\u70b9\u5728\u4e8e\u5176\u81ea\u6258\u7ba1\u67b6\u6784\u4e0e\u5f00\u653e\u7684 API \u8bbe\u8ba1\uff0c\u56e2\u961f\u53ef\u81ea\u884c\u63a5\u5165 OpenAI \u517c\u5bb9\u63a5\u53e3\u5b9e\u73b0\u667a\u80fd\u68c0\u7d22\u4e0e\u6458\u8981\u751f\u6210\uff0c\u540c\u65f6\u901a\u8fc7 Markdown \u539f\u751f\u652f\u6301\u548c Git \u4ed3\u5e93\u8054\u52a8\uff0c\u5c06\u4ee3\u7801\u6ce8\u91ca\u3001API \u6587\u6863\u4e0e\u77e5\u8bc6\u5e93\u6761\u76ee\u76f4\u63a5\u5173\u8054\uff0c\u5f62\u6210\u7814\u53d1\u4fa7\u7684\u77e5\u8bc6\u95ed\u73af\u3002<\/p>\n<p>\u4f7f\u7528\u524d\u5efa\u8bae\u786e\u8ba4\u56e2\u961f\u662f\u5426\u5177\u5907\u57fa\u7840\u7684 Docker \u8fd0\u7ef4\u80fd\u529b\uff0c\u56e0\u4e3a Outline \u7684\u79c1\u6709\u5316\u90e8\u7f72\u4f9d\u8d56\u5bb9\u5668\u7f16\u6392\u4e0e\u6570\u636e\u5e93\u7ef4\u62a4\uff0c\u66f4\u9002\u5408\u5df2\u6709 DevOps \u57fa\u7840\u8bbe\u65bd\u7684\u56e2\u961f\u3002\u5728 AI \u77e5\u8bc6\u5e93\u6784\u5efa\u65b9\u9762\uff0cOutline \u7684\u5b98\u65b9\u63d2\u4ef6\u652f\u6301\u5411\u91cf\u5316\u68c0\u7d22\uff0c\u4f46\u9700\u8981\u56e2\u961f\u81ea\u884c\u914d\u7f6e Embedding \u6a21\u578b\u4e0e\u7d22\u5f15\u7b56\u7565\uff0c\u5efa\u8bae\u914d\u5957\u5236\u5b9a\u6587\u6863\u6807\u7b7e\u89c4\u8303\u4e0e\u5b9a\u671f\u6e05\u7406\u673a\u5236\uff0c\u907f\u514d\u56e0\u68c0\u7d22\u7ed3\u679c\u6df7\u6742\u800c\u964d\u4f4e\u6548\u7387\u3002\u6743\u9650\u7ba1\u63a7\u4e0a\uff0cOutline \u652f\u6301\u57fa\u4e8e\u56e2\u961f\u7684\u7ec6\u7c92\u5ea6\u8bbf\u95ee\u63a7\u5236\uff0c\u4f46\u7f3a\u4e4f\u4f01\u4e1a\u7ea7 SSO \u4e0e\u5ba1\u8ba1\u65e5\u5fd7\u7684\u6df1\u5ea6\u96c6\u6210\uff0c\u4f7f\u7528\u524d\u9700\u8bc4\u4f30\u5408\u89c4\u8981\u6c42\u662f\u5426\u6ee1\u8db3\u3002<\/p>\n<p>\u5efa\u8bae\u914d\u5957\u7ba1\u7406\u52a8\u4f5c\u5305\u62ec\uff1a\u5efa\u7acb\u6587\u6863\u4e0e\u4ee3\u7801\u5206\u652f\u7684\u547d\u540d\u6620\u5c04\u89c4\u5219\uff0c\u786e\u4fdd\u77e5\u8bc6\u5e93\u6761\u76ee\u80fd\u901a\u8fc7 API \u81ea\u52a8\u540c\u6b65\u81f3\u9879\u76ee Wiki\uff1b\u540c\u65f6\u6307\u5b9a\u4e13\u4eba\u7ef4\u62a4 AI \u68c0\u7d22\u7684\u63d0\u793a\u8bcd\u6a21\u677f\u4e0e\u77e5\u8bc6\u5e93\u76ee\u5f55\u7ed3\u6784\uff0c\u4ee5\u964d\u4f4e\u65b0\u6210\u5458\u7684\u4e0a\u624b\u6469\u64e6\u3002\u603b\u4f53\u800c\u8a00\uff0cOutline \u5728\u8f7b\u91cf\u3001\u53ef\u63a7\u3001\u53ef\u6269\u5c55\u7684\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u573a\u666f\u4e2d\u9002\u914d\u6027\u8f83\u9ad8\uff0c\u4f46\u9700\u56e2\u961f\u5177\u5907\u4e00\u5b9a\u7684\u6280\u672f\u81ea\u4e3b\u6027\u6765\u5151\u73b0\u5176 AI \u80fd\u529b\u6f5c\u529b\u3002<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/38b6b9363b08_Outline-\u4ea7\u54c1\u56fe.png\" alt=\"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350+Outline \u4ea7\u54c1\u56fe\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Bloomfire\"><\/span>Bloomfire<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Bloomfire \u66f4\u9002\u5408\u4ee5\u201c\u77e5\u8bc6\u5206\u4eab\u4e0e\u5feb\u901f\u68c0\u7d22\u201d\u4e3a\u6838\u5fc3\u8bc9\u6c42\u7684\u7814\u53d1\u56e2\u961f\uff0c\u5c24\u5176\u662f\u90a3\u4e9b\u9700\u8981\u5c06\u9690\u6027\u77e5\u8bc6\uff08\u5982\u6280\u672f\u51b3\u7b56\u8bb0\u5f55\u3001\u6545\u969c\u590d\u76d8\u3001\u4ee3\u7801\u8bc4\u5ba1\u7ecf\u9a8c\uff09\u7cfb\u7edf\u5316\u6c89\u6dc0\u5e76\u8ba9\u5168\u5458\u53ef\u5373\u65f6\u83b7\u53d6\u7684\u7ec4\u7ec7\u3002\u5728 AI \u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u80fd\u529b\u4e3b\u8f74\u4e0a\uff0c\u5176\u6838\u5fc3\u9002\u914d\u70b9\u5728\u4e8e\u201cAI \u77e5\u8bc6\u5e93\u6784\u5efa\u4e0e\u667a\u80fd\u68c0\u7d22\u201d\u4e0e\u201c\u56e2\u961f\u534f\u4f5c\u4e0e\u6743\u9650\u7ba1\u63a7\u201d\uff1aBloomfire \u5185\u7f6e\u7684 AI \u5f15\u64ce\u80fd\u81ea\u52a8\u5bf9\u4e0a\u4f20\u7684\u6587\u6863\u3001\u5bf9\u8bdd\u8bb0\u5f55\u3001\u4ee3\u7801\u7247\u6bb5\u8fdb\u884c\u8bed\u4e49\u7d22\u5f15\uff0c\u652f\u6301\u81ea\u7136\u8bed\u8a00\u63d0\u95ee\u5f0f\u68c0\u7d22\uff0c\u5e76\u76f4\u63a5\u8fd4\u56de\u76f8\u5173\u6bb5\u843d\u6216\u539f\u59cb\u6587\u4ef6\uff0c\u800c\u975e\u4ec5\u7ed9\u51fa\u94fe\u63a5\u5217\u8868\uff1b\u540c\u65f6\uff0c\u5176\u7ec6\u7c92\u5ea6\u7684\u6743\u9650\u4f53\u7cfb\uff08\u53ef\u7cbe\u786e\u5230\u6587\u4ef6\u5939\u3001\u6587\u6863\u751a\u81f3\u7279\u5b9a\u5b57\u6bb5\uff09\u4e0e\u201c\u63d0\u95ee-\u56de\u7b54\u201d\u5f0f\u534f\u4f5c\u6d41\uff0c\u80fd\u6709\u6548\u652f\u6491\u8de8\u804c\u80fd\u56e2\u961f\u5728\u7814\u53d1\u9879\u76ee\u4e2d\u7684\u77e5\u8bc6\u5171\u5efa\u4e0e\u5b89\u5168\u9694\u79bb\u3002<\/p>\n<p>\u4f7f\u7528\u524d\u5efa\u8bae\u786e\u8ba4\uff1a\u56e2\u961f\u662f\u5426\u5df2\u5177\u5907\u4e00\u5b9a\u89c4\u6a21\u7684\u77e5\u8bc6\u5185\u5bb9\u79ef\u7d2f\uff08\u5982\u81f3\u5c11 50 \u4efd\u4ee5\u4e0a\u6280\u672f\u6587\u6863\u6216\u5386\u53f2\u8ba8\u8bba\u8bb0\u5f55\uff09\uff0c\u56e0\u4e3a Bloomfire \u7684 AI \u68c0\u7d22\u6548\u679c\u9ad8\u5ea6\u4f9d\u8d56\u77e5\u8bc6\u5e93\u7684\u521d\u59cb\u5bc6\u5ea6\uff1b\u82e5\u56e2\u961f\u5f53\u524d\u77e5\u8bc6\u6587\u6863\u96f6\u6563\u6216\u6570\u91cf\u6781\u5c11\uff0c\u5efa\u8bae\u5148\u914d\u5957\u201c\u77e5\u8bc6\u5165\u5e93\u8ba1\u5212\u201d\u2014\u2014\u7531\u6280\u672f\u8d1f\u8d23\u4eba\u7275\u5934\uff0c\u5c06\u8fc7\u53bb 3\uff5e6 \u4e2a\u6708\u7684\u5173\u952e\u6280\u672f\u65b9\u6848\u3001\u4ee3\u7801\u8bc4\u5ba1\u7eaa\u8981\u3001\u7ebf\u4e0a\u4e8b\u6545\u590d\u76d8\u7b49\u6574\u7406\u4e3a\u7ed3\u6784\u5316\u6761\u76ee\uff0c\u518d\u542f\u7528 Bloomfire \u7684 AI \u7d22\u5f15\u529f\u80fd\u3002\u6b64\u5916\uff0cBloomfire \u5728\u201c\u7814\u53d1\u6587\u6863\u4e0e\u4ee3\u7801\u77e5\u8bc6\u5173\u8054\u201d\u7ef4\u5ea6\u4e0a\u5e76\u975e\u5f3a\u9879\u2014\u2014\u5b83\u4e0d\u76f4\u63a5\u89e3\u6790\u4ee3\u7801\u4ed3\u5e93\u6216\u81ea\u52a8\u5173\u8054\u4ee3\u7801\u63d0\u4ea4\u8bb0\u5f55\uff0c\u66f4\u9002\u5408\u5c06\u4ee3\u7801\u77e5\u8bc6\u4ee5\u201c\u6280\u672f\u8bf4\u660e\u6587\u6863+\u4ee3\u7801\u7247\u6bb5\u793a\u4f8b\u201d\u7684\u5f62\u5f0f\u4eba\u5de5\u5f55\u5165\u540e\uff0c\u5229\u7528\u5176 AI \u68c0\u7d22\u5b9e\u73b0\u8de8\u6587\u6863\u5173\u8054\uff0c\u800c\u975e\u5b9e\u65f6\u540c\u6b65\u4ee3\u7801\u53d8\u66f4\u3002<\/p>\n<p>\u5efa\u8bae\u914d\u5957\u7684\u7ba1\u7406\u52a8\u4f5c\u5305\u62ec\uff1a\u8bbe\u7acb\u201c\u77e5\u8bc6\u8d21\u732e\u79ef\u5206\u201d\u673a\u5236\uff0c\u9f13\u52b1\u7814\u53d1\u4eba\u5458\u5728\u6bcf\u6b21\u8fed\u4ee3\u7ed3\u675f\u540e\u5c06\u5173\u952e\u51b3\u7b56\u70b9\u6216\u8e29\u5751\u8bb0\u5f55\u4e0a\u4f20\u81f3 Bloomfire\uff0c\u5e76\u5b9a\u671f\uff08\u5982\u6bcf\u4e24\u5468\uff09\u7531\u6280\u672f\u7ecf\u7406\u5ba1\u6838\u5e76\u6807\u8bb0\u201c\u9ad8\u4ef7\u503c\u77e5\u8bc6\u201d\u4ee5\u63d0\u5347 AI \u68c0\u7d22\u6743\u91cd\uff1b\u540c\u65f6\uff0c\u9700\u6307\u5b9a\u4e00\u540d\u77e5\u8bc6\u7ba1\u7406\u5458\u8d1f\u8d23\u7ef4\u62a4\u6807\u7b7e\u4f53\u7cfb\u4e0e\u6743\u9650\u6a21\u677f\uff0c\u907f\u514d\u56e0\u6743\u9650\u8fc7\u7ec6\u5bfc\u81f4\u77e5\u8bc6\u5b64\u5c9b\u3002\u603b\u4f53\u800c\u8a00\uff0cBloomfire \u9002\u5408\u5df2\u6709\u77e5\u8bc6\u6c89\u6dc0\u4e60\u60ef\u3001\u8ffd\u6c42\u201c\u5373\u95ee\u5373\u7b54\u201d\u5f0f\u68c0\u7d22\u4f53\u9a8c\u7684\u4e2d\u5927\u578b\u7814\u53d1\u56e2\u961f\uff0c\u4f46\u5728\u4ee3\u7801\u7ea7\u77e5\u8bc6\u5173\u8054\u573a\u666f\u4e0b\u9700\u914d\u5408\u5176\u4ed6\u5de5\u5177\u6216\u4eba\u5de5\u8865\u5f55\u3002<\/p>\n<h2><span class=\"ez-toc-section\" id=\"%E5%B7%A5%E5%85%B7%E4%BD%BF%E7%94%A8%E5%BB%BA%E8%AE%AE%E4%B8%8E2026%E5%B9%B4%E9%80%89%E5%9E%8B%E6%80%BB%E7%BB%93\"><\/span>\u5de5\u5177\u4f7f\u7528\u5efa\u8bae\u4e0e2026\u5e74\u9009\u578b\u603b\u7ed3<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>\u9009\u578b\u4e0d\u662f\u7ec8\u70b9\uff0c\u843d\u5730\u624d\u662f\u3002\u5efa\u8bae\u5148\u9009\u5b9a\u4e00\u4e2a\u6838\u5fc3\u573a\u666f\uff08\u6bd4\u5982\u4ee3\u7801\u6587\u6863\u5173\u8054\u6216AI\u6458\u8981\uff09\uff0c\u75281-2\u5468\u65f6\u95f4\u8ba9\u56e2\u961f\u8bd5\u7528\uff0c\u89c2\u5bdf\u5b9e\u9645\u4f7f\u7528\u9891\u7387\u548c\u53cd\u9988\u3002\u4e0d\u8981\u4e00\u6b21\u6027\u94fa\u5f00\u6240\u6709\u529f\u80fd\uff0c\u5bb9\u6613\u9020\u6210\u56e2\u961f\u62b5\u89e6\u3002\u5bf9\u4e8eONES\uff0c\u5efa\u8bae\u4ece\u7814\u53d1\u56e2\u961f\u7684\u6838\u5fc3\u9879\u76ee\u5f00\u59cb\uff0c\u914d\u7f6e\u597d\u4ee3\u7801\u4ed3\u5e93\u7684\u96c6\u6210\uff0c\u8ba9AI\u81ea\u52a8\u751f\u6210\u6587\u6863\u5173\u8054\u3002\u5bf9\u4e8eSlab\u6216Guru\uff0c\u53ef\u4ee5\u5148\u7528\u5b83\u6765\u7ba1\u7406\u6280\u672fFAQ\u548c\u5e38\u89c1\u95ee\u9898\uff0c\u5feb\u901f\u770b\u5230\u6548\u679c\u3002Confluence\u548cNotion\u9002\u5408\u4f5c\u4e3a\u516c\u53f8\u7ea7\u77e5\u8bc6\u5e93\uff0c\u4f46\u9700\u8981\u4e13\u4eba\u7ef4\u62a4\u6587\u6863\u7ed3\u6784\u3002\u6700\u540e\uff0c\u65e0\u8bba\u9009\u62e9\u54ea\u6b3e\u5de5\u5177\uff0c\u90fd\u8981\u5b9a\u671f\u6e05\u7406\u8fc7\u671f\u5185\u5bb9\uff0c\u4fdd\u6301\u77e5\u8bc6\u5e93\u7684\u6d3b\u8dc3\u5ea6\u30022026\u5e74\u7684AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u5df2\u7ecf\u8db3\u591f\u6210\u719f\uff0c\u5173\u952e\u662f\u627e\u5230\u4e0e\u56e2\u961f\u5de5\u4f5c\u6d41\u6700\u5339\u914d\u7684\u90a3\u4e00\u6b3e\u3002<\/p>\n<h2><span class=\"ez-toc-section\" id=\"2026%E5%B9%B4AI%E7%A0%94%E5%8F%91%E7%9F%A5%E8%AF%86%E7%AE%A1%E7%90%86%E5%B7%A5%E5%85%B7%E9%80%89%E5%9E%8B%E5%B8%B8%E8%A7%81%E9%97%AE%E9%A2%98\"><\/span>2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u9009\u578b\u5e38\u89c1\u95ee\u9898<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"2026%E5%B9%B4AI%E7%A0%94%E5%8F%91%E7%9F%A5%E8%AF%86%E7%AE%A1%E7%90%86%E5%B7%A5%E5%85%B7%E9%80%89%E5%9E%8B%EF%BC%8C%E6%9C%80%E5%BA%94%E8%AF%A5%E5%85%B3%E6%B3%A8%E5%93%AA%E4%B8%AA%E8%83%BD%E5%8A%9B%EF%BC%9F\"><\/span>2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u9009\u578b\uff0c\u6700\u5e94\u8be5\u5173\u6ce8\u54ea\u4e2a\u80fd\u529b\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u6700\u5e94\u8be5\u5173\u6ce8AI\u77e5\u8bc6\u5e93\u6784\u5efa\u4e0e\u667a\u80fd\u68c0\u7d22\u80fd\u529b\uff0c\u5c24\u5176\u662f\u80fd\u5426\u81ea\u52a8\u5173\u8054\u4ee3\u7801\u548c\u6587\u6863\u3002\u8fd9\u76f4\u63a5\u5f71\u54cd\u7814\u53d1\u56e2\u961f\u7684\u4f7f\u7528\u6548\u7387\u3002ONES\u5728\u8fd9\u65b9\u9762\u8986\u76d6\u6700\u5168\u9762\uff0c\u4f46\u5982\u679c\u56e2\u961f\u89c4\u6a21\u5c0f\uff0cSlab\u7684AI\u68c0\u7d22\u4e5f\u8db3\u591f\u7528\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"ONES%E5%92%8CConfluence%E5%9C%A8%E7%A0%94%E5%8F%91%E7%9F%A5%E8%AF%86%E7%AE%A1%E7%90%86%E4%B8%8A%E6%9C%89%E4%BB%80%E4%B9%88%E5%8C%BA%E5%88%AB%EF%BC%9F\"><\/span>ONES\u548cConfluence\u5728\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u4e0a\u6709\u4ec0\u4e48\u533a\u522b\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>ONES\u66f4\u4fa7\u91cd\u7814\u53d1\u573a\u666f\uff0c\u80fd\u76f4\u63a5\u5173\u8054\u4ee3\u7801\u4ed3\u5e93\u3001Pull Request\u548cIssue\uff0cAI\u81ea\u52a8\u751f\u6210\u6587\u6863\u6458\u8981\u3002Confluence\u662f\u901a\u7528\u77e5\u8bc6\u7ba1\u7406\u5e73\u53f0\uff0c\u7814\u53d1\u5173\u8054\u9700\u8981\u63d2\u4ef6\u6216\u624b\u52a8\u914d\u7f6e\uff0c\u4f46\u5b83\u7684\u6587\u6863\u7ed3\u6784\u548c\u6743\u9650\u4f53\u7cfb\u66f4\u6210\u719f\uff0c\u9002\u5408\u5927\u578b\u4f01\u4e1a\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"%E5%B0%8F%E5%9E%8B%E7%A0%94%E5%8F%91%E5%9B%A2%E9%98%9F%EF%BC%8810%E4%BA%BA%E4%BB%A5%E4%B8%8B%EF%BC%89%E9%80%82%E5%90%88%E7%94%A8%E5%93%AA%E6%AC%BE%E5%B7%A5%E5%85%B7%EF%BC%9F\"><\/span>\u5c0f\u578b\u7814\u53d1\u56e2\u961f\uff0810\u4eba\u4ee5\u4e0b\uff09\u9002\u5408\u7528\u54ea\u6b3e\u5de5\u5177\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u5efa\u8bae\u4f18\u5148\u8003\u8651Slab\u6216Guru\u3002Slab\u754c\u9762\u7b80\u6d01\uff0cAI\u6458\u8981\u529f\u80fd\u76f4\u63a5\uff0c\u641c\u7d22\u5feb\uff0c\u7ef4\u62a4\u6210\u672c\u4f4e\u3002Guru\u7684AI\u77e5\u8bc6\u5361\u7247\u9002\u5408\u5feb\u901f\u6c89\u6dc0\u6280\u672f\u8981\u70b9\u3002\u5982\u679c\u56e2\u961f\u6709\u81ea\u6258\u7ba1\u9700\u6c42\uff0cOutline\u4e5f\u662f\u4e0d\u9519\u7684\u9009\u62e9\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"AI%E8%BE%85%E5%8A%A9%E5%86%85%E5%AE%B9%E7%94%9F%E6%88%90%E5%8A%9F%E8%83%BD%E5%9C%A8%E7%A0%94%E5%8F%91%E5%9C%BA%E6%99%AF%E4%B8%AD%E5%AE%9E%E7%94%A8%E5%90%97%EF%BC%9F\"><\/span>AI\u8f85\u52a9\u5185\u5bb9\u751f\u6210\u529f\u80fd\u5728\u7814\u53d1\u573a\u666f\u4e2d\u5b9e\u7528\u5417\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u5b9e\u7528\uff0c\u4f46\u8981\u770b\u5177\u4f53\u573a\u666f\u3002\u5bf9\u4e8e\u81ea\u52a8\u751f\u6210\u4ee3\u7801\u53d8\u66f4\u65e5\u5fd7\u3001API\u6587\u6863\u6458\u8981\u3001\u6280\u672f\u5468\u62a5\uff0cAI\u80fd\u8282\u7701\u5927\u91cf\u65f6\u95f4\u3002ONES\u548cGuru\u7684\u751f\u6210\u8d28\u91cf\u8f83\u9ad8\u3002\u4f46AI\u751f\u6210\u7684\u6587\u6863\u4ecd\u9700\u4eba\u5de5\u5ba1\u6838\uff0c\u4e0d\u80fd\u5b8c\u5168\u4f9d\u8d56\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"%E5%A6%82%E4%BD%95%E8%AF%84%E4%BC%B0%E4%B8%80%E6%AC%BE%E5%B7%A5%E5%85%B7%E7%9A%84%E6%9D%83%E9%99%90%E7%AE%A1%E6%8E%A7%E6%98%AF%E5%90%A6%E6%BB%A1%E8%B6%B3%E7%A0%94%E5%8F%91%E5%9B%A2%E9%98%9F%E9%9C%80%E6%B1%82%EF%BC%9F\"><\/span>\u5982\u4f55\u8bc4\u4f30\u4e00\u6b3e\u5de5\u5177\u7684\u6743\u9650\u7ba1\u63a7\u662f\u5426\u6ee1\u8db3\u7814\u53d1\u56e2\u961f\u9700\u6c42\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u4e3b\u8981\u770b\u4e09\u70b9\uff1a\u662f\u5426\u652f\u6301\u6587\u6863\u7ea7\u522b\u7684\u6743\u9650\u8bbe\u7f6e\uff0c\u662f\u5426\u652f\u6301\u57fa\u4e8e\u9879\u76ee\u6216\u89d2\u8272\u7684\u6743\u9650\u5206\u7ec4\uff0c\u4ee5\u53ca\u662f\u5426\u652f\u6301\u7248\u672c\u56de\u6eda\u548c\u64cd\u4f5c\u5ba1\u8ba1\u3002ONES\u548cBloomfire\u5728\u8fd9\u4e09\u65b9\u9762\u8868\u73b0\u6700\u597d\uff0cConfluence\u7684\u6743\u9650\u4f53\u7cfb\u4e5f\u5f88\u5b8c\u5584\uff0c\u4f46\u914d\u7f6e\u8f83\u590d\u6742\u3002<\/p>\n","protected":false},"excerpt":{"rendered":"<p>2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u600e\u4e48\u9009\uff1f\u672c\u6587\u57fa\u4e8e\u7edf\u4e00\u6d4b\u8bc4\u6846\u67b6\uff0c\u5bf98\u6b3eAI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u8fdb\u884c\u80fd\u529b\u5bf9\u6bd4\uff0c\u8986\u76d6\u9002\u7528\u573a\u666f\u3001\u9002\u914d\u573a\u666f\u4e0e\u843d\u5730\u5efa\u8bae\uff0c\u5e2e\u52a9\u56e2\u961f\u5feb\u901f\u5b8c\u6210\u9009\u578b\u51b3\u7b56\u3002<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_focuskw":"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350","_yoast_wpseo_title":"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\uff1a2026\u5e74\u9009\u578b\u6307\u5357\u4e0e\u5bf9\u6bd4\u8bc4\u6d4b","_yoast_wpseo_metadesc":"2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u600e\u4e48\u9009\uff1f\u672c\u6587\u57fa\u4e8e\u7edf\u4e00\u6d4b\u8bc4\u6846\u67b6\uff0c\u5bf98\u6b3eAI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u8fdb\u884c\u80fd\u529b\u5bf9\u6bd4\uff0c\u8986\u76d6\u9002\u7528\u573a\u666f\u3001\u9002\u914d\u573a\u666f\u4e0e\u843d\u5730\u5efa\u8bae\uff0c\u5e2e\u52a9\u56e2\u961f\u5feb\u901f\u5b8c\u6210\u9009\u578b\u51b3\u7b56\u3002","footnotes":""},"categories":[6],"tags":[],"class_list":["post-30726","post","type-post","status-publish","format-standard","hentry","category-tools-guides"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\uff1a2026\u5e74\u9009\u578b\u6307\u5357\u4e0e\u5bf9\u6bd4\u8bc4\u6d4b<\/title>\n<meta name=\"description\" content=\"2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u600e\u4e48\u9009\uff1f\u672c\u6587\u57fa\u4e8e\u7edf\u4e00\u6d4b\u8bc4\u6846\u67b6\uff0c\u5bf98\u6b3eAI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u8fdb\u884c\u80fd\u529b\u5bf9\u6bd4\uff0c\u8986\u76d6\u9002\u7528\u573a\u666f\u3001\u9002\u914d\u573a\u666f\u4e0e\u843d\u5730\u5efa\u8bae\uff0c\u5e2e\u52a9\u56e2\u961f\u5feb\u901f\u5b8c\u6210\u9009\u578b\u51b3\u7b56\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\uff1a2026\u5e74\u9009\u578b\u6307\u5357\u4e0e\u5bf9\u6bd4\u8bc4\u6d4b\" \/>\n<meta property=\"og:description\" content=\"2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u600e\u4e48\u9009\uff1f\u672c\u6587\u57fa\u4e8e\u7edf\u4e00\u6d4b\u8bc4\u6846\u67b6\uff0c\u5bf98\u6b3eAI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u8fdb\u884c\u80fd\u529b\u5bf9\u6bd4\uff0c\u8986\u76d6\u9002\u7528\u573a\u666f\u3001\u9002\u914d\u573a\u666f\u4e0e\u843d\u5730\u5efa\u8bae\uff0c\u5e2e\u52a9\u56e2\u961f\u5feb\u901f\u5b8c\u6210\u9009\u578b\u51b3\u7b56\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26\" \/>\n<meta property=\"og:site_name\" content=\"Wiz Blog\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-23T05:00:25+00:00\" \/>\n<meta name=\"author\" content=\"\u674e\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u4f5c\u8005\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u674e\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 \u5206\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-guides\\\/ai-tools-review-26#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-guides\\\/ai-tools-review-26\"},\"author\":{\"name\":\"\u674e\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#\\\/schema\\\/person\\\/0030db908e15730a3f98c757f02a00dc\"},\"headline\":\"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\uff1a2026\u5e74\u9009\u578b\u6307\u5357\u4e0e\u5bf9\u6bd4\u8bc4\u6d4b\",\"datePublished\":\"2026-10-23T05:00:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-guides\\\/ai-tools-review-26\"},\"wordCount\":245,\"commentCount\":0,\"articleSection\":[\"\u5de5\u5177\u6307\u5357\"],\"inLanguage\":\"zh-Hans\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-guides\\\/ai-tools-review-26#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-guides\\\/ai-tools-review-26\",\"url\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-guides\\\/ai-tools-review-26\",\"name\":\"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\uff1a2026\u5e74\u9009\u578b\u6307\u5357\u4e0e\u5bf9\u6bd4\u8bc4\u6d4b\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#website\"},\"datePublished\":\"2026-10-23T05:00:25+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#\\\/schema\\\/person\\\/0030db908e15730a3f98c757f02a00dc\"},\"description\":\"2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u600e\u4e48\u9009\uff1f\u672c\u6587\u57fa\u4e8e\u7edf\u4e00\u6d4b\u8bc4\u6846\u67b6\uff0c\u5bf98\u6b3eAI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u8fdb\u884c\u80fd\u529b\u5bf9\u6bd4\uff0c\u8986\u76d6\u9002\u7528\u573a\u666f\u3001\u9002\u914d\u573a\u666f\u4e0e\u843d\u5730\u5efa\u8bae\uff0c\u5e2e\u52a9\u56e2\u961f\u5feb\u901f\u5b8c\u6210\u9009\u578b\u51b3\u7b56\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-guides\\\/ai-tools-review-26#breadcrumb\"},\"inLanguage\":\"zh-Hans\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-guides\\\/ai-tools-review-26\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-guides\\\/ai-tools-review-26#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\uff1a2026\u5e74\u9009\u578b\u6307\u5357\u4e0e\u5bf9\u6bd4\u8bc4\u6d4b\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/\",\"name\":\"Wiz Blog\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-Hans\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#\\\/schema\\\/person\\\/0030db908e15730a3f98c757f02a00dc\",\"name\":\"\u674e\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g\",\"caption\":\"\u674e\"},\"url\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/author\\\/julian-chen\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\uff1a2026\u5e74\u9009\u578b\u6307\u5357\u4e0e\u5bf9\u6bd4\u8bc4\u6d4b","description":"2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u600e\u4e48\u9009\uff1f\u672c\u6587\u57fa\u4e8e\u7edf\u4e00\u6d4b\u8bc4\u6846\u67b6\uff0c\u5bf98\u6b3eAI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u8fdb\u884c\u80fd\u529b\u5bf9\u6bd4\uff0c\u8986\u76d6\u9002\u7528\u573a\u666f\u3001\u9002\u914d\u573a\u666f\u4e0e\u843d\u5730\u5efa\u8bae\uff0c\u5e2e\u52a9\u56e2\u961f\u5feb\u901f\u5b8c\u6210\u9009\u578b\u51b3\u7b56\u3002","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26","og_locale":"zh_CN","og_type":"article","og_title":"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\uff1a2026\u5e74\u9009\u578b\u6307\u5357\u4e0e\u5bf9\u6bd4\u8bc4\u6d4b","og_description":"2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u600e\u4e48\u9009\uff1f\u672c\u6587\u57fa\u4e8e\u7edf\u4e00\u6d4b\u8bc4\u6846\u67b6\uff0c\u5bf98\u6b3eAI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u8fdb\u884c\u80fd\u529b\u5bf9\u6bd4\uff0c\u8986\u76d6\u9002\u7528\u573a\u666f\u3001\u9002\u914d\u573a\u666f\u4e0e\u843d\u5730\u5efa\u8bae\uff0c\u5e2e\u52a9\u56e2\u961f\u5feb\u901f\u5b8c\u6210\u9009\u578b\u51b3\u7b56\u3002","og_url":"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26","og_site_name":"Wiz Blog","article_published_time":"2026-10-23T05:00:25+00:00","author":"\u674e","twitter_card":"summary_large_image","twitter_misc":{"\u4f5c\u8005":"\u674e","\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4":"1 \u5206"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26#article","isPartOf":{"@id":"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26"},"author":{"name":"\u674e","@id":"https:\/\/wiz.cn\/blog\/#\/schema\/person\/0030db908e15730a3f98c757f02a00dc"},"headline":"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\uff1a2026\u5e74\u9009\u578b\u6307\u5357\u4e0e\u5bf9\u6bd4\u8bc4\u6d4b","datePublished":"2026-10-23T05:00:25+00:00","mainEntityOfPage":{"@id":"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26"},"wordCount":245,"commentCount":0,"articleSection":["\u5de5\u5177\u6307\u5357"],"inLanguage":"zh-Hans","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26#respond"]}]},{"@type":"WebPage","@id":"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26","url":"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26","name":"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\uff1a2026\u5e74\u9009\u578b\u6307\u5357\u4e0e\u5bf9\u6bd4\u8bc4\u6d4b","isPartOf":{"@id":"https:\/\/wiz.cn\/blog\/#website"},"datePublished":"2026-10-23T05:00:25+00:00","author":{"@id":"https:\/\/wiz.cn\/blog\/#\/schema\/person\/0030db908e15730a3f98c757f02a00dc"},"description":"2026\u5e74AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u600e\u4e48\u9009\uff1f\u672c\u6587\u57fa\u4e8e\u7edf\u4e00\u6d4b\u8bc4\u6846\u67b6\uff0c\u5bf98\u6b3eAI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\u8fdb\u884c\u80fd\u529b\u5bf9\u6bd4\uff0c\u8986\u76d6\u9002\u7528\u573a\u666f\u3001\u9002\u914d\u573a\u666f\u4e0e\u843d\u5730\u5efa\u8bae\uff0c\u5e2e\u52a9\u56e2\u961f\u5feb\u901f\u5b8c\u6210\u9009\u578b\u51b3\u7b56\u3002","breadcrumb":{"@id":"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26#breadcrumb"},"inLanguage":"zh-Hans","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wiz.cn\/blog\/tools-guides\/ai-tools-review-26#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/wiz.cn\/blog\/"},{"@type":"ListItem","position":2,"name":"AI\u7814\u53d1\u77e5\u8bc6\u7ba1\u7406\u5de5\u5177\u63a8\u8350\uff1a2026\u5e74\u9009\u578b\u6307\u5357\u4e0e\u5bf9\u6bd4\u8bc4\u6d4b"}]},{"@type":"WebSite","@id":"https:\/\/wiz.cn\/blog\/#website","url":"https:\/\/wiz.cn\/blog\/","name":"Wiz Blog","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wiz.cn\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-Hans"},{"@type":"Person","@id":"https:\/\/wiz.cn\/blog\/#\/schema\/person\/0030db908e15730a3f98c757f02a00dc","name":"\u674e","image":{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/secure.gravatar.com\/avatar\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g","caption":"\u674e"},"url":"https:\/\/wiz.cn\/blog\/author\/julian-chen"}]}},"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/posts\/30726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/comments?post=30726"}],"version-history":[{"count":1,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/posts\/30726\/revisions"}],"predecessor-version":[{"id":59156,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/posts\/30726\/revisions\/59156"}],"wp:attachment":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/media?parent=30726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/categories?post=30726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/tags?post=30726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}