{"id":19578,"date":"2026-08-05T06:15:29","date_gmt":"2026-08-04T22:15:29","guid":{"rendered":"https:\/\/wiz.cn\/blog\/?p=19578"},"modified":"2026-08-05T06:15:29","modified_gmt":"2026-08-04T22:15:29","slug":"demand-project-integration-platforms-2026","status":"publish","type":"post","link":"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026","title":{"rendered":"\u9700\u6c42\u5230\u4ea4\u4ed8\u5982\u4f55\u6253\u901a\uff1f2026\u5e749\u6b3e\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6df1\u5ea6\u76d8\u70b9"},"content":{"rendered":"<p>\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u7684\u4e00\u4f53\u5316\uff0c\u6838\u5fc3\u5728\u4e8e\u6d88\u9664\u4fe1\u606f\u65ad\u5c42\u3002\u672c\u6587\u5c06\u9010\u4e00\u89e3\u6790<strong>9\u6b3e\u5177\u5907\u4ee3\u8868\u6027\u7684\u5e73\u53f0<\/strong>\uff1a<strong>1. ONES<\/strong>\uff1b<strong>2. Azure DevOps<\/strong>\uff1b<strong>3. \u732a\u9f7f\u9c7cChoerodon<\/strong>\uff1b<strong>4. \u4e8b\u4e95\u7136<\/strong>\uff1b<strong>5. YouTrack<\/strong>\uff1b<strong>6. GitHub Projects<\/strong>\uff1b<strong>7. CODING DevOps<\/strong>\uff1b<strong>8. Basecamp<\/strong>\uff1b<strong>9. Leangoo\u9886\u6b4c<\/strong>\u3002\u4f01\u4e1a\u9009\u578b\u65f6\uff0c\u901a\u5e38\u9762\u4e34\u9700\u6c42\u80cc\u666f\u4e22\u5931\u3001\u6267\u884c\u72b6\u6001\u4e0d\u900f\u660e\u3001\u53d8\u66f4\u96be\u4ee5\u8ffd\u6eaf\u7b49\u75db\u70b9\u2014\u2014\u6839\u6e90\u5e76\u975e\u7f3a\u5c11\u4efb\u52a1\u5de5\u5177\uff0c\u800c\u662f\u9700\u6c42\u4ece\u63d0\u51fa\u5230\u4ea4\u4ed8\u7684\u5404\u73af\u8282\u5206\u6563\u5728\u4e0d\u540c\u7cfb\u7edf\u4e2d\u3002\u82e5\u9700\u8d2f\u901a\u4ea7\u54c1\u9700\u6c42\u4e0e\u7814\u53d1\u4ea4\u4ed8\uff0c\u53ef\u91cd\u70b9\u8bc4\u4f30ONES\u3001Azure DevOps\u3001CODING DevOps\u53ca\u732a\u9f7f\u9c7cChoerodon\uff1b\u82e5\u9700\u6c42\u6e90\u81ea\u591a\u4e1a\u52a1\u90e8\u95e8\uff0c\u4e8b\u4e95\u7136\u66f4\u9002\u914d\u8de8\u90e8\u95e8\u9879\u76ee\u6cbb\u7406\uff1b\u4ee3\u7801\u4ed3\u5e93\u9a71\u52a8\u6216\u8f7b\u91cf\u654f\u6377\u56e2\u961f\uff0c\u5219\u53ef\u5173\u6ce8GitHub Projects\u3001YouTrack\u4e0eLeangoo\u9886\u6b4c\u3002\u4e0b\u6587\u5c06\u56f4\u7ed5\u9700\u6c42\u7ba1\u7406\u6df1\u5ea6\u3001\u9879\u76ee\u6267\u884c\u3001\u8ffd\u6eaf\u80fd\u529b\u3001\u9002\u7528\u573a\u666f\u4e0e\u90e8\u7f72\u6761\u4ef6\u5c55\u5f00\u5bf9\u6bd4\u3002<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_83 counter-hierarchy ez-toc-counter ez-toc-light-blue ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#%E4%B8%80%E3%80%81%E8%AF%84%E4%BC%B0%E4%B8%80%E4%BD%93%E5%8C%96%E5%B9%B3%E5%8F%B0%E9%9C%80%E5%85%B3%E6%B3%A8%E7%9A%84%E4%BA%94%E9%A1%B9%E6%A0%B8%E5%BF%83%E8%83%BD%E5%8A%9B\" >\u4e00\u3001\u8bc4\u4f30\u4e00\u4f53\u5316\u5e73\u53f0\u9700\u5173\u6ce8\u7684\u4e94\u9879\u6838\u5fc3\u80fd\u529b<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#1_%E7%BB%9F%E4%B8%80%E9%9C%80%E6%B1%82%E5%85%A5%E5%8F%A3%E7%9A%84%E5%BB%BA%E7%AB%8B\" >1. \u7edf\u4e00\u9700\u6c42\u5165\u53e3\u7684\u5efa\u7acb<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#2_%E8%AF%84%E5%AE%A1%E5%88%B0%E6%89%A7%E8%A1%8C%E7%9A%84%E6%97%A0%E7%BC%9D%E8%A1%94%E6%8E%A5\" >2. \u8bc4\u5ba1\u5230\u6267\u884c\u7684\u65e0\u7f1d\u8854\u63a5<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#3_%E5%AF%B9%E5%AE%9E%E9%99%85%E9%A1%B9%E7%9B%AE%E7%AE%A1%E7%90%86%E6%96%B9%E5%BC%8F%E7%9A%84%E6%94%AF%E6%92%91\" >3. \u5bf9\u5b9e\u9645\u9879\u76ee\u7ba1\u7406\u65b9\u5f0f\u7684\u652f\u6491<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#3_%E9%9C%80%E6%B1%82%E5%8F%98%E6%9B%B4%E7%9A%84%E5%AE%8C%E6%95%B4%E8%BF%BD%E6%BA%AF\" >3. \u9700\u6c42\u53d8\u66f4\u7684\u5b8c\u6574\u8ffd\u6eaf<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#5_%E9%83%A8%E7%BD%B2%E3%80%81%E6%9D%83%E9%99%90%E4%B8%8E%E7%B3%BB%E7%BB%9F%E6%B2%BB%E7%90%86%E7%9A%84%E5%8C%B9%E9%85%8D%E5%BA%A6\" >5. \u90e8\u7f72\u3001\u6743\u9650\u4e0e\u7cfb\u7edf\u6cbb\u7406\u7684\u5339\u914d\u5ea6<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#%E4%BA%8C%E3%80%819%E6%AC%BE%E9%9C%80%E6%B1%82%E7%AE%A1%E7%90%86%E4%B8%8E%E9%A1%B9%E7%9B%AE%E7%AE%A1%E7%90%86%E4%B8%80%E4%BD%93%E5%8C%96%E5%B9%B3%E5%8F%B0%E8%AF%A6%E8%A7%A3\" >\u4e8c\u30019\u6b3e\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\u8be6\u89e3<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#1%E3%80%81ONES%EF%BC%9A%E9%9D%A2%E5%90%91%E4%B8%AD%E5%A4%A7%E5%9E%8B%E7%BB%84%E7%BB%87%E7%9A%84%E4%B8%80%E4%BD%93%E5%8C%96%E7%A0%94%E5%8F%91%E7%AE%A1%E7%90%86%E5%B9%B3%E5%8F%B0\" >1\u3001ONES\uff1a\u9762\u5411\u4e2d\u5927\u578b\u7ec4\u7ec7\u7684\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#2%E3%80%81Azure_DevOps%EF%BC%9A%E5%BE%AE%E8%BD%AF%E6%8A%80%E6%9C%AF%E4%BD%93%E7%B3%BB%E4%B8%8B%E7%9A%84%E9%9C%80%E6%B1%82%E4%B8%8E%E5%B7%A5%E7%A8%8B%E4%BA%A4%E4%BB%98%E7%AE%A1%E7%90%86\" >2\u3001Azure DevOps\uff1a\u5fae\u8f6f\u6280\u672f\u4f53\u7cfb\u4e0b\u7684\u9700\u6c42\u4e0e\u5de5\u7a0b\u4ea4\u4ed8\u7ba1\u7406<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#3%E3%80%81%E7%8C%AA%E9%BD%BF%E9%B1%BCChoerodon%EF%BC%9A%E8%BF%9E%E6%8E%A5%E9%9C%80%E6%B1%82%E7%AE%A1%E7%90%86%E3%80%81%E6%95%8F%E6%8D%B7%E9%A1%B9%E7%9B%AE%E4%B8%8E_DevOps_%E5%B7%A5%E5%85%B7%E9%93%BE\" >3\u3001\u732a\u9f7f\u9c7cChoerodon\uff1a\u8fde\u63a5\u9700\u6c42\u7ba1\u7406\u3001\u654f\u6377\u9879\u76ee\u4e0e DevOps \u5de5\u5177\u94fe<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#4%E3%80%81%E4%BA%8B%E4%BA%95%E7%84%B6%EF%BC%9A%E9%A1%B9%E7%9B%AE%E5%85%A8%E8%BF%87%E7%A8%8B%E4%B8%8E%E4%BC%81%E4%B8%9A%E7%BA%A7%E9%A1%B9%E7%9B%AE%E6%B2%BB%E7%90%86\" >4\u3001\u4e8b\u4e95\u7136\uff1a\u9879\u76ee\u5168\u8fc7\u7a0b\u4e0e\u4f01\u4e1a\u7ea7\u9879\u76ee\u6cbb\u7406<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#5%E3%80%81YouTrack%EF%BC%9A%E4%BB%A5%E5%B7%A5%E4%BD%9C%E9%A1%B9%E5%92%8C%E6%95%8F%E6%8D%B7%E7%9C%8B%E6%9D%BF%E4%B8%BA%E6%A0%B8%E5%BF%83%E7%9A%84%E9%9C%80%E6%B1%82%E8%B7%9F%E8%B8%AA\" >5\u3001YouTrack\uff1a\u4ee5\u5de5\u4f5c\u9879\u548c\u654f\u6377\u770b\u677f\u4e3a\u6838\u5fc3\u7684\u9700\u6c42\u8ddf\u8e2a<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#6%E3%80%81GitHub_Projects%EF%BC%9A%E4%BB%A3%E7%A0%81%E4%BB%93%E5%BA%93%E9%A9%B1%E5%8A%A8%E5%9B%A2%E9%98%9F%E7%9A%84%E8%BD%BB%E9%87%8F%E9%9C%80%E6%B1%82%E8%B7%9F%E8%B8%AA\" >6\u3001GitHub Projects\uff1a\u4ee3\u7801\u4ed3\u5e93\u9a71\u52a8\u56e2\u961f\u7684\u8f7b\u91cf\u9700\u6c42\u8ddf\u8e2a<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#7%E3%80%81CODING_DevOps%EF%BC%9A%E8%A6%86%E7%9B%96%E9%9C%80%E6%B1%82%E3%80%81%E9%A1%B9%E7%9B%AE%E5%8D%8F%E5%90%8C%E4%B8%8E%E6%8C%81%E7%BB%AD%E4%BA%A4%E4%BB%98%E7%9A%84%E7%A0%94%E5%8F%91%E5%B9%B3%E5%8F%B0\" >7\u3001CODING DevOps\uff1a\u8986\u76d6\u9700\u6c42\u3001\u9879\u76ee\u534f\u540c\u4e0e\u6301\u7eed\u4ea4\u4ed8\u7684\u7814\u53d1\u5e73\u53f0<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#8%E3%80%81Basecamp%EF%BC%9A%E8%BD%BB%E9%87%8F%E9%9C%80%E6%B1%82%E6%B2%9F%E9%80%9A%E4%B8%8E%E5%AE%A2%E6%88%B7%E9%A1%B9%E7%9B%AE%E5%8D%8F%E4%BD%9C\" >8\u3001Basecamp\uff1a\u8f7b\u91cf\u9700\u6c42\u6c9f\u901a\u4e0e\u5ba2\u6237\u9879\u76ee\u534f\u4f5c<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#9%E3%80%81Leangoo%E9%A2%86%E6%AD%8C%EF%BC%9A%E4%BB%A5%E6%95%8F%E6%8D%B7%E7%9C%8B%E6%9D%BF%E8%BF%9E%E6%8E%A5%E9%9C%80%E6%B1%82%E4%B8%8E%E9%A1%B9%E7%9B%AE%E6%89%A7%E8%A1%8C\" >9\u3001Leangoo\u9886\u6b4c\uff1a\u4ee5\u654f\u6377\u770b\u677f\u8fde\u63a5\u9700\u6c42\u4e0e\u9879\u76ee\u6267\u884c<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#%E4%B8%89%E3%80%819%E6%AC%BE%E5%B9%B3%E5%8F%B0%E6%A0%B8%E5%BF%83%E7%89%B9%E6%80%A7%E5%AF%B9%E6%AF%94\" >\u4e09\u30019\u6b3e\u5e73\u53f0\u6838\u5fc3\u7279\u6027\u5bf9\u6bd4<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#%E5%9B%9B%E3%80%81%E4%B8%8D%E5%90%8C%E4%BC%81%E4%B8%9A%E5%A6%82%E4%BD%95%E9%80%89%E6%8B%A9%E9%80%82%E5%90%88%E7%9A%84%E5%B9%B3%E5%8F%B0\" >\u56db\u3001\u4e0d\u540c\u4f01\u4e1a\u5982\u4f55\u9009\u62e9\u9002\u5408\u7684\u5e73\u53f0<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#1_%E9%9C%80%E8%B4%AF%E9%80%9A%E4%BA%A7%E5%93%81%E3%80%81%E7%A0%94%E5%8F%91%E3%80%81%E6%B5%8B%E8%AF%95%E4%B8%8E%E5%8F%91%E5%B8%83\" >1. \u9700\u8d2f\u901a\u4ea7\u54c1\u3001\u7814\u53d1\u3001\u6d4b\u8bd5\u4e0e\u53d1\u5e03<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#2_%E9%9C%80%E6%B1%82%E4%B8%BB%E8%A6%81%E6%9D%A5%E8%87%AA%E5%A4%9A%E4%B8%AA%E4%B8%9A%E5%8A%A1%E9%83%A8%E9%97%A8\" >2. \u9700\u6c42\u4e3b\u8981\u6765\u81ea\u591a\u4e2a\u4e1a\u52a1\u90e8\u95e8<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#3_%E5%9B%A2%E9%98%9F%E4%BB%A5%E4%BB%A3%E7%A0%81%E4%BB%93%E5%BA%93%E4%B8%BA%E4%B8%BB%E8%A6%81%E5%8D%8F%E4%BD%9C%E5%85%A5%E5%8F%A3\" >3. \u56e2\u961f\u4ee5\u4ee3\u7801\u4ed3\u5e93\u4e3a\u4e3b\u8981\u534f\u4f5c\u5165\u53e3<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#4_%E5%9B%A2%E9%98%9F%E5%88%9A%E5%BC%80%E5%A7%8B%E8%90%BD%E5%9C%B0%E6%95%8F%E6%8D%B7%E7%AE%A1%E7%90%86\" >4. \u56e2\u961f\u521a\u5f00\u59cb\u843d\u5730\u654f\u6377\u7ba1\u7406<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#5_%E7%AE%80%E5%8D%95%E9%A1%B9%E7%9B%AE%E4%B8%8D%E4%B8%80%E5%AE%9A%E9%9C%80%E8%A6%81%E5%A4%8D%E6%9D%82%E5%B9%B3%E5%8F%B0\" >5. \u7b80\u5355\u9879\u76ee\u4e0d\u4e00\u5b9a\u9700\u8981\u590d\u6742\u5e73\u53f0<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#6_SaaS_%E4%B8%8E%E7%A7%81%E6%9C%89%E5%8C%96%E9%83%A8%E7%BD%B2%E7%9A%84%E9%80%89%E6%8B%A9\" >6. SaaS \u4e0e\u79c1\u6709\u5316\u90e8\u7f72\u7684\u9009\u62e9<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#%E4%BA%94%E3%80%81%E7%BB%93%E8%AF%AD\" >\u4e94\u3001\u7ed3\u8bed<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#%E5%B8%B8%E8%A7%81%E9%97%AE%E9%A2%98%EF%BC%88FAQ%EF%BC%89\" >\u5e38\u89c1\u95ee\u9898\uff08FAQ\uff09<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#Q1%EF%BC%9A%E9%9C%80%E6%B1%82%E7%AE%A1%E7%90%86%E4%B8%8E%E9%A1%B9%E7%9B%AE%E7%AE%A1%E7%90%86%E4%B8%80%E4%BD%93%E5%8C%96%E5%B9%B3%E5%8F%B0%E4%B8%8E%E4%BC%A0%E7%BB%9F%E9%A1%B9%E7%9B%AE%E5%B7%A5%E5%85%B7%E6%9C%89%E4%BD%95%E6%9C%AC%E8%B4%A8%E5%8C%BA%E5%88%AB%EF%BC%9F\" >Q1\uff1a\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\u4e0e\u4f20\u7edf\u9879\u76ee\u5de5\u5177\u6709\u4f55\u672c\u8d28\u533a\u522b\uff1f<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#Q2%EF%BC%9A%E4%B8%AD%E5%B0%8F%E5%9E%8B%E5%9B%A2%E9%98%9F%E6%98%AF%E5%90%A6%E9%80%82%E5%90%88%E7%9B%B4%E6%8E%A5%E9%87%87%E7%94%A8%E4%BC%81%E4%B8%9A%E7%BA%A7%E4%B8%80%E4%BD%93%E5%8C%96%E5%B9%B3%E5%8F%B0%EF%BC%9F\" >Q2\uff1a\u4e2d\u5c0f\u578b\u56e2\u961f\u662f\u5426\u9002\u5408\u76f4\u63a5\u91c7\u7528\u4f01\u4e1a\u7ea7\u4e00\u4f53\u5316\u5e73\u53f0\uff1f<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-29\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#Q3%EF%BC%9A%E5%A6%82%E4%BD%95%E9%AA%8C%E8%AF%81%E5%B9%B3%E5%8F%B0%E6%98%AF%E5%90%A6%E7%9C%9F%E6%AD%A3%E5%AE%9E%E7%8E%B0%E4%BA%86%22%E4%B8%80%E4%BD%93%E5%8C%96%22%E8%80%8C%E9%9D%9E%E8%A1%A8%E9%9D%A2%E6%95%B4%E5%90%88%EF%BC%9F\" >Q3\uff1a\u5982\u4f55\u9a8c\u8bc1\u5e73\u53f0\u662f\u5426\u771f\u6b63\u5b9e\u73b0\u4e86&quot;\u4e00\u4f53\u5316&quot;\u800c\u975e\u8868\u9762\u6574\u5408\uff1f<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-30\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\/#Q4%EF%BC%9A%E7%A7%81%E6%9C%89%E5%8C%96%E9%83%A8%E7%BD%B2%E6%98%AF%E5%90%A6%E6%84%8F%E5%91%B3%E7%9D%80%E6%9B%B4%E9%AB%98%E7%9A%84%E6%95%B0%E6%8D%AE%E5%AE%89%E5%85%A8%E6%80%A7%EF%BC%9F\" >Q4\uff1a\u79c1\u6709\u5316\u90e8\u7f72\u662f\u5426\u610f\u5473\u7740\u66f4\u9ad8\u7684\u6570\u636e\u5b89\u5168\u6027\uff1f<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"%E4%B8%80%E3%80%81%E8%AF%84%E4%BC%B0%E4%B8%80%E4%BD%93%E5%8C%96%E5%B9%B3%E5%8F%B0%E9%9C%80%E5%85%B3%E6%B3%A8%E7%9A%84%E4%BA%94%E9%A1%B9%E6%A0%B8%E5%BF%83%E8%83%BD%E5%8A%9B\"><\/span>\u4e00\u3001\u8bc4\u4f30\u4e00\u4f53\u5316\u5e73\u53f0\u9700\u5173\u6ce8\u7684\u4e94\u9879\u6838\u5fc3\u80fd\u529b<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u5e76\u975e\u540c\u4e00\u8303\u7574\u3002\u524d\u8005\u805a\u7126&quot;\u4e3a\u4f55\u505a\u3001\u505a\u4ec0\u4e48\u3001\u4ef7\u503c\u51e0\u4f55\u3001\u8c01\u6765\u9a8c\u6536&quot;\uff1b\u540e\u8005\u89e3\u51b3&quot;\u4f55\u65f6\u505a\u3001\u8c01\u6267\u884c\u3001\u8d44\u6e90\u51e0\u4f55\u3001\u80fd\u5426\u6309\u671f\u4ea4\u4ed8&quot;\u3002\u771f\u6b63\u7684\u4e00\u4f53\u5316\uff0c\u5e76\u975e\u7b80\u5355\u5c06\u9700\u6c42\u5217\u8868\u4e0e\u4efb\u52a1\u770b\u677f\u7f6e\u4e8e\u540c\u4e00\u754c\u9762\uff0c\u800c\u662f\u8ba9\u9700\u6c42\u4ece\u6536\u96c6\u3001\u5206\u6790\u3001\u8bc4\u5ba1\u8d77\uff0c\u6301\u7eed\u5173\u8054\u9879\u76ee\u3001\u8fed\u4ee3\u3001\u4efb\u52a1\u3001\u6d4b\u8bd5\u3001\u7f3a\u9677\u3001\u7248\u672c\u53ca\u6700\u7ec8\u4ea4\u4ed8\u7ed3\u679c\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"1_%E7%BB%9F%E4%B8%80%E9%9C%80%E6%B1%82%E5%85%A5%E5%8F%A3%E7%9A%84%E5%BB%BA%E7%AB%8B\"><\/span>1. \u7edf\u4e00\u9700\u6c42\u5165\u53e3\u7684\u5efa\u7acb<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u4f01\u4e1a\u9700\u6c42\u6765\u6e90\u591a\u5143\u2014\u2014\u5ba2\u6237\u3001\u9500\u552e\u3001\u5ba2\u670d\u3001\u8fd0\u8425\u3001\u4ea7\u54c1\u56e2\u961f\u3001\u7ba1\u7406\u5c42\u53ca\u5185\u90e8\u5458\u5de5\u3002\u82e5\u9700\u6c42\u957f\u671f\u6563\u843d\u804a\u5929\u8bb0\u5f55\u3001\u90ae\u4ef6\u3001\u8868\u683c\u4e0e\u4f1a\u8bae\u7eaa\u8981\u4e2d\uff0c\u540e\u7eed\u96be\u4ee5\u8ffd\u6eaf\u6765\u6e90\u3001\u80cc\u666f\u4e0e\u5386\u53f2\u51b3\u7b56\u3002\u5408\u683c\u7684\u5e73\u53f0\u5e94\u652f\u6301\u5efa\u7acb\u7edf\u4e00<strong>\u9700\u6c42\u6c60<\/strong>\uff0c\u8bb0\u5f55\u63d0\u51fa\u4eba\u3001\u6765\u6e90\u3001\u6240\u5c5e\u4ea7\u54c1\u3001\u5f71\u54cd\u8303\u56f4\u3001\u4e1a\u52a1\u4ef7\u503c\u3001\u7d27\u6025\u7a0b\u5ea6\u4e0e\u9a8c\u6536\u6807\u51c6\uff0c\u5e76\u652f\u6301\u91cd\u590d\u3001\u6a21\u7cca\u6216\u6682\u4e0d\u5177\u5907\u6267\u884c\u6761\u4ef6\u9700\u6c42\u7684\u5408\u5e76\u3001\u8865\u5145\u3001\u5206\u7c7b\u4e0e\u5f52\u6863\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_%E8%AF%84%E5%AE%A1%E5%88%B0%E6%89%A7%E8%A1%8C%E7%9A%84%E6%97%A0%E7%BC%9D%E8%A1%94%E6%8E%A5\"><\/span>2. \u8bc4\u5ba1\u5230\u6267\u884c\u7684\u65e0\u7f1d\u8854\u63a5<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u9700\u6c42\u901a\u8fc7\u8bc4\u5ba1\u540e\uff0c\u4e0d\u5e94\u518d\u7531\u9879\u76ee\u7ecf\u7406\u624b\u52a8\u8fc1\u79fb\u81f3\u53e6\u4e00\u7cfb\u7edf\u3002\u66f4\u4f18\u8def\u5f84\u662f\u5c06\u9700\u6c42\u76f4\u63a5\u5206\u53d1\u81f3\u5177\u4f53\u9879\u76ee\u3001\u7248\u672c\u6216\u8fed\u4ee3\uff0c\u5e76\u7ee7\u7eed\u62c6\u89e3\u4e3a\u7528\u6237\u6545\u4e8b\u3001\u4efb\u52a1\u3001\u7f3a\u9677\u6216\u4ea4\u4ed8\u4e8b\u9879\u3002\u4ea7\u54c1\u7ecf\u7406\u8c03\u6574\u8303\u56f4\u4e0e\u4f18\u5148\u7ea7\u540e\uff0c\u9879\u76ee\u8d1f\u8d23\u4eba\u5e94\u5b9e\u65f6\u611f\u77e5\u53d8\u5316\u3002\u5224\u65ad\u7cfb\u7edf\u662f\u5426\u771f\u6b63\u4e00\u4f53\u5316\u7684\u7b80\u6613\u6807\u51c6\uff1a\u4ece\u539f\u59cb\u9700\u6c42\u9875\u9762\u51fa\u53d1\uff0c\u80fd\u5426\u76f4\u63a5\u67e5\u770b\u5bf9\u5e94\u9879\u76ee\u3001\u8d1f\u8d23\u4eba\u3001\u8ba1\u5212\u65f6\u95f4\u3001\u4efb\u52a1\u8fdb\u5ea6\u3001\u6d4b\u8bd5\u7ed3\u679c\u4e0e\u53d1\u5e03\u72b6\u6001\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_%E5%AF%B9%E5%AE%9E%E9%99%85%E9%A1%B9%E7%9B%AE%E7%AE%A1%E7%90%86%E6%96%B9%E5%BC%8F%E7%9A%84%E6%94%AF%E6%92%91\"><\/span>3. \u5bf9\u5b9e\u9645\u9879\u76ee\u7ba1\u7406\u65b9\u5f0f\u7684\u652f\u6491<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u4e0d\u540c\u56e2\u961f\u5bf9\u9879\u76ee\u7ba1\u7406\u7684\u8981\u6c42\u5dee\u5f02\u663e\u8457\u3002\u4e92\u8054\u7f51\u4ea7\u54c1\u56e2\u961f\u504f\u597dScrum\u3001\u770b\u677f\u4e0e\u77ed\u5468\u671f\u8fed\u4ee3\uff1b\u8f6f\u786c\u4ef6\u7ed3\u5408\u3001\u6c7d\u8f66\u7535\u5b50\u53ca\u5236\u9020\u7814\u53d1\u53ef\u80fd\u540c\u65f6\u4f7f\u7528\u9636\u6bb5\u95e8\u3001\u7011\u5e03\u4e0e\u654f\u6377\u65b9\u6cd5\uff1b\u54a8\u8be2\u3001\u5de5\u7a0b\u4e0e\u4ea4\u4ed8\u578b\u4f01\u4e1a\u5219\u66f4\u5173\u6ce8\u7acb\u9879\u3001\u5408\u540c\u3001\u9884\u7b97\u3001\u6210\u672c\u3001\u91cc\u7a0b\u7891\u4e0e\u9a8c\u6536\u3002\u9009\u578b\u65f6\u4e0d\u5e94\u4ec5\u5224\u65ad&quot;\u6709\u65e0\u770b\u677f&quot;\uff0c\u800c\u9700\u9a8c\u8bc1\u662f\u5426\u652f\u6301\u5f53\u524d\u6d41\u7a0b\uff0c\u80fd\u5426\u5904\u7406\u4efb\u52a1\u4f9d\u8d56\u3001\u91cc\u7a0b\u7891\u3001<strong>\u9879\u76ee\u96c6<\/strong>\u3001\u57fa\u7ebf\u3001\u8d44\u6e90\u5bb9\u91cf\u4e0e\u8de8\u56e2\u961f\u534f\u4f5c\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_%E9%9C%80%E6%B1%82%E5%8F%98%E6%9B%B4%E7%9A%84%E5%AE%8C%E6%95%B4%E8%BF%BD%E6%BA%AF\"><\/span>3. \u9700\u6c42\u53d8\u66f4\u7684\u5b8c\u6574\u8ffd\u6eaf<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u9879\u76ee\u5ef6\u671f\u5f80\u5f80\u4e0d\u4ec5\u662f\u6267\u884c\u6548\u7387\u95ee\u9898\uff0c\u4e5f\u53ef\u80fd\u6e90\u4e8e\u9700\u6c42\u8303\u56f4\u5728\u6267\u884c\u8fc7\u7a0b\u4e2d\u7684\u6301\u7eed\u53d8\u52a8\u3002\u4e00\u4f53\u5316\u5e73\u53f0\u5e94\u4fdd\u7559\u9700\u6c42\u7248\u672c\u3001\u72b6\u6001\u53d8\u5316\u3001\u8bc4\u5ba1\u610f\u89c1\u4e0e\u64cd\u4f5c\u8bb0\u5f55\uff0c\u5e76\u5728\u53d8\u66f4\u540e\u8bc6\u522b\u53d7\u5f71\u54cd\u7684\u4efb\u52a1\u3001\u6d4b\u8bd5\u7528\u4f8b\u3001\u7248\u672c\u3001\u4ea4\u4ed8\u65f6\u95f4\u4e0e\u9879\u76ee\u6210\u672c\u3002\u82e5\u7cfb\u7edf\u4ec5\u8986\u76d6\u9700\u6c42\u63d0\u51fa\u4e0e\u4efb\u52a1\u5b8c\u6210\uff0c\u65e0\u6cd5\u8bb0\u5f55\u4e2d\u95f4\u53d8\u66f4\u8fc7\u7a0b\uff0c\u7ba1\u7406\u8005\u4ecd\u96be\u5224\u65ad\u5ef6\u671f\u6216\u8fd4\u5de5\u7684\u5177\u4f53\u6839\u56e0\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"5_%E9%83%A8%E7%BD%B2%E3%80%81%E6%9D%83%E9%99%90%E4%B8%8E%E7%B3%BB%E7%BB%9F%E6%B2%BB%E7%90%86%E7%9A%84%E5%8C%B9%E9%85%8D%E5%BA%A6\"><\/span>5. \u90e8\u7f72\u3001\u6743\u9650\u4e0e\u7cfb\u7edf\u6cbb\u7406\u7684\u5339\u914d\u5ea6<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u4e2d\u5927\u578b\u4f01\u4e1a\u8fd8\u9700\u5173\u6ce8\u7ec4\u7ec7\u67b6\u6784\u540c\u6b65\u3001\u89d2\u8272\u6743\u9650\u3001\u5355\u70b9\u767b\u5f55\u3001\u64cd\u4f5c\u65e5\u5fd7\u3001\u6570\u636e\u5bfc\u51fa\u3001\u5f00\u653e\u63a5\u53e3\u4e0e\u90e8\u7f72\u6a21\u5f0f\u3002\u81ea\u5b9a\u4e49\u80fd\u529b\u5e76\u975e\u8d8a\u591a\u8d8a\u597d\u2014\u2014\u5de5\u4f5c\u9879\u3001\u5b57\u6bb5\u3001\u72b6\u6001\u4e0e\u6d41\u7a0b\u8fc7\u5ea6\u81ea\u7531\uff0c\u53ef\u80fd\u5bfc\u81f4\u4e0d\u540c\u90e8\u95e8\u5404\u81ea\u5efa\u7acb\u7edf\u8ba1\u53e3\u5f84\u3002\u4e0a\u7ebf\u524d\u5e94\u5148\u7edf\u4e00\u9700\u6c42\u7c7b\u578b\u3001\u4f18\u5148\u7ea7\u6807\u51c6\u3001\u72b6\u6001\u5b9a\u4e49\u4e0e\u5f52\u6863\u89c4\u5219\uff0c\u518d\u51b3\u5b9a\u7cfb\u7edf\u914d\u7f6e\u65b9\u5f0f\u3002<\/p>\n<h2><span class=\"ez-toc-section\" id=\"%E4%BA%8C%E3%80%819%E6%AC%BE%E9%9C%80%E6%B1%82%E7%AE%A1%E7%90%86%E4%B8%8E%E9%A1%B9%E7%9B%AE%E7%AE%A1%E7%90%86%E4%B8%80%E4%BD%93%E5%8C%96%E5%B9%B3%E5%8F%B0%E8%AF%A6%E8%A7%A3\"><\/span>\u4e8c\u30019\u6b3e\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\u8be6\u89e3<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"1%E3%80%81ONES%EF%BC%9A%E9%9D%A2%E5%90%91%E4%B8%AD%E5%A4%A7%E5%9E%8B%E7%BB%84%E7%BB%87%E7%9A%84%E4%B8%80%E4%BD%93%E5%8C%96%E7%A0%94%E5%8F%91%E7%AE%A1%E7%90%86%E5%B9%B3%E5%8F%B0\"><\/span>1\u3001ONES\uff1a\u9762\u5411\u4e2d\u5927\u578b\u7ec4\u7ec7\u7684\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><a href=\"https:\/\/ones.cn\/\">ONES<\/a> \u662f\u4f01\u4e1a\u7ea7\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\uff0c\u6838\u5fc3\u5b9a\u4f4d\u5728\u4e8e\u4ee5\u4e00\u4f53\u5316\u67b6\u6784\u8986\u76d6\u9879\u76ee\u7ba1\u7406\u3001\u9700\u6c42\u7ba1\u7406\u3001\u77e5\u8bc6\u5e93\u3001\u6d4b\u8bd5\u7ba1\u7406\u3001\u6d41\u6c34\u7ebf\u4e0e\u4ee3\u7801\u7ba1\u7406\uff0c\u51cf\u5c11\u5de5\u5177\u5272\u88c2\u5e26\u6765\u7684\u534f\u4f5c\u635f\u8017\u3002\u5176\u8bbe\u8ba1\u9762\u5411\u4e2d\u5927\u578b\u7ec4\u7ec7\uff0c\u652f\u6301\u590d\u6742\u6d41\u7a0b\u914d\u7f6e\u3001\u7cbe\u7ec6\u5316\u6743\u9650\u6a21\u578b\u4e0e\u8de8\u56e2\u961f\u534f\u4f5c\u6cbb\u7406\uff0c\u5e76\u5f3a\u8c03\u4ee5\u7814\u53d1\u6548\u80fd\u5ea6\u91cf\u9a71\u52a8\u4ea4\u4ed8\u8d28\u91cf\u4e0e\u6548\u7387\u7684\u6301\u7eed\u6539\u8fdb\u3002<\/p>\n<p><strong>\u6838\u5fc3\u80fd\u529b\uff1a<\/strong><\/p>\n<p>ONES \u7684\u9700\u6c42\u7ba1\u7406\u6a21\u5757\u652f\u6301\u4ece\u591a\u6e20\u9053\u6536\u96c6\u539f\u59cb\u8bc9\u6c42\uff0c\u7ecf\u6e05\u6d17\u3001\u5206\u6790\u3001\u8bc4\u5ba1\u4e0e\u4f18\u5148\u7ea7\u5224\u5b9a\u540e\u8fdb\u5165\u7edf\u4e00\u9700\u6c42\u6c60\u3002\u8bc4\u5ba1\u901a\u8fc7\u7684\u9700\u6c42\u53ef\u76f4\u63a5\u5206\u53d1\u81f3\u9879\u76ee\u7ba1\u7406\u6a21\u5757\uff0c\u6309\u53f2\u8bd7\u3001\u7279\u6027\u3001\u7528\u6237\u6545\u4e8b\u3001\u4efb\u52a1\u3001\u7f3a\u9677\u7b49\u5c42\u7ea7\u7ee7\u7eed\u62c6\u89e3\u3002\u9879\u76ee\u6267\u884c\u5c42\u9762\u517c\u5bb9\u654f\u6377\u3001\u770b\u677f\u3001\u7011\u5e03\u53ca\u6df7\u5408\u7ba1\u7406\u6a21\u5f0f\uff0c\u63d0\u4f9b\u8fed\u4ee3\u89c4\u5212\u3001\u7518\u7279\u56fe\u3001\u91cc\u7a0b\u7891\u3001\u4efb\u52a1\u4f9d\u8d56\u3001<strong>\u9879\u76ee\u57fa\u7ebf<\/strong>\u3001\u7248\u672c\u53d1\u5e03\u3001\u9879\u76ee\u96c6\u3001\u8d44\u6e90\u5bb9\u91cf\u4e0e<strong>\u5de5\u65f6\u7ba1\u7406<\/strong>\u3002<\/p>\n<p>\u9700\u6c42\u53ef\u8fdb\u4e00\u6b65\u5173\u8054\u6d4b\u8bd5\u7528\u4f8b\u3001\u6d4b\u8bd5\u8ba1\u5212\u4e0e\u7f3a\u9677\uff0c\u5b9e\u73b0\u4ece\u539f\u59cb\u9700\u6c42\u5230\u7814\u53d1\u6267\u884c\u3001\u8d28\u91cf\u9a8c\u8bc1\u4e0e\u7248\u672c\u4ea4\u4ed8\u7684\u5b8c\u6574\u8ffd\u8e2a\u3002\u6548\u80fd\u5ea6\u91cf\u6a21\u5757\u5219\u901a\u8fc7\u591a\u7ef4\u5ea6\u6570\u636e\u770b\u677f\uff0c\u5e2e\u52a9\u7ba1\u7406\u8005\u8bc6\u522b\u74f6\u9888\u3001\u8bc4\u4f30\u56e2\u961f\u4ea7\u80fd\u4e0e\u9884\u6d4b\u4ea4\u4ed8\u98ce\u9669\u3002<\/p>\n<p><strong>\u9002\u7528\u573a\u666f\uff1a<\/strong><\/p>\n<p>\u9002\u5408\u4e2d\u5927\u578b\u7814\u53d1\u56e2\u961f\u3001\u591a\u4ea7\u54c1\u7ebf\u7ec4\u7ec7\uff0c\u4ee5\u53ca\u9700\u8981\u4ea7\u54c1\u3001\u7814\u53d1\u3001\u6d4b\u8bd5\u4e0e\u9879\u76ee\u8d1f\u8d23\u4eba\u5171\u7528\u540c\u4e00\u5e73\u53f0\u7684\u4f01\u4e1a\u3002\u82e5\u4f01\u4e1a\u540c\u65f6\u5b58\u5728\u654f\u6377\u3001\u7011\u5e03\u4e0e\u770b\u677f\u9879\u76ee\uff0c\u6216\u591a\u4e2a\u56e2\u961f\u9700\u56f4\u7ed5\u540c\u4e00\u4ea7\u54c1\u8def\u7ebf\u56fe\u63a8\u8fdb\u4e0d\u540c\u7248\u672c\uff0cONES \u7684\u591a\u7ea7\u9700\u6c42\u3001\u9879\u76ee\u96c6\u4e0e\u8de8\u6a21\u5757\u5173\u8054\u5177\u5907\u663e\u8457\u5b9e\u7528\u4ef7\u503c\u3002\u540c\u65f6\u9002\u914d\u5bf9\u79c1\u6709\u5316\u90e8\u7f72\u3001\u56fd\u4ea7\u5316\u9002\u914d\u53ca\u4ece\u6d77\u5916\u5de5\u5177\u8fc1\u79fb\u6709\u8981\u6c42\u7684\u4f01\u4e1a\u3002<\/p>\n<p><strong>\u4f18\u52bf\u4eae\u70b9\uff1a<\/strong><\/p>\n<p>ONES \u7684\u5dee\u5f02\u6027\u4f53\u73b0\u5728\u9700\u6c42\u5230\u4ea4\u4ed8\u94fe\u8def\u7684\u5b8c\u6574\u5ea6\u3002\u7ba1\u7406\u8005\u4e0d\u4ec5\u80fd\u67e5\u770b\u4efb\u52a1\u5b8c\u6210\u91cf\uff0c\u66f4\u53ef\u8ffd\u8e2a\u5173\u952e\u9700\u6c42\u662f\u5426\u5b8c\u6210\u5f00\u53d1\u3001\u6d4b\u8bd5\u4e0e\u7248\u672c\u4ea4\u4ed8\u3002\u5404\u6a21\u5757\u53ef\u6309\u4f01\u4e1a\u9700\u8981\u7ec4\u5408\u542f\u7528\uff0c\u65e0\u9700\u4e0a\u7ebf\u521d\u671f\u5373\u5168\u91cf\u90e8\u7f72\u3002\u8de8\u56e2\u961f\u534f\u4f5c\u6cbb\u7406\u4e0e\u6570\u636e\u9a71\u52a8\u6539\u8fdb\u7684\u80fd\u529b\uff0c\u4f7f\u5176\u5728\u7ec4\u7ec7\u7ea7\u7814\u53d1\u7ba1\u7406\u4e2d\u5177\u5907\u8f83\u5f3a\u7ade\u4e89\u529b\u3002<\/p>\n<p><strong>\u9002\u7528\u8fb9\u754c\uff1a<\/strong><\/p>\n<p>\u82e5\u56e2\u961f\u89c4\u6a21\u8f83\u5c0f\u3001\u6708\u5ea6\u9700\u6c42\u6570\u91cf\u6709\u9650\uff0c\u4ea7\u54c1\u7ecf\u7406\u4e0e\u5f00\u53d1\u4eba\u5458\u53ef\u76f4\u63a5\u6c9f\u901a\uff0c\u5b8c\u6574\u7684\u9700\u6c42\u5206\u5c42\u3001\u6d4b\u8bd5\u7ba1\u7406\u4e0e\u9879\u76ee\u96c6\u80fd\u529b\u53ef\u80fd\u8d85\u51fa\u5b9e\u9645\u9700\u8981\u3002\u5bf9\u4e8e\u5e02\u573a\u6d3b\u52a8\u3001\u884c\u653f\u4e8b\u52a1\u6216\u7b80\u5355\u5ba2\u6237\u4ea4\u4ed8\u7b49\u975e\u7814\u53d1\u9879\u76ee\uff0c\u901a\u7528\u534f\u4f5c\u5e73\u53f0\u901a\u5e38\u66f4\u6613\u4e0a\u624b\u3002\u91c7\u8d2d\u524d\u5efa\u8bae\u901a\u8fc7\u771f\u5b9e\u9879\u76ee\u9a8c\u8bc1\u5b57\u6bb5\u914d\u7f6e\u3001\u6743\u9650\u6a21\u578b\u3001\u5386\u53f2\u6570\u636e\u8fc1\u79fb\u3001\u7b2c\u4e09\u65b9\u96c6\u6210\u4e0e\u5b9e\u65bd\u5de5\u4f5c\u91cf\u3002<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/04f5ddf81ca3_ONES-\u4ea7\u54c1\u5168\u666f\u56fe.png\" alt=\"\u9700\u6c42\u7ba1\u7406 \u9879\u76ee\u7ba1\u7406 \u4e00\u4f53\u5316\u5e73\u53f0 ONES \u4ea7\u54c1\u5168\u666f\u56fe\" width=\"2612\" height=\"1336\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"2%E3%80%81Azure_DevOps%EF%BC%9A%E5%BE%AE%E8%BD%AF%E6%8A%80%E6%9C%AF%E4%BD%93%E7%B3%BB%E4%B8%8B%E7%9A%84%E9%9C%80%E6%B1%82%E4%B8%8E%E5%B7%A5%E7%A8%8B%E4%BA%A4%E4%BB%98%E7%AE%A1%E7%90%86\"><\/span>2\u3001Azure DevOps\uff1a\u5fae\u8f6f\u6280\u672f\u4f53\u7cfb\u4e0b\u7684\u9700\u6c42\u4e0e\u5de5\u7a0b\u4ea4\u4ed8\u7ba1\u7406<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Azure DevOps \u662f\u5fae\u8f6f\u63d0\u4f9b\u7684\u7814\u53d1\u534f\u4f5c\u4e0e DevOps \u5e73\u53f0\uff0c\u5176\u4e2d Azure Boards \u8d1f\u8d23\u9700\u6c42\u3001\u5de5\u4f5c\u9879\u4e0e\u9879\u76ee\u8ba1\u5212\u7ba1\u7406\u3002\u9700\u6c42\u53ef\u8868\u793a\u4e3a Epic\u3001Feature\u3001User Story\u3001Product Backlog Item \u6216 Requirement\uff0c\u5e76\u7ee7\u7eed\u62c6\u89e3\u4e3a\u4efb\u52a1\u3001\u6d4b\u8bd5\u4e0e\u7f3a\u9677\u3002\u5df2\u91c7\u7528 Microsoft Azure\u3001Visual Studio \u6216\u5fae\u8f6f\u8d26\u53f7\u4f53\u7cfb\u7684\u4f01\u4e1a\uff0c\u63a5\u5165\u73b0\u6709\u7814\u53d1\u73af\u5883\u7684\u95e8\u69db\u8f83\u4f4e\u3002<\/p>\n<p><strong>\u6838\u5fc3\u80fd\u529b\uff1a<\/strong><\/p>\n<p>Azure Boards \u652f\u6301\u4ea7\u54c1\u5f85\u529e\u5217\u8868\u3001\u7ec4\u5408\u5f85\u529e\u5217\u8868\u3001\u5de5\u4f5c\u9879\u5c42\u7ea7\u3001\u4f18\u5148\u7ea7\u3001\u8fed\u4ee3\u3001\u51b2\u523a\u3001\u4efb\u52a1\u770b\u677f\u3001\u67e5\u8be2\u4e0e\u4eea\u8868\u76d8\u3002\u4e0d\u540c\u8fc7\u7a0b\u6a21\u677f\u53ef\u9009\u7528\u4e0d\u540c\u9700\u6c42\u5de5\u4f5c\u9879\u7c7b\u578b\uff0c\u4f01\u4e1a\u53ef\u6309\u56e2\u961f\u4e0e\u4ea7\u54c1\u7ed3\u6784\u914d\u7f6e\u533a\u57df\u8def\u5f84\u3001\u8fed\u4ee3\u8def\u5f84\u4e0e\u5de5\u4f5c\u9879\u5173\u7cfb\u3002\u5e73\u53f0\u5185\u7684 Azure Repos\u3001Azure Pipelines\u3001Azure Test Plans \u4e0e Azure Artifacts \u53ef\u8fdb\u4e00\u6b65\u8fde\u63a5\u4ee3\u7801\u4ed3\u5e93\u3001\u6784\u5efa\u6d41\u6c34\u7ebf\u3001\u6d4b\u8bd5\u4e0e\u5236\u54c1\uff0c\u4fdd\u6301\u9700\u6c42\u4e0e\u5de5\u7a0b\u4ea4\u4ed8\u6570\u636e\u7684\u5173\u8054\u3002\u63d0\u4f9b Azure DevOps Services \u4e0e Azure DevOps Server \u4e24\u79cd\u5f62\u6001\u3002<\/p>\n<p><strong>\u9002\u7528\u573a\u666f\uff1a<\/strong><\/p>\n<p>\u66f4\u9002\u5408\u5fae\u8f6f\u6280\u672f\u57fa\u7840\u8f83\u5f3a\u3001\u7814\u53d1\u6d41\u7a0b\u76f8\u5bf9\u6210\u719f\uff0c\u5e76\u6709\u4e13\u4eba\u8d1f\u8d23\u5e73\u53f0\u914d\u7f6e\u4e0e\u7ef4\u62a4\u7684\u4e2d\u5927\u578b\u8f6f\u4ef6\u56e2\u961f\u3002\u91c7\u7528 Agile\u3001Scrum \u6216 CMMI \u8fc7\u7a0b\u6a21\u578b\u7684\u4f01\u4e1a\uff0c\u53ef\u901a\u8fc7\u4e0d\u540c\u5de5\u4f5c\u9879\u7c7b\u578b\u7ba1\u7406\u9700\u6c42\u3001\u4efb\u52a1\u3001\u95ee\u9898\u4e0e\u53d8\u66f4\u3002<\/p>\n<p><strong>\u4f18\u52bf\u4eae\u70b9\uff1a<\/strong><\/p>\n<p>\u4ef7\u503c\u4e3b\u8981\u4f53\u73b0\u5728\u5de5\u7a0b\u94fe\u8def\u5b8c\u6574\u6027\u3002\u9700\u6c42\u8fdb\u5165\u5f00\u53d1\u540e\uff0c\u53ef\u7ee7\u7eed\u5173\u8054\u4ee3\u7801\u3001\u62c9\u53d6\u8bf7\u6c42\u3001\u6784\u5efa\u3001\u6d4b\u8bd5\u4e0e\u53d1\u5e03\u6d3b\u52a8\u3002\u5bf9\u4e8e\u5e0c\u671b\u7edf\u4e00\u9879\u76ee\u5de5\u4f5c\u9879\u4e0e CI\/CD \u6d41\u7a0b\u7684\u6280\u672f\u56e2\u961f\uff0c\u80fd\u51cf\u5c11\u9700\u6c42\u7cfb\u7edf\u3001\u4ee3\u7801\u5e73\u53f0\u4e0e\u6d41\u6c34\u7ebf\u4e4b\u95f4\u7684\u6570\u636e\u540c\u6b65\u6210\u672c\u3002<\/p>\n<p><strong>\u9002\u7528\u8fb9\u754c\uff1a<\/strong><\/p>\n<p>\u8fc7\u7a0b\u6a21\u677f\u3001\u5de5\u4f5c\u9879\u3001\u6743\u9650\u3001\u533a\u57df\u8def\u5f84\u4e0e\u8fed\u4ee3\u8def\u5f84\u5177\u6709\u4e00\u5b9a\u914d\u7f6e\u95e8\u69db\uff0c\u7f3a\u5c11\u5e73\u53f0\u7ba1\u7406\u5458\u7684\u5c0f\u56e2\u961f\u53ef\u80fd\u611f\u5230\u7cfb\u7edf\u504f\u91cd\u3002\u56fd\u5185\u4f01\u4e1a\u8fd8\u9700\u8bc4\u4f30\u8bbf\u95ee\u4f53\u9a8c\u3001\u91c7\u8d2d\u65b9\u5f0f\u3001\u672c\u5730\u670d\u52a1\u3001\u6570\u636e\u5b58\u50a8\u4e0e\u5408\u89c4\u8981\u6c42\u3002\u82e5\u9879\u76ee\u4e0d\u6d89\u53ca\u4ee3\u7801\u3001\u6d41\u6c34\u7ebf\u4e0e\u6d4b\u8bd5\uff0c\u90e8\u5206\u5de5\u7a0b\u80fd\u529b\u96be\u4ee5\u5145\u5206\u53d1\u6325\u3002<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/6c6e0ea47749_Azure-DevOps-\u4ea7\u54c1\u56fe.png\" alt=\"\u9700\u6c42\u7ba1\u7406 \u9879\u76ee\u7ba1\u7406 \u4e00\u4f53\u5316\u5e73\u53f0 Azure DevOps \u4ea7\u54c1\u56fe\" width=\"2612\" height=\"1336\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"3%E3%80%81%E7%8C%AA%E9%BD%BF%E9%B1%BCChoerodon%EF%BC%9A%E8%BF%9E%E6%8E%A5%E9%9C%80%E6%B1%82%E7%AE%A1%E7%90%86%E3%80%81%E6%95%8F%E6%8D%B7%E9%A1%B9%E7%9B%AE%E4%B8%8E_DevOps_%E5%B7%A5%E5%85%B7%E9%93%BE\"><\/span>3\u3001\u732a\u9f7f\u9c7cChoerodon\uff1a\u8fde\u63a5\u9700\u6c42\u7ba1\u7406\u3001\u654f\u6377\u9879\u76ee\u4e0e DevOps \u5de5\u5177\u94fe<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u732a\u9f7f\u9c7c Choerodon \u9762\u5411\u8f6f\u4ef6\u7814\u53d1\u4e0e IT \u9879\u76ee\u7ba1\u7406\uff0c\u91cd\u70b9\u8986\u76d6\u9700\u6c42\u7ba1\u7406\u3001\u56e2\u961f\u534f\u4f5c\u3001\u654f\u6377\u7814\u53d1\u4e0e DevOps \u5de5\u7a0b\u6d3b\u52a8\u3002\u9002\u5408\u5e0c\u671b\u5728\u540c\u4e00\u5e73\u53f0\u4e2d\u7ba1\u7406\u9700\u6c42\u3001\u8fed\u4ee3\u3001\u6d4b\u8bd5\u3001\u4ee3\u7801\u4e0e\u90e8\u7f72\u8fc7\u7a0b\uff0c\u540c\u65f6\u6709\u79c1\u6709\u5316\u4e0e\u5de5\u5177\u94fe\u6574\u5408\u9700\u6c42\u7684\u4f01\u4e1a\u3002<\/p>\n<p><strong>\u6838\u5fc3\u80fd\u529b\uff1a<\/strong><\/p>\n<p>\u5546\u4e1a\u4ea7\u54c1\u8986\u76d6\u9700\u6c42\u5168\u751f\u547d\u5468\u671f\u7ba1\u7406\uff0c\u652f\u6301 Scrum\u3001Kanban \u4e0e SAFe \u7b49\u654f\u6377\u6846\u67b6\u3002\u56e2\u961f\u53ef\u56f4\u7ed5\u9700\u6c42\u8fdb\u884c\u4efb\u52a1\u62c6\u89e3\u3001\u8fed\u4ee3\u89c4\u5212\u3001\u8fdb\u5ea6\u8ddf\u8e2a\u4e0e\u6d4b\u8bd5\u7ba1\u7406\uff0c\u518d\u8fde\u63a5\u4ee3\u7801\u3001\u6301\u7eed\u96c6\u6210\u3001\u5236\u54c1\u3001\u90e8\u7f72\u4e0e\u73af\u5883\u8d44\u6e90\u3002\u5bf9\u4e8e\u540c\u65f6\u5b58\u5728\u4f20\u7edf\u8ba1\u5212\u7ba1\u7406\u4e0e\u654f\u6377\u6267\u884c\u7684\u4f01\u4e1a\uff0c\u53ef\u901a\u8fc7\u9879\u76ee\u6a21\u677f\u9002\u914d&quot;\u5927\u7011\u5e03\u3001\u5c0f\u654f\u6377&quot;\u7b49\u6df7\u5408\u573a\u666f\u3002<\/p>\n<p><strong>\u9002\u7528\u573a\u666f\uff1a<\/strong><\/p>\n<p>\u9002\u5408\u5177\u6709 DevOps \u5efa\u8bbe\u9700\u6c42\u3001\u9700\u8981\u6574\u5408\u7814\u53d1\u5de5\u5177\u94fe\uff0c\u6216\u5e0c\u671b\u5728\u672c\u5730\u73af\u5883\u4e2d\u5efa\u8bbe\u7edf\u4e00\u7814\u53d1\u5e73\u53f0\u7684\u4e2d\u5927\u578b\u4f01\u4e1a\u3002\u62e5\u6709\u5e73\u53f0\u5de5\u7a0b\u3001\u5bb9\u5668\u5e73\u53f0\u6216\u5185\u90e8\u7814\u53d1\u57fa\u7840\u8bbe\u65bd\u56e2\u961f\u7684\u7ec4\u7ec7\uff0c\u66f4\u6613\u53d1\u6325\u5176\u4ee3\u7801\u3001\u6d41\u6c34\u7ebf\u3001\u73af\u5883\u4e0e\u5e94\u7528\u90e8\u7f72\u65b9\u9762\u7684\u4ef7\u503c\u3002<\/p>\n<p><strong>\u4f18\u52bf\u4eae\u70b9\uff1a<\/strong><\/p>\n<p>\u5c06\u654f\u6377\u9879\u76ee\u7ba1\u7406\u4e0e DevOps \u8fc7\u7a0b\u7f6e\u4e8e\u540c\u4e00\u5e73\u53f0\u6846\u67b6\u3002\u9700\u6c42\u7ecf\u8bc4\u5ba1\u4e0e\u62c6\u89e3\u540e\uff0c\u53ef\u7ee7\u7eed\u8fdb\u5165\u7814\u53d1\u3001\u6d4b\u8bd5\u4e0e\u90e8\u7f72\u73af\u8282\u3002\u5bf9\u4e8e\u591a\u9879\u76ee\u3001\u591a\u56e2\u961f\u5e76\u884c\u5f00\u53d1\u53ca\u9700\u8981\u89c4\u6a21\u5316\u654f\u6377\u7ba1\u7406\u7684\u4f01\u4e1a\uff0c\u6bd4\u666e\u901a\u4efb\u52a1\u770b\u677f\u63d0\u4f9b\u66f4\u5b8c\u6574\u7684\u7814\u53d1\u7ba1\u7406\u89c6\u89d2\u3002<\/p>\n<p><strong>\u9002\u7528\u8fb9\u754c\uff1a<\/strong><\/p>\n<p>\u9009\u578b\u65f6\u5e94\u660e\u786e\u533a\u5206\u5f00\u6e90\u7248\u672c\u4e0e\u5546\u4e1a\u7248\u672c\u3002Choerodon \u5f00\u6e90\u793e\u533a 2.0 \u7248\u672c\u91cd\u70b9\u63d0\u4f9b\u4ee3\u7801\u7ba1\u7406\u3001\u5236\u54c1\u5e93\u3001CI\/CD\u3001\u5bb9\u5668\u3001\u73af\u5883\u8d44\u6e90\u4e0e\u5e94\u7528\u90e8\u7f72\u7b49\u80fd\u529b\uff0c\u4e0d\u5305\u542b\u9879\u76ee\u7ba1\u7406\u3001\u6d4b\u8bd5\u7ba1\u7406\u4e0e\u77e5\u8bc6\u5e93\u7b49\u6a21\u5757\u3002\u4e0d\u80fd\u4ec5\u51ed&quot;\u5f00\u6e90&quot;\u6807\u7b7e\u5224\u65ad\u6700\u7ec8\u53ef\u83b7\u5f97\u7684\u529f\u80fd\uff0c\u8fd8\u9700\u786e\u8ba4\u5546\u4e1a\u6388\u6743\u3001\u5b9e\u65bd\u670d\u52a1\u3001\u5347\u7ea7\u8def\u7ebf\u3001\u63a5\u53e3\u517c\u5bb9\u4e0e\u540e\u7eed\u8fd0\u7ef4\u8d23\u4efb\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"4%E3%80%81%E4%BA%8B%E4%BA%95%E7%84%B6%EF%BC%9A%E9%A1%B9%E7%9B%AE%E5%85%A8%E8%BF%87%E7%A8%8B%E4%B8%8E%E4%BC%81%E4%B8%9A%E7%BA%A7%E9%A1%B9%E7%9B%AE%E6%B2%BB%E7%90%86\"><\/span>4\u3001\u4e8b\u4e95\u7136\uff1a\u9879\u76ee\u5168\u8fc7\u7a0b\u4e0e\u4f01\u4e1a\u7ea7\u9879\u76ee\u6cbb\u7406<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u4e8b\u4e95\u7136\u504f\u4f01\u4e1a\u7ea7\u9879\u76ee\u5168\u8fc7\u7a0b\u7ba1\u7406\uff0c\u8986\u76d6\u9879\u76ee\u524d\u671f\u7b56\u5212\u3001\u7acb\u9879\u3001\u8ba1\u5212\u7f16\u5236\u3001\u6267\u884c\u53cd\u9988\u3001\u6210\u672c\u7ba1\u63a7\u3001\u4ea4\u4ed8\u7269\u5f52\u6863\u4e0e\u9a8c\u6536\u7ed3\u6848\u3002\u5176\u5165\u9009\u539f\u56e0\u5728\u4e8e\uff1a\u8bb8\u591a\u4f20\u7edf\u4f01\u4e1a\u5e76\u4e0d\u5c06\u9700\u6c42\u5355\u72ec\u4f5c\u4e3a\u4ea7\u54c1\u5f85\u529e\u9879\u7ba1\u7406\uff0c\u800c\u662f\u628a\u5ba2\u6237\u8bc9\u6c42\u3001\u4e1a\u52a1\u7533\u8bf7\u3001\u7814\u53d1\u7acb\u9879\u4e0e\u5185\u90e8\u5efa\u8bbe\u4e8b\u9879\u7eb3\u5165\u9879\u76ee\u524d\u671f\u7b56\u5212\u4e0e\u7acb\u9879\u6d41\u7a0b\uff0c\u518d\u8f6c\u5165\u6b63\u5f0f\u9879\u76ee\u6267\u884c\u3002<\/p>\n<p><strong>\u6838\u5fc3\u80fd\u529b\uff1a<\/strong><\/p>\n<p>\u53ef\u7528\u4e8e\u7ba1\u7406\u9879\u76ee\u7b56\u5212\u3001\u7acb\u9879\u5ba1\u6279\u3001\u9879\u76ee\u8ba1\u5212\u3001\u4efb\u52a1\u534f\u540c\u3001\u8fdb\u5ea6\u53cd\u9988\u3001\u9879\u76ee\u7ec4\u7ec7\u3001\u6210\u672c\u3001\u5408\u540c\u3001\u8fc7\u7a0b\u6587\u4ef6\u3001\u98ce\u9669\u3001\u4ea4\u4ed8\u7269\u4e0e\u7ed3\u9879\u9a8c\u6536\u3002\u5728\u9700\u6c42\u4e0e\u9879\u76ee\u4e00\u4f53\u5316\u573a\u666f\u4e2d\uff0c\u9879\u76ee\u5efa\u8bae\u3001\u5ba2\u6237\u4e8b\u9879\u6216\u7814\u53d1\u7533\u8bf7\u53ef\u4f5c\u4e3a\u524d\u671f\u5165\u53e3\uff0c\u5b8c\u6210\u8bc4\u4f30\u4e0e\u5ba1\u6279\u540e\uff0c\u518d\u8fdb\u5165\u8ba1\u5212\u3001\u6267\u884c\u3001\u6210\u672c\u4e0e\u9a8c\u6536\u9636\u6bb5\u3002\u652f\u6301\u56f4\u7ed5\u9879\u76ee\u5efa\u7acb\u72ec\u7acb\u7ec4\u7ec7\uff0c\u5e76\u5bf9\u9879\u76ee\u6587\u4ef6\u3001\u5355\u636e\u4e0e\u4ea4\u4ed8\u6750\u6599\u96c6\u4e2d\u5f52\u6863\u3002<\/p>\n<p><strong>\u9002\u7528\u573a\u666f\uff1a<\/strong><\/p>\n<p>\u9002\u5408\u5de5\u7a0b\u3001\u54a8\u8be2\u3001\u4e13\u4e1a\u670d\u52a1\u3001\u79d1\u7814\u3001\u4ea7\u54c1\u7814\u53d1\u4e0e\u4f01\u4e1a\u5185\u90e8\u5efa\u8bbe\u9879\u76ee\uff0c\u4e5f\u9002\u5408\u9700\u8981 PMO \u7edf\u4e00\u7ba1\u7406\u7acb\u9879\u3001\u9884\u7b97\u3001\u6210\u672c\u3001\u98ce\u9669\u4e0e\u9a8c\u6536\u7684\u7ec4\u7ec7\u3002\u82e5\u9879\u76ee\u4ef7\u503c\u9700\u540c\u65f6\u4ece\u8fdb\u5ea6\u3001\u6210\u672c\u3001\u5408\u540c\u4e0e\u7ecf\u8425\u7ed3\u679c\u5224\u65ad\uff0c\u5176\u5168\u8fc7\u7a0b\u7ba1\u7406\u65b9\u5f0f\u66f4\u8d34\u8fd1\u4f01\u4e1a\u6cbb\u7406\u9700\u6c42\u3002<\/p>\n<p><strong>\u4f18\u52bf\u4eae\u70b9\uff1a<\/strong><\/p>\n<p>\u5173\u6ce8\u7684\u4e0d\u53ea\u662f\u4efb\u52a1\u662f\u5426\u5b8c\u6210\uff0c\u800c\u662f\u9879\u76ee\u4e3a\u4f55\u6210\u7acb\u3001\u6295\u5165\u591a\u5c11\u8d44\u6e90\u3001\u8fc7\u7a0b\u662f\u5426\u5b58\u5728\u98ce\u9669\u3001\u4ea4\u4ed8\u6210\u679c\u662f\u5426\u5f52\u6863\uff0c\u4ee5\u53ca\u9879\u76ee\u6700\u7ec8\u662f\u5426\u5b8c\u6210\u9a8c\u6536\u4e0e\u7ed3\u7b97\u3002\u5bf9\u4e8e\u9879\u76ee\u578b\u4f01\u4e1a\uff0c\u8fd9\u79cd\u7ba1\u7406\u8303\u56f4\u6bd4\u5355\u7eaf\u770b\u677f\u6216\u4efb\u52a1\u534f\u4f5c\u5de5\u5177\u66f4\u4e3a\u5b8c\u6574\u3002<\/p>\n<p><strong>\u9002\u7528\u8fb9\u754c\uff1a<\/strong><\/p>\n<p>\u5e76\u975e\u4ee5\u8f6f\u4ef6\u4ea7\u54c1\u9700\u6c42\u7ba1\u7406\u4e3a\u6838\u5fc3\u8bbe\u8ba1\u3002\u9700\u8981\u7ba1\u7406\u7528\u6237\u6545\u4e8b\u3001\u4ea7\u54c1\u8def\u7ebf\u56fe\u3001\u6d4b\u8bd5\u8986\u76d6\u3001\u4ee3\u7801\u63d0\u4ea4\u4e0e\u8f6f\u4ef6\u7248\u672c\u53d1\u5e03\u7684\u7814\u53d1\u56e2\u961f\uff0c\u5e94\u91cd\u70b9\u9a8c\u8bc1\u5176\u7814\u53d1\u573a\u666f\u6a21\u677f\u4e0e\u5916\u90e8\u5de5\u5177\u96c6\u6210\u80fd\u529b\u3002\u5b8c\u6574\u7684\u9879\u76ee\u6cbb\u7406\u4f53\u7cfb\u9700\u8981\u4e00\u5b9a\u5b9e\u65bd\u6295\u5165\uff0c\u6d41\u7a0b\u7b80\u5355\u3001\u53c2\u4e0e\u4eba\u5458\u8f83\u5c11\u7684\u56e2\u961f\uff0c\u53ef\u80fd\u65e0\u9700\u540c\u65f6\u542f\u7528\u5408\u540c\u3001\u6210\u672c\u4e0e\u7ecf\u8425\u7ba1\u7406\u80fd\u529b\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"5%E3%80%81YouTrack%EF%BC%9A%E4%BB%A5%E5%B7%A5%E4%BD%9C%E9%A1%B9%E5%92%8C%E6%95%8F%E6%8D%B7%E7%9C%8B%E6%9D%BF%E4%B8%BA%E6%A0%B8%E5%BF%83%E7%9A%84%E9%9C%80%E6%B1%82%E8%B7%9F%E8%B8%AA\"><\/span>5\u3001YouTrack\uff1a\u4ee5\u5de5\u4f5c\u9879\u548c\u654f\u6377\u770b\u677f\u4e3a\u6838\u5fc3\u7684\u9700\u6c42\u8ddf\u8e2a<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>YouTrack \u7531 JetBrains \u63a8\u51fa\uff0c\u5c06\u9700\u6c42\u3001\u7528\u6237\u6545\u4e8b\u3001\u4efb\u52a1\u3001\u95ee\u9898\u4e0e\u7f3a\u9677\u7edf\u4e00\u8868\u793a\u4e3a Issue\uff0c\u518d\u901a\u8fc7\u5b57\u6bb5\u3001\u94fe\u63a5\u5173\u7cfb\u4e0e\u5de5\u4f5c\u6d41\u5efa\u7acb\u9700\u6c42\u5230\u9879\u76ee\u6267\u884c\u7684\u7ed3\u6784\u3002\u9002\u5408\u5e0c\u671b\u4fdd\u7559\u8f83\u9ad8\u81ea\u5b9a\u4e49\u80fd\u529b\uff0c\u53c8\u4e0d\u5e0c\u671b\u521d\u671f\u90e8\u7f72\u5927\u91cf\u72ec\u7acb\u6a21\u5757\u7684\u6280\u672f\u56e2\u961f\u3002<\/p>\n<p><strong>\u6838\u5fc3\u80fd\u529b\uff1a<\/strong><\/p>\n<p>\u652f\u6301\u9879\u76ee\u3001Issue\u3001\u81ea\u5b9a\u4e49\u5b57\u6bb5\u3001\u5de5\u4f5c\u6d41\u3001\u654f\u6377\u770b\u677f\u3001\u51b2\u523a\u3001\u65f6\u95f4\u7ebf\u3001\u67e5\u8be2\u4e0e\u62a5\u8868\u3002\u56e2\u961f\u53ef\u5efa\u7acb Epic\u3001User Story \u4e0e Task \u7b49\u5c42\u7ea7\u5173\u7cfb\uff0c\u901a\u8fc7 Scrum\u3001Kanban \u6216\u6df7\u5408\u65b9\u5f0f\u7ba1\u7406\u5de5\u4f5c\u3002\u5de5\u4f5c\u6d41\u80fd\u591f\u6821\u9a8c\u5b57\u6bb5\u3001\u81ea\u52a8\u66f4\u65b0\u72b6\u6001\u3001\u53d1\u9001\u901a\u77e5\u4e0e\u6267\u884c\u5468\u671f\u6027\u4efb\u52a1\u3002\u63d0\u4f9b Cloud \u4e0e Server \u4e24\u79cd\u4ea7\u54c1\u5f62\u6001\uff0c\u5177\u4f53\u529f\u80fd\u4e0e\u7ef4\u62a4\u65b9\u5f0f\u5e94\u4ee5\u5f53\u524d\u7248\u672c\u6838\u9a8c\u4e3a\u51c6\u3002<\/p>\n<p><strong>\u9002\u7528\u573a\u666f\uff1a<\/strong><\/p>\n<p>\u9002\u5408\u8f6f\u4ef6\u5f00\u53d1\u3001\u6280\u672f\u652f\u6301\u4e0e\u5185\u90e8 IT \u56e2\u961f\uff0c\u5c24\u5176\u4e60\u60ef\u4ee5 Issue \u9a71\u52a8\u9700\u6c42\u3001\u4efb\u52a1\u4e0e\u7f3a\u9677\u5904\u7406\u7684\u7ec4\u7ec7\u3002\u4e2d\u5c0f\u56e2\u961f\u53ef\u7528\u8f83\u7b80\u5355\u7684\u5b57\u6bb5\u4e0e\u770b\u677f\u542f\u52a8\u9879\u76ee\uff1b\u6d41\u7a0b\u6210\u719f\u540e\uff0c\u518d\u9010\u6b65\u589e\u52a0\u81ea\u52a8\u5316\u5de5\u4f5c\u6d41\u3001\u5c42\u7ea7\u5173\u7cfb\u4e0e\u7edf\u8ba1\u62a5\u8868\u3002<\/p>\n<p><strong>\u4f18\u52bf\u4eae\u70b9\uff1a<\/strong><\/p>\n<p>\u5de5\u4f5c\u9879\u6a21\u578b\u7075\u6d3b\u3002\u4f01\u4e1a\u53ef\u6839\u636e\u81ea\u8eab\u7ba1\u7406\u8bed\u8a00\u8bbe\u7f6e\u9700\u6c42\u7c7b\u578b\u3001\u72b6\u6001\u3001\u5b57\u6bb5\u4e0e\u89c4\u5219\uff0c\u4e0d\u5fc5\u5b8c\u5168\u91c7\u7528\u56fa\u5b9a\u6a21\u677f\u3002\u654f\u6377\u770b\u677f\u65e2\u652f\u6301 Scrum \u4e0e Kanban\uff0c\u4e5f\u53ef\u4f5c\u4e3a\u666e\u901a\u6d41\u7a0b\u7684\u53ef\u89c6\u5316\u89c6\u56fe\uff0c\u9002\u5408\u9700\u8981\u9010\u6b65\u8c03\u6574\u7ba1\u7406\u65b9\u5f0f\u7684\u56e2\u961f\u3002<\/p>\n<p><strong>\u9002\u7528\u8fb9\u754c\uff1a<\/strong><\/p>\n<p>\u66f4\u64c5\u957f\u7ba1\u7406\u5df2\u5f62\u6210\u7684\u5de5\u4f5c\u9879\uff0c\u5bf9\u5ba2\u6237\u53cd\u9988\u6536\u96c6\u3001\u9700\u6c42\u6d1e\u5bdf\u3001\u4ea7\u54c1\u7ec4\u5408\u89c4\u5212\u4e0e\u5e02\u573a\u8def\u7ebf\u56fe\u7684\u8986\u76d6\u76f8\u5bf9\u6709\u9650\u3002\u56fd\u5185\u4f01\u4e1a\u8fd8\u9700\u8bc4\u4f30 Cloud \u6570\u636e\u4f4d\u7f6e\u3001\u8bbf\u95ee\u4f53\u9a8c\u3001\u672c\u5730\u670d\u52a1\uff0c\u4ee5\u53ca Server \u7248\u672c\u7684\u90e8\u7f72\u4e0e\u5347\u7ea7\u8d23\u4efb\u3002<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/77859e11b7ec_YouTrack-\u4ea7\u54c1\u56fe.png\" alt=\"\u9700\u6c42\u7ba1\u7406 \u9879\u76ee\u7ba1\u7406 \u4e00\u4f53\u5316\u5e73\u53f0 YouTrack \u4ea7\u54c1\u56fe\" width=\"2612\" height=\"1336\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"6%E3%80%81GitHub_Projects%EF%BC%9A%E4%BB%A3%E7%A0%81%E4%BB%93%E5%BA%93%E9%A9%B1%E5%8A%A8%E5%9B%A2%E9%98%9F%E7%9A%84%E8%BD%BB%E9%87%8F%E9%9C%80%E6%B1%82%E8%B7%9F%E8%B8%AA\"><\/span>6\u3001GitHub Projects\uff1a\u4ee3\u7801\u4ed3\u5e93\u9a71\u52a8\u56e2\u961f\u7684\u8f7b\u91cf\u9700\u6c42\u8ddf\u8e2a<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>GitHub Projects \u4e0e GitHub Issues \u548c Pull Requests \u7d27\u5bc6\u8fde\u63a5\u3002\u82e5\u56e2\u961f\u7684\u529f\u80fd\u5efa\u8bae\u3001\u7f3a\u9677\u4e0e\u6280\u672f\u4efb\u52a1\u4e3b\u8981\u6765\u81ea\u4ee3\u7801\u4ed3\u5e93\u6216\u5f00\u6e90\u793e\u533a\uff0c\u53ef\u76f4\u63a5\u4f7f\u7528\u8fd9\u4e9b Issue \u5efa\u7acb\u5f85\u529e\u5217\u8868\u3001\u8fed\u4ee3\u8ba1\u5212\u4e0e\u8def\u7ebf\u56fe\uff0c\u51cf\u5c11\u9879\u76ee\u7cfb\u7edf\u4e0e\u4ee3\u7801\u5e73\u53f0\u4e4b\u95f4\u7684\u91cd\u590d\u5f55\u5165\u3002<\/p>\n<p><strong>\u6838\u5fc3\u80fd\u529b\uff1a<\/strong><\/p>\n<p>\u652f\u6301\u8868\u683c\u3001\u770b\u677f\u4e0e\u8def\u7ebf\u56fe\u89c6\u56fe\uff0c\u53ef\u7ba1\u7406 Issues\u3001Pull Requests \u4e0e\u8349\u7a3f\u4e8b\u9879\uff0c\u901a\u8fc7\u81ea\u5b9a\u4e49\u5b57\u6bb5\u3001\u7b5b\u9009\u3001\u6392\u5e8f\u3001\u5206\u7ec4\u4e0e\u56fe\u8868\u5efa\u7acb\u4e0d\u540c\u7ba1\u7406\u89c6\u89d2\u3002\u56e2\u961f\u53ef\u8bbe\u7f6e\u4f18\u5148\u7ea7\u3001\u8fed\u4ee3\u3001\u8d1f\u8d23\u4eba\u3001\u65e5\u671f\u4e0e\u72b6\u6001\u5b57\u6bb5\uff0c\u5e76\u901a\u8fc7\u5de5\u4f5c\u6d41\u81ea\u52a8\u6dfb\u52a0\u3001\u66f4\u65b0\u6216\u5f52\u6863\u4e8b\u9879\u3002GitHub Issues \u8fd8\u53ef\u7528\u4e8e\u8bb0\u5f55\u529f\u80fd\u9700\u6c42\u3001\u7f3a\u9677\u4e0e\u4efb\u52a1\uff0c\u5e76\u4e0e\u4ee3\u7801\u5206\u652f\u3001Pull Request \u4e0e\u91cc\u7a0b\u7891\u4fdd\u6301\u8054\u7cfb\u3002<\/p>\n<p><strong>\u9002\u7528\u573a\u666f\uff1a<\/strong><\/p>\n<p>\u9002\u5408\u5f00\u53d1\u8005\u4e3b\u5bfc\u3001\u4ee3\u7801\u4ed3\u5e93\u8fb9\u754c\u6e05\u6670\u3001\u9700\u6c42\u6d41\u7a0b\u76f8\u5bf9\u8f7b\u91cf\u7684\u7814\u53d1\u56e2\u961f\uff0c\u4e5f\u9002\u5408\u5f00\u6e90\u9879\u76ee\u3001\u5e73\u53f0\u5de5\u7a0b\u4e0e\u5185\u90e8\u5f00\u53d1\u8005\u5de5\u5177\u56e2\u961f\u3002\u5f53\u4ea7\u54c1\u7ecf\u7406\u4e0e\u5f00\u53d1\u4eba\u5458\u5df2\u5728 GitHub \u4e2d\u534f\u4f5c\u65f6\uff0c\u9700\u6c42\u8ba8\u8bba\u3001\u4ee3\u7801\u5b9e\u73b0\u4e0e\u5408\u5e76\u72b6\u6001\u53ef\u4fdd\u6301\u8f83\u8fd1\u7684\u8ddd\u79bb\u3002<\/p>\n<p><strong>\u4f18\u52bf\u4eae\u70b9\uff1a<\/strong><\/p>\n<p>\u4e0e\u4ee3\u7801\u534f\u4f5c\u7684\u8fde\u63a5\u8f83\u4e3a\u76f4\u63a5\u3002\u5f00\u53d1\u4eba\u5458\u53ef\u56f4\u7ed5 Issue \u521b\u5efa\u5206\u652f\u3001\u63d0\u4ea4\u4ee3\u7801\u4e0e\u53d1\u8d77 Pull Request\uff0c\u9879\u76ee\u89c6\u56fe\u4e5f\u80fd\u968f Issue \u4e0e Pull Request \u72b6\u6001\u53d8\u5316\u800c\u66f4\u65b0\u3002\u540c\u4e00\u6279\u4e8b\u9879\u53ef\u6309\u8868\u683c\u3001\u770b\u677f\u4e0e\u8def\u7ebf\u56fe\u5c55\u793a\uff0c\u56e2\u961f\u4e0d\u5fc5\u7ef4\u62a4\u591a\u4efd\u8ba1\u5212\u3002<\/p>\n<p><strong>\u9002\u7528\u8fb9\u754c\uff1a<\/strong><\/p>\n<p>GitHub Projects \u4e2d\u7684\u9700\u6c42\u901a\u5e38\u4ee5 Issue \u5f62\u5f0f\u5b58\u5728\uff0c\u4e0d\u7b49\u4e8e\u5b8c\u6574\u7684\u4ea7\u54c1\u9700\u6c42\u7ba1\u7406\u3002\u82e5\u4f01\u4e1a\u9700\u8981\u5ba2\u6237\u9700\u6c42\u95e8\u6237\u3001\u9700\u6c42\u6e05\u6d17\u3001\u591a\u7ef4\u4ef7\u503c\u8bc4\u5ba1\u3001\u590d\u6742\u8d44\u6e90\u7ba1\u7406\u3001\u6d4b\u8bd5\u8d44\u4ea7\u4e0e\u7ec4\u7ec7\u7ea7\u9879\u76ee\u96c6\uff0c\u8fd8\u9700\u8865\u5145\u5176\u4ed6\u5de5\u5177\u3002\u975e\u6280\u672f\u90e8\u95e8\u53c2\u4e0e\u8f83\u591a\u65f6\uff0c\u9700\u8bc4\u4f30\u5b66\u4e60\u95e8\u69db\u4e0e\u534f\u4f5c\u4e60\u60ef\u3002<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/3703d5c15ef2_GitHub-\u4ea7\u54c1\u56fe.png\" alt=\"\u9700\u6c42\u7ba1\u7406 \u9879\u76ee\u7ba1\u7406 \u4e00\u4f53\u5316\u5e73\u53f0 GitHub \u4ea7\u54c1\u56fe\" width=\"2612\" height=\"1336\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"7%E3%80%81CODING_DevOps%EF%BC%9A%E8%A6%86%E7%9B%96%E9%9C%80%E6%B1%82%E3%80%81%E9%A1%B9%E7%9B%AE%E5%8D%8F%E5%90%8C%E4%B8%8E%E6%8C%81%E7%BB%AD%E4%BA%A4%E4%BB%98%E7%9A%84%E7%A0%94%E5%8F%91%E5%B9%B3%E5%8F%B0\"><\/span>7\u3001CODING DevOps\uff1a\u8986\u76d6\u9700\u6c42\u3001\u9879\u76ee\u534f\u540c\u4e0e\u6301\u7eed\u4ea4\u4ed8\u7684\u7814\u53d1\u5e73\u53f0<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>CODING DevOps \u9762\u5411\u8f6f\u4ef6\u7814\u53d1\u56e2\u961f\uff0c\u8986\u76d6\u9700\u6c42\u3001\u8bbe\u8ba1\u3001\u5f00\u53d1\u3001\u6784\u5efa\u3001\u6d4b\u8bd5\u3001\u53d1\u5e03\u4e0e\u90e8\u7f72\u3002\u53ef\u5c06\u4ea7\u54c1\u9700\u6c42\u7eb3\u5165\u9879\u76ee\u534f\u540c\u6a21\u5757\uff0c\u518d\u4e0e\u4ee3\u7801\u6258\u7ba1\u3001\u6301\u7eed\u96c6\u6210\u3001\u5236\u54c1\u4e0e\u90e8\u7f72\u8fc7\u7a0b\u8fde\u63a5\uff0c\u9002\u5408\u5e0c\u671b\u5728\u56fd\u5185\u670d\u52a1\u4f53\u7cfb\u4e0b\u6574\u5408\u9879\u76ee\u7ba1\u7406\u4e0e DevOps \u5de5\u5177\u94fe\u7684\u7814\u53d1\u4f01\u4e1a\u3002<\/p>\n<p><strong>\u6838\u5fc3\u80fd\u529b\uff1a<\/strong><\/p>\n<p>\u9879\u76ee\u534f\u540c\u652f\u6301\u53f2\u8bd7\u3001\u7528\u6237\u6545\u4e8b\u3001\u9700\u6c42\u3001\u4efb\u52a1\u4e0e\u7f3a\u9677\u7b49\u4e8b\u9879\u7c7b\u578b\uff0c\u63d0\u4f9b\u9700\u6c42\u62c6\u89e3\u3001\u8fed\u4ee3\u89c4\u5212\u3001\u4f18\u5148\u7ea7\u3001\u5de5\u65f6\u3001\u5de5\u4f5c\u6d41\u4e0e\u8fdb\u5ea6\u67e5\u770b\u3002\u8f83\u5927\u9700\u6c42\u53ef\u62c6\u5206\u4e3a\u5b50\u9700\u6c42\u4e0e\u4efb\u52a1\uff0c\u518d\u89c4\u5212\u81f3\u5177\u4f53\u8fed\u4ee3\u3002\u7f3a\u9677\u4e5f\u53ef\u5173\u8054\u9700\u6c42\u3001\u8fed\u4ee3\u4e0e\u8d1f\u8d23\u4eba\u3002\u9879\u76ee\u534f\u540c\u53ef\u8fde\u63a5 Git \u6216 SVN \u4ee3\u7801\u6258\u7ba1\u3001\u6301\u7eed\u96c6\u6210\u3001\u6d4b\u8bd5\u3001\u5236\u54c1\u5e93\u4e0e\u6301\u7eed\u90e8\u7f72\uff0c\u5f62\u6210\u4ece\u9700\u6c42\u5230\u53d1\u5e03\u7684\u5de5\u7a0b\u94fe\u8def\u3002<\/p>\n<p><strong>\u9002\u7528\u573a\u666f\uff1a<\/strong><\/p>\n<p>\u9002\u5408\u5e0c\u671b\u7edf\u4e00\u9879\u76ee\u534f\u540c\u3001\u4ee3\u7801\u3001\u6d41\u6c34\u7ebf\u4e0e\u5236\u54c1\u7ba1\u7406\u7684\u8f6f\u4ef6\u56e2\u961f\u3002\u4e92\u8054\u7f51\u4ea7\u54c1\u3001\u4f01\u4e1a\u8f6f\u4ef6\u3001\u5185\u90e8\u4fe1\u606f\u5316\u4e0e\u4e91\u539f\u751f\u5e94\u7528\u56e2\u961f\uff0c\u53ef\u56f4\u7ed5\u9700\u6c42\u5efa\u7acb\u8f83\u5b8c\u6574\u7684\u7814\u53d1\u6d41\u7a0b\u3002\u5df2\u4f7f\u7528\u817e\u8baf\u4e91\u76f8\u5173\u670d\u52a1\u7684\u4f01\u4e1a\uff0c\u53ef\u7ed3\u5408\u73b0\u6709\u6280\u672f\u73af\u5883\u8bc4\u4f30\u3002<\/p>\n<p><strong>\u4f18\u52bf\u4eae\u70b9\uff1a<\/strong><\/p>\n<p>\u7814\u53d1\u5de5\u5177\u8986\u76d6\u8f83\u5b8c\u6574\u3002\u9700\u6c42\u8fdb\u5165\u9879\u76ee\u540e\uff0c\u53ef\u7ee7\u7eed\u5173\u8054\u8fed\u4ee3\u3001\u4efb\u52a1\u3001\u7f3a\u9677\u3001\u4ee3\u7801\u4e0e\u6d41\u6c34\u7ebf\uff0c\u9002\u5408\u4ee5\u6301\u7eed\u96c6\u6210\u4e3a\u57fa\u7840\u63a8\u8fdb\u8f6f\u4ef6\u4ea4\u4ed8\u7684\u56e2\u961f\u3002\u540c\u65f6\u63d0\u4f9b Scrum \u654f\u6377\u4e0e\u7ecf\u5178\u9879\u76ee\u7ba1\u7406\u6a21\u5f0f\uff0c\u4f01\u4e1a\u53ef\u6309\u9879\u76ee\u7c7b\u578b\u9009\u62e9\u4e0d\u540c\u7ba1\u7406\u65b9\u5f0f\u3002<\/p>\n<p><strong>\u9002\u7528\u8fb9\u754c\uff1a<\/strong><\/p>\n<p>\u82e5\u4f01\u4e1a\u66f4\u5173\u6ce8\u5ba2\u6237\u53cd\u9988\u805a\u5408\u3001\u4ea7\u54c1\u7ec4\u5408\u3001\u9700\u6c42\u4ef7\u503c\u8bc4\u5ba1\u4e0e\u590d\u6742\u4ea7\u54c1\u8def\u7ebf\u56fe\uff0c\u9700\u8fdb\u4e00\u6b65\u9a8c\u8bc1\u5176\u4ea7\u54c1\u7ba1\u7406\u5c42\u9762\u7684\u6df1\u5ea6\u3002\u4e0d\u540c\u5957\u9910\u4e0e\u90e8\u7f72\u65b9\u6848\u53ef\u80fd\u5bf9\u5e94\u4e0d\u540c\u7684\u8d44\u6e90\u3001\u6743\u9650\u4e0e\u529f\u80fd\u8303\u56f4\uff0c\u91c7\u8d2d\u524d\u5e94\u91cd\u70b9\u6838\u9a8c\u4ee3\u7801\u4e0e\u5236\u54c1\u5bb9\u91cf\u3001\u6d41\u6c34\u7ebf\u8d44\u6e90\u3001\u90e8\u7f72\u6a21\u5f0f\u4e0e\u7b2c\u4e09\u65b9\u96c6\u6210\u6761\u4ef6\u3002<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/9c605ee0698b_CODING-DevOps-\u4ea7\u54c1\u56fe-scaled-1.png\" alt=\"\u9700\u6c42\u7ba1\u7406 \u9879\u76ee\u7ba1\u7406 \u4e00\u4f53\u5316\u5e73\u53f0 CODING DevOps \u4ea7\u54c1\u56fe\" width=\"2612\" height=\"1336\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"8%E3%80%81Basecamp%EF%BC%9A%E8%BD%BB%E9%87%8F%E9%9C%80%E6%B1%82%E6%B2%9F%E9%80%9A%E4%B8%8E%E5%AE%A2%E6%88%B7%E9%A1%B9%E7%9B%AE%E5%8D%8F%E4%BD%9C\"><\/span>8\u3001Basecamp\uff1a\u8f7b\u91cf\u9700\u6c42\u6c9f\u901a\u4e0e\u5ba2\u6237\u9879\u76ee\u534f\u4f5c<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Basecamp \u5f3a\u8c03\u6c9f\u901a\u96c6\u4e2d\u3001\u4efb\u52a1\u660e\u786e\u4e0e\u5ba2\u6237\u534f\u4f5c\u3002\u53ef\u5c06\u5ba2\u6237\u610f\u89c1\u3001\u9879\u76ee\u8ba8\u8bba\u3001\u5f85\u529e\u4e8b\u9879\u3001\u6587\u4ef6\u4e0e\u65e5\u7a0b\u653e\u5165\u540c\u4e00\u9879\u76ee\u7a7a\u95f4\uff0c\u51cf\u5c11\u9700\u6c42\u6563\u843d\u5728\u90ae\u4ef6\u4e0e\u5373\u65f6\u6d88\u606f\u4e2d\u7684\u60c5\u51b5\u3002\u867d\u975e\u4e13\u4e1a\u9700\u6c42\u7ba1\u7406\u5e73\u53f0\uff0c\u4f46\u5bf9\u4e8e\u9700\u6c42\u7ed3\u6784\u7b80\u5355\u3001\u6c9f\u901a\u6210\u672c\u9ad8\u4e8e\u6d41\u7a0b\u590d\u6742\u5ea6\u7684\u56e2\u961f\uff0c\u4f7f\u7528\u65b9\u5f0f\u76f8\u5bf9\u76f4\u63a5\u3002<\/p>\n<p><strong>\u6838\u5fc3\u80fd\u529b\uff1a<\/strong><\/p>\n<p>\u63d0\u4f9b\u5f85\u529e\u4e8b\u9879\u3001\u8ba8\u8bba\u533a\u3001\u7fa4\u7ec4\u6c9f\u901a\u3001\u65e5\u7a0b\u3001\u6587\u6863\u4e0e\u6587\u4ef6\u3001\u81ea\u52a8\u63d0\u95ee\u4e0e\u9879\u76ee\u72b6\u6001\u67e5\u770b\u7b49\u80fd\u529b\u3002\u5ba2\u6237\u53cd\u9988\u53ef\u6574\u7406\u4e3a\u5f85\u529e\u4e8b\u9879\uff0c\u8bbe\u7f6e\u8d1f\u8d23\u4eba\u4e0e\u65f6\u95f4\uff0c\u5e76\u5728\u8ba8\u8bba\u8bb0\u5f55\u4e2d\u4fdd\u7559\u80cc\u666f\u3001\u4fee\u6539\u610f\u89c1\u4e0e\u786e\u8ba4\u7ed3\u679c\u3002Hill Charts \u7528\u4e8e\u5c55\u793a\u4e8b\u9879\u4ece&quot;\u5c1a\u672a\u7406\u6e05\u89e3\u51b3\u65b9\u5f0f&quot;\u5230&quot;\u6267\u884c\u63a5\u8fd1\u5b8c\u6210&quot;\u7684\u53d8\u5316\uff0c\u5e2e\u52a9\u56e2\u961f\u8bc6\u522b\u4ecd\u5b58\u5728\u8f83\u5927\u4e0d\u786e\u5b9a\u6027\u7684\u5de5\u4f5c\u3002<\/p>\n<p><strong>\u9002\u7528\u573a\u666f\uff1a<\/strong><\/p>\n<p>\u9002\u5408\u5c0f\u578b\u670d\u52a1\u56e2\u961f\u3001\u54a8\u8be2\u56e2\u961f\u3001\u521b\u610f\u673a\u6784\u3001\u4ee3\u7406\u516c\u53f8\u4e0e\u9700\u8981\u4e0e\u5ba2\u6237\u5171\u540c\u63a8\u8fdb\u9879\u76ee\u7684\u7ec4\u7ec7\u3002\u5f53\u9700\u6c42\u4e3b\u8981\u901a\u8fc7\u6c9f\u901a\u786e\u8ba4\uff0c\u4e14\u53ef\u5feb\u901f\u62c6\u89e3\u4e3a\u660e\u786e\u5f85\u529e\u4e8b\u9879\u65f6\uff0cBasecamp \u80fd\u591f\u964d\u4f4e\u9879\u76ee\u5de5\u5177\u7684\u7ef4\u62a4\u6210\u672c\u3002<\/p>\n<p><strong>\u4f18\u52bf\u4eae\u70b9\uff1a<\/strong><\/p>\n<p>\u672a\u5f3a\u8c03\u590d\u6742\u7684\u5de5\u4f5c\u9879\u6a21\u578b\uff0c\u800c\u662f\u5c06\u8ba8\u8bba\u3001\u4efb\u52a1\u3001\u6587\u4ef6\u4e0e\u5ba2\u6237\u786e\u8ba4\u96c6\u4e2d\u5728\u4e00\u4e2a\u9879\u76ee\u7a7a\u95f4\u4e2d\u3002\u5bf9\u5ba2\u6237\u53c2\u4e0e\u8f83\u591a\u7684\u56e2\u961f\u8f83\u4e3a\u5b9e\u7528\uff0c\u9700\u6c42\u80cc\u666f\u3001\u4fee\u6539\u610f\u89c1\u4e0e\u6700\u7ec8\u786e\u8ba4\u4e0d\u5fc5\u5206\u6563\u4e8e\u591a\u4e2a\u6c9f\u901a\u6e20\u9053\u3002<\/p>\n<p><strong>\u9002\u7528\u8fb9\u754c\uff1a<\/strong><\/p>\n<p>\u7f3a\u5c11\u4e13\u4e1a\u9700\u6c42\u6c60\u3001\u9700\u6c42\u5c42\u7ea7\u3001\u4ef7\u503c\u8bc4\u5206\u3001\u4ea7\u54c1\u8def\u7ebf\u56fe\u3001\u6d4b\u8bd5\u8986\u76d6\u4e0e\u7814\u53d1\u4ea4\u4ed8\u8ffd\u6eaf\u3002\u82e5\u4f01\u4e1a\u9700\u6c42\u6570\u91cf\u8f83\u591a\uff0c\u9700\u8981\u4e25\u683c\u5ba1\u6279\u3001\u8de8\u9879\u76ee\u4f9d\u8d56\u6216\u7ec4\u7ec7\u7ea7\u7edf\u8ba1\uff0c\u66f4\u9002\u5408\u4f5c\u4e3a\u6c9f\u901a\u4e0e\u534f\u4f5c\u5de5\u5177\u800c\u975e\u5b8c\u6574\u7684\u9700\u6c42\u6cbb\u7406\u5e73\u53f0\u3002\u56fd\u5185\u56e2\u961f\u8fd8\u5e94\u8bc4\u4f30\u8bed\u8a00\u3001\u8bbf\u95ee\u3001\u91c7\u8d2d\u4e0e\u6570\u636e\u5b58\u50a8\u6761\u4ef6\u3002<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/blogcdn.ones-ai.cn\/blog\/uploads\/2026\/04\/5b53363d2479_Basecamp-\u4ea7\u54c1\u56fe-scaled-1.png\" alt=\"\u9700\u6c42\u7ba1\u7406 \u9879\u76ee\u7ba1\u7406 \u4e00\u4f53\u5316\u5e73\u53f0 Basecamp \u4ea7\u54c1\u56fe\" width=\"2612\" height=\"1336\" \/><\/p>\n<h3><span class=\"ez-toc-section\" id=\"9%E3%80%81Leangoo%E9%A2%86%E6%AD%8C%EF%BC%9A%E4%BB%A5%E6%95%8F%E6%8D%B7%E7%9C%8B%E6%9D%BF%E8%BF%9E%E6%8E%A5%E9%9C%80%E6%B1%82%E4%B8%8E%E9%A1%B9%E7%9B%AE%E6%89%A7%E8%A1%8C\"><\/span>9\u3001Leangoo\u9886\u6b4c\uff1a\u4ee5\u654f\u6377\u770b\u677f\u8fde\u63a5\u9700\u6c42\u4e0e\u9879\u76ee\u6267\u884c<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Leangoo \u9886\u6b4c\u8986\u76d6\u9700\u6c42\u3001\u4efb\u52a1\u3001\u95ee\u9898\u3001\u7f3a\u9677\u3001\u8fed\u4ee3\u4e0e\u8fdb\u5c55\u7edf\u8ba1\uff0c\u9002\u5408\u5e0c\u671b\u4ece\u53ef\u89c6\u5316\u770b\u677f\u5165\u624b\uff0c\u5efa\u7acb\u4ea7\u54c1\u5f85\u529e\u5217\u8868\u3001Sprint \u4e0e\u4efb\u52a1\u534f\u4f5c\u6d41\u7a0b\u7684\u56e2\u961f\u3002\u9664 Scrum \u5916\uff0c\u4e5f\u63d0\u4f9b\u89c4\u6a21\u5316\u654f\u6377\u4e0e\u9636\u6bb5\u5f0f\u9879\u76ee\u7ba1\u7406\u6a21\u677f\u3002<\/p>\n<p><strong>\u6838\u5fc3\u80fd\u529b\uff1a<\/strong><\/p>\n<p>\u5c06\u9700\u6c42\u3001\u4efb\u52a1\u3001\u95ee\u9898\u4e0e\u7f3a\u9677\u4f5c\u4e3a\u5361\u7247\u7f6e\u4e8e\u770b\u677f\u4e2d\uff0c\u901a\u8fc7\u5217\u8868\u3001\u6cf3\u9053\u3001\u5b57\u6bb5\u4e0e\u5361\u7247\u5173\u7cfb\u7ec4\u7ec7\u6d41\u7a0b\u3002\u56e2\u961f\u53ef\u7ba1\u7406\u4ea7\u54c1 Backlog\u3001\u53f2\u8bd7\u3001\u7528\u6237\u6545\u4e8b\u3001Sprint\u3001\u4efb\u52a1\u3001\u7f3a\u9677\u3001\u71c3\u5c3d\u56fe\u4e0e\u56e2\u961f\u901f\u7387\uff0c\u5e76\u4f7f\u7528\u4e0d\u540c\u770b\u677f\u67e5\u770b\u4ea7\u54c1\u89c4\u5212\u4e0e\u8fed\u4ee3\u6267\u884c\u3002\u63d0\u4f9b Scrum of Scrums\u3001SAFe \u4e0e\u9636\u6bb5\u5f0f\u9879\u76ee\u6a21\u677f\uff0c\u7528\u4e8e\u591a\u56e2\u961f\u654f\u6377\u3001\u7011\u5e03\u3001V \u6a21\u578b\u53ca\u9636\u6bb5\u95e8\u9879\u76ee\u3002<\/p>\n<p><strong>\u9002\u7528\u573a\u666f\uff1a<\/strong><\/p>\n<p>\u9002\u5408\u91c7\u7528 Scrum\u3001\u770b\u677f\u6216 SAFe \u7684\u7814\u53d1\u56e2\u961f\uff0c\u4e5f\u9002\u5408\u521a\u5f00\u59cb\u5efa\u7acb\u654f\u6377\u9700\u6c42\u4e0e\u8fed\u4ee3\u7ba1\u7406\u6d41\u7a0b\u7684\u7ec4\u7ec7\u3002\u6e38\u620f\u7814\u53d1\u3001\u4e92\u8054\u7f51\u4ea7\u54c1\u3001\u8f6f\u4ef6\u5f00\u53d1\u4e0e\u8f6f\u786c\u4ef6\u7814\u53d1\u56e2\u961f\uff0c\u53ef\u7528\u5b83\u7ba1\u7406\u9700\u6c42\u4f18\u5148\u7ea7\u3001Sprint \u8ba1\u5212\u3001\u4efb\u52a1\u6267\u884c\u4e0e\u7f3a\u9677\u5904\u7406\u3002<\/p>\n<p><strong>\u4f18\u52bf\u4eae\u70b9\uff1a<\/strong><\/p>\n<p>\u654f\u6377\u65b9\u6cd5\u4e0e\u53ef\u89c6\u5316\u770b\u677f\u7ed3\u5408\u8f83\u7d27\u5bc6\u3002\u4ea7\u54c1\u5f85\u529e\u3001Sprint \u4e0e\u4efb\u52a1\u5361\u7247\u7684\u5173\u7cfb\u8f83\u4e3a\u76f4\u89c2\uff0c\u56e2\u961f\u6210\u5458\u80fd\u591f\u5feb\u901f\u67e5\u770b\u5f53\u524d\u4f18\u5148\u7ea7\u3001\u8d1f\u8d23\u4eba\u4e0e\u5de5\u4f5c\u72b6\u6001\u3002\u5bf9\u4e8e\u591a\u654f\u6377\u56e2\u961f\uff0c\u8fd8\u53ef\u901a\u8fc7\u7236\u9879\u76ee\u4e0e\u5b50\u9879\u76ee\u5206\u522b\u7ba1\u7406\u4ea7\u54c1\u9700\u6c42\u3001\u5171\u4eab\u7f3a\u9677\u4e0e\u5404\u56e2\u961f Sprint\u3002<\/p>\n<p><strong>\u9002\u7528\u8fb9\u754c\uff1a<\/strong><\/p>\n<p>\u82e5\u4f01\u4e1a\u9700\u8981\u9700\u6c42\u4e0e\u4ee3\u7801\u63d0\u4ea4\u3001\u6d41\u6c34\u7ebf\u3001\u5236\u54c1\u4e0e\u81ea\u52a8\u90e8\u7f72\u5efa\u7acb\u8f83\u6df1\u5173\u8054\uff0c\u8fd8\u5e94\u9a8c\u8bc1\u5176 DevOps \u5de5\u5177\u96c6\u6210\u80fd\u529b\u3002\u5bf9\u4e8e\u5f3a\u8c03\u9879\u76ee\u6210\u672c\u3001\u5408\u540c\u3001\u91c7\u8d2d\u3001\u590d\u6742\u8d44\u6e90\u8c03\u5ea6\u4e0e\u7ecf\u8425\u5206\u6790\u7684\u7ec4\u7ec7\uff0c\u4e5f\u9700\u4e0e\u4f01\u4e1a\u7ea7 PMO \u5e73\u53f0\u8fdb\u4e00\u6b65\u6bd4\u8f83\u3002\u4e0d\u540c\u7248\u672c\u4e0b\u7684 SAFe \u6a21\u677f\u3001\u4f01\u4e1a\u7edf\u8ba1\u4e0e\u5b9e\u65bd\u670d\u52a1\u8303\u56f4\uff0c\u5e94\u4ee5\u5f53\u524d\u4ea7\u54c1\u8bf4\u660e\u4e3a\u51c6\u3002<\/p>\n<h2><span class=\"ez-toc-section\" id=\"%E4%B8%89%E3%80%819%E6%AC%BE%E5%B9%B3%E5%8F%B0%E6%A0%B8%E5%BF%83%E7%89%B9%E6%80%A7%E5%AF%B9%E6%AF%94\"><\/span>\u4e09\u30019\u6b3e\u5e73\u53f0\u6838\u5fc3\u7279\u6027\u5bf9\u6bd4<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table>\n<thead>\n<tr>\n<th>\u4ea7\u54c1\u540d\u79f0<\/th>\n<th>\u4ea7\u54c1\u5b9a\u4f4d<\/th>\n<th>\u6838\u5fc3\u4e13\u4e1a\u80fd\u529b<\/th>\n<th>\u66f4\u9002\u5408\u7684\u573a\u666f<\/th>\n<th>\u9002\u7528\u56e2\u961f\u6216\u4f01\u4e1a\u89c4\u6a21<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>ONES<\/td>\n<td>\u4f01\u4e1a\u7ea7\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0<\/td>\n<td>\u9700\u6c42\u6c60\u3001\u591a\u7ea7\u5de5\u4f5c\u9879\u3001\u8fed\u4ee3\u3001\u6d4b\u8bd5\u3001\u6d41\u6c34\u7ebf\u3001\u6548\u80fd\u5ea6\u91cf\u3001\u8de8\u56e2\u961f\u534f\u4f5c\u6cbb\u7406<\/td>\n<td>\u4ea7\u54c1\u3001\u7814\u53d1\u3001\u6d4b\u8bd5\u56f4\u7ed5\u9700\u6c42\u534f\u540c\uff0c\u5efa\u7acb\u5b8c\u6574\u7814\u53d1\u4ea4\u4ed8\u94fe\u8def\uff0c\u6570\u636e\u9a71\u52a8\u6301\u7eed\u6539\u8fdb<\/td>\n<td>\u4e2d\u5927\u578b\u7814\u53d1\u56e2\u961f\u3001\u591a\u4ea7\u54c1\u7ebf\u4f01\u4e1a\u3001\u7ec4\u7ec7\u7ea7\u7814\u53d1\u6cbb\u7406<\/td>\n<\/tr>\n<tr>\n<td>Azure DevOps<\/td>\n<td>\u5fae\u8f6f\u4f53\u7cfb\u4e0b\u7684\u7814\u53d1\u534f\u4f5c\u4e0e DevOps \u5e73\u53f0<\/td>\n<td>\u591a\u7ea7\u5f85\u529e\u3001\u5de5\u4f5c\u9879\u3001\u51b2\u523a\u3001\u4ee3\u7801\u4e0e\u6d41\u6c34\u7ebf\u5173\u8054<\/td>\n<td>\u5fae\u8f6f\u6280\u672f\u4f53\u7cfb\u3001\u5de5\u7a0b\u6d41\u7a0b\u76f8\u5bf9\u6210\u719f\u7684\u7814\u53d1\u9879\u76ee<\/td>\n<td>\u4e2d\u578b\u81f3\u5927\u578b\u7814\u53d1\u7ec4\u7ec7<\/td>\n<\/tr>\n<tr>\n<td>\u732a\u9f7f\u9c7cChoerodon<\/td>\n<td>\u7814\u53d1\u9879\u76ee\u7ba1\u7406\u4e0e DevOps \u5e73\u53f0<\/td>\n<td>\u9700\u6c42\u751f\u547d\u5468\u671f\u3001\u654f\u6377\u7ba1\u7406\u3001\u6d4b\u8bd5\u3001CI\/CD \u4e0e\u73af\u5883\u7ba1\u7406<\/td>\n<td>\u79c1\u6709\u5316\u7814\u53d1\u5e73\u53f0\u3001\u89c4\u6a21\u5316\u654f\u6377\u4e0e\u5de5\u5177\u94fe\u6574\u5408<\/td>\n<td>\u4e2d\u5927\u578b\u7814\u53d1\u56e2\u961f\u3001\u5e73\u53f0\u5de5\u7a0b\u56e2\u961f<\/td>\n<\/tr>\n<tr>\n<td>\u4e8b\u4e95\u7136<\/td>\n<td>\u4f01\u4e1a\u9879\u76ee\u5168\u8fc7\u7a0b\u4e0e PMO \u6cbb\u7406\u5e73\u53f0<\/td>\n<td>\u7acb\u9879\u3001\u8ba1\u5212\u3001\u6210\u672c\u3001\u5408\u540c\u3001\u4ea4\u4ed8\u7269\u4e0e\u9a8c\u6536\u7ba1\u7406<\/td>\n<td>\u5de5\u7a0b\u3001\u54a8\u8be2\u3001\u79d1\u7814\u3001\u4ea7\u54c1\u7814\u53d1\u4e0e\u7ecf\u8425\u578b\u9879\u76ee<\/td>\n<td>\u4e2d\u5927\u578b\u4f01\u4e1a\u3001\u9879\u76ee\u578b\u7ec4\u7ec7<\/td>\n<\/tr>\n<tr>\n<td>YouTrack<\/td>\n<td>\u5de5\u4f5c\u9879\u8ddf\u8e2a\u4e0e\u654f\u6377\u9879\u76ee\u7ba1\u7406\u5de5\u5177<\/td>\n<td>Issue \u5c42\u7ea7\u3001\u81ea\u5b9a\u4e49\u5b57\u6bb5\u3001\u5de5\u4f5c\u6d41\u3001\u654f\u6377\u770b\u677f\u4e0e\u62a5\u8868<\/td>\n<td>\u6280\u672f\u56e2\u961f\u7edf\u4e00\u7ba1\u7406\u9700\u6c42\u3001\u4efb\u52a1\u4e0e\u7f3a\u9677<\/td>\n<td>\u4e2d\u5c0f\u81f3\u4e2d\u578b\u7814\u53d1\u56e2\u961f<\/td>\n<\/tr>\n<tr>\n<td>GitHub Projects<\/td>\n<td>\u4e0e\u4ee3\u7801\u4ed3\u5e93\u8fde\u63a5\u7684\u8f7b\u91cf\u8ba1\u5212\u5de5\u5177<\/td>\n<td>Issues\u3001Pull Requests\u3001\u8def\u7ebf\u56fe\u3001\u81ea\u5b9a\u4e49\u5b57\u6bb5\u4e0e\u81ea\u52a8\u5316<\/td>\n<td>GitHub \u4ee3\u7801\u534f\u4f5c\u9a71\u52a8\u7684\u4ea7\u54c1\u4e0e\u7814\u53d1\u9879\u76ee<\/td>\n<td>\u5c0f\u578b\u81f3\u4e2d\u578b\u5f00\u53d1\u56e2\u961f\u3001\u5f00\u6e90\u9879\u76ee<\/td>\n<\/tr>\n<tr>\n<td>CODING DevOps<\/td>\n<td>\u4e00\u7ad9\u5f0f\u7814\u53d1\u534f\u4f5c\u4e0e DevOps \u5e73\u53f0<\/td>\n<td>\u9700\u6c42\u3001\u8fed\u4ee3\u3001\u7f3a\u9677\u3001\u4ee3\u7801\u3001\u5236\u54c1\u4e0e\u6301\u7eed\u4ea4\u4ed8<\/td>\n<td>\u56fd\u5185\u8f6f\u4ef6\u56e2\u961f\u7edf\u4e00\u9879\u76ee\u534f\u540c\u4e0e\u7814\u53d1\u5de5\u5177\u94fe<\/td>\n<td>\u4e2d\u5c0f\u81f3\u4e2d\u5927\u578b\u7814\u53d1\u56e2\u961f<\/td>\n<\/tr>\n<tr>\n<td>Basecamp<\/td>\n<td>\u8f7b\u91cf\u9879\u76ee\u6c9f\u901a\u4e0e\u5ba2\u6237\u534f\u4f5c\u5e73\u53f0<\/td>\n<td>\u5f85\u529e\u3001\u8ba8\u8bba\u3001\u6587\u4ef6\u3001\u65e5\u7a0b\u3001\u5ba2\u6237\u786e\u8ba4\u4e0e Hill Charts<\/td>\n<td>\u670d\u52a1\u3001\u54a8\u8be2\u3001\u521b\u610f\u53ca\u5ba2\u6237\u4ea4\u4ed8\u9879\u76ee<\/td>\n<td>\u5c0f\u578b\u56e2\u961f\u3001\u4e2d\u5c0f\u670d\u52a1\u4f01\u4e1a<\/td>\n<\/tr>\n<tr>\n<td>Leangoo\u9886\u6b4c<\/td>\n<td>\u770b\u677f\u9a71\u52a8\u7684\u654f\u6377\u7814\u53d1\u4e0e\u9879\u76ee\u7ba1\u7406\u5de5\u5177<\/td>\n<td>\u4ea7\u54c1 Backlog\u3001Sprint\u3001\u7528\u6237\u6545\u4e8b\u3001\u7f3a\u9677\u4e0e\u89c4\u6a21\u5316\u654f\u6377<\/td>\n<td>Scrum\u3001SAFe\u3001\u770b\u677f\u53ca\u9636\u6bb5\u5f0f\u7814\u53d1\u9879\u76ee<\/td>\n<td>\u5c0f\u578b\u654f\u6377\u56e2\u961f\u81f3\u4e2d\u5927\u578b\u7814\u53d1\u7ec4\u7ec7<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u4e0d\u540c\u4ea7\u54c1\u7684\u7248\u672c\u3001\u5957\u9910\u4e0e\u90e8\u7f72\u65b9\u5f0f\u53ef\u80fd\u5bf9\u5e94\u4e0d\u540c\u529f\u80fd\u8303\u56f4\u3002\u4e0a\u8868\u9002\u7528\u4e8e\u521d\u6b65\u7b5b\u9009\uff0c\u6b63\u5f0f\u91c7\u8d2d\u4ecd\u5e94\u4ee5\u5f53\u524d\u7248\u672c\u8bf4\u660e\u4e0e\u5b9e\u9645\u6f14\u793a\u73af\u5883\u4e3a\u51c6\u3002<\/p>\n<h2><span class=\"ez-toc-section\" id=\"%E5%9B%9B%E3%80%81%E4%B8%8D%E5%90%8C%E4%BC%81%E4%B8%9A%E5%A6%82%E4%BD%95%E9%80%89%E6%8B%A9%E9%80%82%E5%90%88%E7%9A%84%E5%B9%B3%E5%8F%B0\"><\/span>\u56db\u3001\u4e0d\u540c\u4f01\u4e1a\u5982\u4f55\u9009\u62e9\u9002\u5408\u7684\u5e73\u53f0<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\u5927\u81f4\u53ef\u5206\u4e3a\u4e09\u7c7b\uff1a\u7814\u53d1\u5168\u6d41\u7a0b\u5e73\u53f0\u3001\u901a\u7528\u9879\u76ee\u7ba1\u7406\u5e73\u53f0\u4e0e\u8f7b\u91cf\u7814\u53d1\u534f\u4f5c\u5de5\u5177\u3002\u7814\u53d1\u578b\u4f01\u4e1a\u5e94\u91cd\u70b9\u9a8c\u8bc1\u9700\u6c42\u80fd\u5426\u5173\u8054\u8fed\u4ee3\u3001\u6d4b\u8bd5\u3001\u7f3a\u9677\u3001\u4ee3\u7801\u4e0e\u7248\u672c\uff1b\u8de8\u90e8\u95e8\u4f01\u4e1a\u66f4\u5e94\u5173\u6ce8\u8868\u5355\u3001\u5ba1\u6279\u3001\u9879\u76ee\u96c6\u3001\u6743\u9650\u4e0e\u8d44\u6599\u5f52\u6863\uff1b\u5c0f\u578b\u56e2\u961f\u5219\u5e94\u63a7\u5236\u7cfb\u7edf\u590d\u6742\u5ea6\uff0c\u4e0d\u5fc5\u4e3a\u529f\u80fd\u5b8c\u6574\u800c\u5f15\u5165\u8d85\u51fa\u5f53\u524d\u7ba1\u7406\u9700\u8981\u7684\u5e73\u53f0\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"1_%E9%9C%80%E8%B4%AF%E9%80%9A%E4%BA%A7%E5%93%81%E3%80%81%E7%A0%94%E5%8F%91%E3%80%81%E6%B5%8B%E8%AF%95%E4%B8%8E%E5%8F%91%E5%B8%83\"><\/span>1. \u9700\u8d2f\u901a\u4ea7\u54c1\u3001\u7814\u53d1\u3001\u6d4b\u8bd5\u4e0e\u53d1\u5e03<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u82e5\u4f01\u4e1a\u6838\u5fc3\u75db\u70b9\u662f\u9700\u6c42\u8fdb\u5165\u5f00\u53d1\u540e\u7f3a\u5c11\u6301\u7eed\u8ffd\u8e2a\uff0c\u5e94\u4f18\u5148\u8003\u5bdf\u7814\u53d1\u5168\u6d41\u7a0b\u5e73\u53f0\u3002<strong>ONES<\/strong> \u66f4\u9002\u5408\u5e0c\u671b\u4ece\u9700\u6c42\u6c60\u3001\u8bc4\u5ba1\u4e0e\u4ea7\u54c1\u89c4\u5212\u51fa\u53d1\uff0c\u7ee7\u7eed\u8fde\u63a5\u7814\u53d1\u9879\u76ee\u3001\u6d4b\u8bd5\u4e0e\u7248\u672c\u4ea4\u4ed8\uff0c\u5e76\u4ee5\u6548\u80fd\u5ea6\u91cf\u9a71\u52a8\u6539\u8fdb\u7684\u56fd\u5185\u4e2d\u5927\u578b\u7814\u53d1\u56e2\u961f\u3002Azure DevOps \u9002\u5408\u5fae\u8f6f\u6280\u672f\u4f53\u7cfb\u4e0e\u5de5\u7a0b\u6d41\u7a0b\u6210\u719f\u7684\u4f01\u4e1a\uff1bCODING DevOps \u9002\u5408\u9700\u8981\u7edf\u4e00\u56fd\u5185\u7814\u53d1\u534f\u4f5c\u4e0e\u6301\u7eed\u4ea4\u4ed8\u5de5\u5177\u7684\u56e2\u961f\uff1b\u732a\u9f7f\u9c7c Choerodon \u9002\u5408\u540c\u65f6\u5173\u6ce8\u654f\u6377\u7ba1\u7406\u3001\u79c1\u6709\u5316\u5efa\u8bbe\u4e0e DevOps \u5de5\u5177\u94fe\u6574\u5408\u7684\u4f01\u4e1a\u3002\u6f14\u793a\u65f6\u4e0d\u5e94\u4ec5\u67e5\u770b\u9700\u6c42\u5217\u8868\u4e0e\u4efb\u52a1\u770b\u677f\uff0c\u800c\u5e94\u9009\u62e9\u4e00\u6761\u771f\u5b9e\u9700\u6c42\uff0c\u5b8c\u6574\u6d4b\u8bd5\u8bc4\u5ba1\u3001\u62c6\u89e3\u3001\u8fed\u4ee3\u3001\u5f00\u53d1\u3001\u6d4b\u8bd5\u3001\u7f3a\u9677\u4e0e\u53d1\u5e03\u8fc7\u7a0b\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_%E9%9C%80%E6%B1%82%E4%B8%BB%E8%A6%81%E6%9D%A5%E8%87%AA%E5%A4%9A%E4%B8%AA%E4%B8%9A%E5%8A%A1%E9%83%A8%E9%97%A8\"><\/span>2. \u9700\u6c42\u4e3b\u8981\u6765\u81ea\u591a\u4e2a\u4e1a\u52a1\u90e8\u95e8<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u82e5\u9700\u6c42\u6765\u81ea\u9500\u552e\u3001\u8fd0\u8425\u3001\u4ea7\u54c1\u3001\u4ea4\u4ed8\u4e0e\u7ba1\u7406\u90e8\u95e8\uff0c\u4e14\u4e0d\u90fd\u5c5e\u4e8e\u8f6f\u4ef6\u7814\u53d1\uff0c\u901a\u7528\u9879\u76ee\u7ba1\u7406\u5e73\u53f0\u901a\u5e38\u66f4\u6613\u63a8\u5e7f\u3002\u4e8b\u4e95\u7136\u53ef\u901a\u8fc7\u8868\u5355\u3001\u81ea\u5b9a\u4e49\u5b57\u6bb5\u4e0e\u5de5\u4f5c\u6d41\u5efa\u7acb\u7edf\u4e00\u9700\u6c42\u5165\u53e3\uff0c\u518d\u5229\u7528\u7518\u7279\u56fe\u3001\u4efb\u52a1\u3001\u5ba1\u6279\u4e0e\u9879\u76ee\u96c6\u63a8\u8fdb\u6267\u884c\uff0c\u9002\u5408\u8de8\u90e8\u95e8\u534f\u4f5c\u4e0e\u591a\u7c7b\u578b\u9879\u76ee\u5e76\u5b58\u7684\u4f01\u4e1a\u3002\u82e5\u9879\u76ee\u8fd8\u6d89\u53ca\u7acb\u9879\u3001\u9884\u7b97\u3001\u5408\u540c\u3001\u6210\u672c\u3001\u5916\u90e8\u5408\u4f5c\u65b9\u4e0e\u9a8c\u6536\u7ed3\u7b97\uff0c\u5176\u5168\u8fc7\u7a0b\u9879\u76ee\u7ba1\u7406\u601d\u8def\u66f4\u503c\u5f97\u6bd4\u8f83\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_%E5%9B%A2%E9%98%9F%E4%BB%A5%E4%BB%A3%E7%A0%81%E4%BB%93%E5%BA%93%E4%B8%BA%E4%B8%BB%E8%A6%81%E5%8D%8F%E4%BD%9C%E5%85%A5%E5%8F%A3\"><\/span>3. \u56e2\u961f\u4ee5\u4ee3\u7801\u4ed3\u5e93\u4e3a\u4e3b\u8981\u534f\u4f5c\u5165\u53e3<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u82e5\u529f\u80fd\u5efa\u8bae\u3001\u7f3a\u9677\u4e0e\u6280\u672f\u4efb\u52a1\u5927\u591a\u76f4\u63a5\u8fdb\u5165\u4ee3\u7801\u4ed3\u5e93\uff0cGitHub Projects \u53ef\u51cf\u5c11\u9879\u76ee\u7cfb\u7edf\u4e0e\u4ee3\u7801\u5e73\u53f0\u4e4b\u95f4\u7684\u5207\u6362\u3002YouTrack \u540c\u6837\u9002\u5408 Issue \u9a71\u52a8\u7684\u7814\u53d1\u56e2\u961f\uff0c\u4f46\u5728\u81ea\u5b9a\u4e49\u5b57\u6bb5\u3001\u5de5\u4f5c\u6d41\u4e0e\u72ec\u7acb\u9879\u76ee\u7ba1\u7406\u65b9\u9762\u8986\u76d6\u66f4\u5b8c\u6574\u3002\u4e24\u8005\u5dee\u5f02\u53ef\u6982\u62ec\u4e3a\uff1aGitHub Projects \u66f4\u9760\u8fd1\u4ee3\u7801\u534f\u4f5c\uff0cYouTrack \u66f4\u63a5\u8fd1\u72ec\u7acb\u7684\u5de5\u4f5c\u9879\u8ddf\u8e2a\u4e0e\u654f\u6377\u9879\u76ee\u7ba1\u7406\u5e73\u53f0\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"4_%E5%9B%A2%E9%98%9F%E5%88%9A%E5%BC%80%E5%A7%8B%E8%90%BD%E5%9C%B0%E6%95%8F%E6%8D%B7%E7%AE%A1%E7%90%86\"><\/span>4. \u56e2\u961f\u521a\u5f00\u59cb\u843d\u5730\u654f\u6377\u7ba1\u7406<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u521a\u5f00\u59cb\u4f7f\u7528 Scrum \u6216\u770b\u677f\u7684\u56e2\u961f\uff0c\u4e0d\u5b9c\u4e00\u5f00\u59cb\u5c31\u5efa\u7acb\u8fc7\u591a\u5b57\u6bb5\u3001\u5ba1\u6279\u4e0e\u81ea\u52a8\u5316\u89c4\u5219\u3002Leangoo \u9886\u6b4c\u7684\u4ea7\u54c1 Backlog\u3001Sprint \u4e0e\u4efb\u52a1\u770b\u677f\u5173\u7cfb\u8f83\u4e3a\u76f4\u89c2\uff0c\u9002\u5408\u5148\u5efa\u7acb\u9700\u6c42\u900f\u660e\u4e0e\u8fed\u4ee3\u8282\u594f\u3002YouTrack \u4e5f\u53ef\u901a\u8fc7\u654f\u6377\u770b\u677f\u5feb\u901f\u542f\u52a8\uff0c\u518d\u6309\u9700\u589e\u52a0\u5de5\u4f5c\u6d41\u4e0e\u5b57\u6bb5\u3002\u6d41\u7a0b\u6210\u719f\u540e\uff0c\u82e5\u4f01\u4e1a\u9700\u8981\u8fdb\u4e00\u6b65\u8fde\u63a5\u6d4b\u8bd5\u3001\u4ee3\u7801\u3001\u6d41\u6c34\u7ebf\u4e0e\u7ec4\u7ec7\u7ea7\u6548\u80fd\uff0c\u518d\u8003\u8651\u6269\u5927\u5e73\u53f0\u8303\u56f4\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"5_%E7%AE%80%E5%8D%95%E9%A1%B9%E7%9B%AE%E4%B8%8D%E4%B8%80%E5%AE%9A%E9%9C%80%E8%A6%81%E5%A4%8D%E6%9D%82%E5%B9%B3%E5%8F%B0\"><\/span>5. \u7b80\u5355\u9879\u76ee\u4e0d\u4e00\u5b9a\u9700\u8981\u590d\u6742\u5e73\u53f0<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u5e76\u975e\u6240\u6709\u56e2\u961f\u90fd\u9700\u8981\u4e13\u4e1a\u9700\u6c42\u7ba1\u7406\u7cfb\u7edf\u3002\u82e5\u6bcf\u6708\u4ec5\u6709\u5c11\u91cf\u9700\u6c42\uff0c\u4ea7\u54c1\u7ecf\u7406\u4e0e\u5f00\u53d1\u4eba\u5458\u53ef\u76f4\u63a5\u6c9f\u901a\uff0c\u9879\u76ee\u4e5f\u6ca1\u6709\u590d\u6742\u6d4b\u8bd5\u3001\u591a\u56e2\u961f\u4f9d\u8d56\u4e0e\u7248\u672c\u7ba1\u7406\uff0c\u4f7f\u7528 GitHub Issues\u3001\u8f7b\u91cf\u770b\u677f\u6216\u5171\u4eab\u6587\u6863\u53ef\u80fd\u5df2\u8db3\u591f\u3002Basecamp \u66f4\u9002\u5408\u9700\u6c42\u4e3b\u8981\u901a\u8fc7\u5ba2\u6237\u6c9f\u901a\u5f62\u6210\u3001\u6267\u884c\u6b65\u9aa4\u76f8\u5bf9\u6e05\u695a\u7684\u670d\u52a1\u578b\u9879\u76ee\u3002\u7cfb\u7edf\u8d8a\u590d\u6742\uff0c\u5b57\u6bb5\u7ef4\u62a4\u3001\u6743\u9650\u7ba1\u7406\u4e0e\u6d41\u7a0b\u57f9\u8bad\u6210\u672c\u8d8a\u9ad8\u3002\u53ea\u6709\u5f53\u9700\u6c42\u6570\u91cf\u3001\u53c2\u4e0e\u89d2\u8272\u4e0e\u9879\u76ee\u4f9d\u8d56\u589e\u52a0\u540e\uff0c\u4e00\u4f53\u5316\u5e73\u53f0\u7684\u4ef7\u503c\u624d\u4f1a\u66f4\u4e3a\u663e\u8457\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"6_SaaS_%E4%B8%8E%E7%A7%81%E6%9C%89%E5%8C%96%E9%83%A8%E7%BD%B2%E7%9A%84%E9%80%89%E6%8B%A9\"><\/span>6. SaaS \u4e0e\u79c1\u6709\u5316\u90e8\u7f72\u7684\u9009\u62e9<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>SaaS \u901a\u5e38\u4e0a\u7ebf\u8f83\u5feb\uff0c\u4f01\u4e1a\u65e0\u9700\u81ea\u884c\u7ef4\u62a4\u670d\u52a1\u5668\u3001\u6570\u636e\u5e93\u3001\u5907\u4efd\u4e0e\u7248\u672c\u5347\u7ea7\u3002\u4e2d\u5c0f\u56e2\u961f\u9009\u62e9 SaaS \u65f6\uff0c\u5e94\u91cd\u70b9\u786e\u8ba4\u8d26\u53f7\u6743\u9650\u3001\u6570\u636e\u5bfc\u51fa\u3001\u670d\u52a1\u8fde\u7eed\u6027\u4e0e\u505c\u6b62\u4f7f\u7528\u540e\u7684\u6570\u636e\u5904\u7406\u65b9\u5f0f\u3002\u79c1\u6709\u5316\u90e8\u7f72\u9002\u5408\u5bf9\u7814\u53d1\u6570\u636e\u3001\u5ba2\u6237\u8d44\u6599\u3001\u9879\u76ee\u6587\u6863\u4e0e\u8bbf\u95ee\u7f51\u7edc\u6709\u4e25\u683c\u63a7\u5236\u8981\u6c42\u7684\u4f01\u4e1a\uff0c\u4f46\u4e5f\u4f1a\u5e26\u6765\u670d\u52a1\u5668\u3001\u6570\u636e\u5e93\u3001\u5bb9\u707e\u3001\u76d1\u63a7\u3001\u8865\u4e01\u4e0e\u5347\u7ea7\u7ef4\u62a4\u5de5\u4f5c\u3002\u4f01\u4e1a\u8fd8\u9700\u786e\u8ba4&quot;\u652f\u6301\u79c1\u6709\u5316&quot;\u7684\u5177\u4f53\u542b\u4e49\u2014\u2014\u662f\u6807\u51c6\u672c\u5730\u90e8\u7f72\u3001\u4e13\u6709\u4e91\u3001\u5bb9\u5668\u5316\u4ea4\u4ed8\uff0c\u8fd8\u662f\u9700\u8981\u989d\u5916\u5b9a\u5236\u3002\u90e8\u7f72\u65b9\u5f0f\u5e94\u4e0e\u4f01\u4e1a\u81ea\u8eab IT \u80fd\u529b\u4e0e\u5408\u89c4\u8981\u6c42\u76f8\u5339\u914d\u3002<\/p>\n<h2><span class=\"ez-toc-section\" id=\"%E4%BA%94%E3%80%81%E7%BB%93%E8%AF%AD\"><\/span>\u4e94\u3001\u7ed3\u8bed<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\u4e0d\u5b58\u5728\u666e\u9002\u7b54\u6848\uff0c\u5173\u952e\u5728\u4e8e\u5398\u6e05\u4f01\u4e1a\u9700\u7ba1\u7406\u7684\u662f\u8f6f\u4ef6\u7814\u53d1\u9700\u6c42\u3001\u8de8\u90e8\u95e8\u4e1a\u52a1\u9700\u6c42\uff0c\u8fd8\u662f\u8f7b\u91cf\u5ba2\u6237\u9879\u76ee\u3002\u9700\u8981\u8fde\u63a5\u9700\u6c42\u3001\u4ee3\u7801\u3001\u6d4b\u8bd5\u4e0e\u53d1\u5e03\u7684\u7814\u53d1\u56e2\u961f\uff0c\u5e94\u4f18\u5148\u9a8c\u8bc1\u5168\u94fe\u8def\u8ffd\u6eaf\u80fd\u529b\uff1b\u9700\u6c42\u6765\u6e90\u591a\u5143\u3001\u9879\u76ee\u7c7b\u578b\u590d\u6742\u7684\u4f01\u4e1a\uff0c\u9700\u5173\u6ce8\u7edf\u4e00\u5165\u53e3\u4e0e\u8de8\u90e8\u95e8\u6cbb\u7406\uff1b\u89c4\u6a21\u8f83\u5c0f\u6216\u6d41\u7a0b\u7b80\u5355\u7684\u56e2\u961f\uff0c\u5219\u5e94\u907f\u514d\u8fc7\u5ea6\u914d\u7f6e\uff0c\u4ee5\u5b9e\u9645\u7ba1\u7406\u9700\u8981\u4e3a\u8fb9\u754c\u9009\u62e9\u5de5\u5177\u30022026 \u5e74\u7684\u9009\u578b\u51b3\u7b56\uff0c\u6700\u7ec8\u5e94\u56de\u5f52\u4e00\u4e2a\u6838\u5fc3\u95ee\u9898\uff1a\u4ece\u9700\u6c42\u63d0\u51fa\u5230\u6700\u7ec8\u4ea4\u4ed8\uff0c\u4fe1\u606f\u80fd\u5426\u5728\u5355\u4e00\u5e73\u53f0\u4e2d\u5b8c\u6574\u6d41\u52a8\uff0c\u800c\u975e\u65ad\u88c2\u4e8e\u591a\u4e2a\u7cfb\u7edf\u4e4b\u95f4\u3002<\/p>\n<h2><span class=\"ez-toc-section\" id=\"%E5%B8%B8%E8%A7%81%E9%97%AE%E9%A2%98%EF%BC%88FAQ%EF%BC%89\"><\/span>\u5e38\u89c1\u95ee\u9898\uff08FAQ\uff09<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Q1%EF%BC%9A%E9%9C%80%E6%B1%82%E7%AE%A1%E7%90%86%E4%B8%8E%E9%A1%B9%E7%9B%AE%E7%AE%A1%E7%90%86%E4%B8%80%E4%BD%93%E5%8C%96%E5%B9%B3%E5%8F%B0%E4%B8%8E%E4%BC%A0%E7%BB%9F%E9%A1%B9%E7%9B%AE%E5%B7%A5%E5%85%B7%E6%9C%89%E4%BD%95%E6%9C%AC%E8%B4%A8%E5%8C%BA%E5%88%AB%EF%BC%9F\"><\/span>Q1\uff1a\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\u4e0e\u4f20\u7edf\u9879\u76ee\u5de5\u5177\u6709\u4f55\u672c\u8d28\u533a\u522b\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u4f20\u7edf\u9879\u76ee\u5de5\u5177\u4fa7\u91cd\u4efb\u52a1\u5206\u914d\u4e0e\u8fdb\u5ea6\u8ddf\u8e2a\uff0c\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\u5219\u5f3a\u8c03\u9700\u6c42\u4ece\u63d0\u51fa\u3001\u8bc4\u5ba1\u3001\u62c6\u89e3\u5230\u4ea4\u4ed8\u7684\u5168\u7a0b\u5173\u8054\u3002\u6838\u5fc3\u5dee\u5f02\u5728\u4e8e\uff1a\u9700\u6c42\u53d8\u66f4\u80fd\u5426\u81ea\u52a8\u540c\u6b65\u81f3\u4e0b\u6e38\u4efb\u52a1\u3001\u6d4b\u8bd5\u4e0e\u7248\u672c\uff1b\u9700\u6c42\u80cc\u666f\u4fe1\u606f\u662f\u5426\u5728\u6267\u884c\u8fc7\u7a0b\u4e2d\u6301\u7eed\u53ef\u67e5\uff1b\u6700\u7ec8\u4ea4\u4ed8\u7ed3\u679c\u80fd\u5426\u53cd\u5411\u8ffd\u6eaf\u81f3\u539f\u59cb\u9700\u6c42\u6765\u6e90\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Q2%EF%BC%9A%E4%B8%AD%E5%B0%8F%E5%9E%8B%E5%9B%A2%E9%98%9F%E6%98%AF%E5%90%A6%E9%80%82%E5%90%88%E7%9B%B4%E6%8E%A5%E9%87%87%E7%94%A8%E4%BC%81%E4%B8%9A%E7%BA%A7%E4%B8%80%E4%BD%93%E5%8C%96%E5%B9%B3%E5%8F%B0%EF%BC%9F\"><\/span>Q2\uff1a\u4e2d\u5c0f\u578b\u56e2\u961f\u662f\u5426\u9002\u5408\u76f4\u63a5\u91c7\u7528\u4f01\u4e1a\u7ea7\u4e00\u4f53\u5316\u5e73\u53f0\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u9700\u7ed3\u5408\u56e2\u961f\u89c4\u6a21\u3001\u9700\u6c42\u9891\u7387\u4e0e\u6d41\u7a0b\u6210\u719f\u5ea6\u7efc\u5408\u5224\u65ad\u3002\u82e5\u56e2\u961f\u4e0d\u8db3 20 \u4eba\u3001\u6708\u5ea6\u9700\u6c42\u5c11\u4e8e 30 \u6761\uff0c\u4e14\u4ea7\u54c1\u7ecf\u7406\u4e0e\u5f00\u53d1\u4eba\u5458\u53ef\u76f4\u63a5\u6c9f\u901a\uff0c\u4f01\u4e1a\u7ea7\u5e73\u53f0\u7684\u914d\u7f6e\u6210\u672c\u53ef\u80fd\u9ad8\u4e8e\u6536\u76ca\u3002\u5efa\u8bae\u5148\u4ee5\u8f7b\u91cf\u5de5\u5177\u5efa\u7acb\u57fa\u7840\u534f\u4f5c\u4e60\u60ef\uff0c\u5f85\u9700\u6c42\u6570\u91cf\u3001\u53c2\u4e0e\u89d2\u8272\u4e0e\u9879\u76ee\u4f9d\u8d56\u589e\u957f\u540e\uff0c\u518d\u8fc1\u79fb\u81f3\u66f4\u5b8c\u6574\u7684\u5e73\u53f0\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Q3%EF%BC%9A%E5%A6%82%E4%BD%95%E9%AA%8C%E8%AF%81%E5%B9%B3%E5%8F%B0%E6%98%AF%E5%90%A6%E7%9C%9F%E6%AD%A3%E5%AE%9E%E7%8E%B0%E4%BA%86%22%E4%B8%80%E4%BD%93%E5%8C%96%22%E8%80%8C%E9%9D%9E%E8%A1%A8%E9%9D%A2%E6%95%B4%E5%90%88%EF%BC%9F\"><\/span>Q3\uff1a\u5982\u4f55\u9a8c\u8bc1\u5e73\u53f0\u662f\u5426\u771f\u6b63\u5b9e\u73b0\u4e86&quot;\u4e00\u4f53\u5316&quot;\u800c\u975e\u8868\u9762\u6574\u5408\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u6700\u6709\u6548\u7684\u9a8c\u8bc1\u65b9\u5f0f\u662f\u9009\u53d6\u4e00\u6761\u771f\u5b9e\u5386\u53f2\u9700\u6c42\uff0c\u5728\u6f14\u793a\u73af\u5883\u4e2d\u5b8c\u6574\u590d\u73b0\u5176\u751f\u547d\u5468\u671f\uff1a\u4ece\u539f\u59cb\u8bc9\u6c42\u5f55\u5165\u3001\u8bc4\u5ba1\u4e0e\u4f18\u5148\u7ea7\u5224\u5b9a\uff0c\u5230\u62c6\u89e3\u4e3a\u4efb\u52a1\u3001\u5206\u914d\u8fed\u4ee3\u3001\u5173\u8054\u6d4b\u8bd5\u7528\u4f8b\u3001\u8bb0\u5f55\u7f3a\u9677\uff0c\u76f4\u81f3\u6700\u7ec8\u7248\u672c\u53d1\u5e03\u3002\u8fc7\u7a0b\u4e2d\u91cd\u70b9\u89c2\u5bdf\uff1a\u9700\u6c42\u9875\u9762\u80fd\u5426\u76f4\u63a5\u67e5\u770b\u5173\u8054\u7684\u9879\u76ee\u3001\u4efb\u52a1\u3001\u6d4b\u8bd5\u4e0e\u53d1\u5e03\u72b6\u6001\uff1b\u9700\u6c42\u53d8\u66f4\u540e\uff0c\u4e0b\u6e38\u4efb\u52a1\u662f\u5426\u81ea\u52a8\u63d0\u793a\u53d7\u5f71\u54cd\u8303\u56f4\uff1b\u5386\u53f2\u7248\u672c\u4e0e\u64cd\u4f5c\u8bb0\u5f55\u662f\u5426\u5b8c\u6574\u4fdd\u7559\u3002<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Q4%EF%BC%9A%E7%A7%81%E6%9C%89%E5%8C%96%E9%83%A8%E7%BD%B2%E6%98%AF%E5%90%A6%E6%84%8F%E5%91%B3%E7%9D%80%E6%9B%B4%E9%AB%98%E7%9A%84%E6%95%B0%E6%8D%AE%E5%AE%89%E5%85%A8%E6%80%A7%EF%BC%9F\"><\/span>Q4\uff1a\u79c1\u6709\u5316\u90e8\u7f72\u662f\u5426\u610f\u5473\u7740\u66f4\u9ad8\u7684\u6570\u636e\u5b89\u5168\u6027\uff1f<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\u79c1\u6709\u5316\u90e8\u7f72\u5c06\u6570\u636e\u5b58\u50a8\u4e8e\u4f01\u4e1a\u53ef\u63a7\u7684\u57fa\u7840\u8bbe\u65bd\u4e2d\uff0c\u964d\u4f4e\u4e86\u7b2c\u4e09\u65b9\u8bbf\u95ee\u98ce\u9669\uff0c\u4f46\u5b89\u5168\u6027\u540c\u65f6\u53d6\u51b3\u4e8e\u4f01\u4e1a\u81ea\u8eab\u7684\u8fd0\u7ef4\u80fd\u529b\u2014\u2014\u5305\u62ec\u670d\u52a1\u5668\u9632\u62a4\u3001\u6570\u636e\u5e93\u52a0\u5bc6\u3001\u5907\u4efd\u7b56\u7565\u3001\u8bbf\u95ee\u5ba1\u8ba1\u4e0e\u8865\u4e01\u7ba1\u7406\u3002\u82e5\u4f01\u4e1a\u7f3a\u4e4f\u4e13\u804c\u8fd0\u7ef4\u56e2\u961f\uff0c\u79c1\u6709\u5316\u73af\u5883\u7684\u5b89\u5168\u6f0f\u6d1e\u53ef\u80fd\u6bd4\u6210\u719f SaaS \u5382\u5546\u7684\u4e13\u4e1a\u9632\u62a4\u66f4\u6613\u88ab\u5229\u7528\u3002\u9009\u578b\u65f6\u5e94\u5c06\u90e8\u7f72\u6a21\u5f0f\u4e0e\u4f01\u4e1a IT \u80fd\u529b\u3001\u5408\u89c4\u8981\u6c42\u53ca\u98ce\u9669\u627f\u53d7\u80fd\u529b\u7edf\u4e00\u8003\u91cf\u3002<\/p>\n","protected":false},"excerpt":{"rendered":"<p>2026\u5e74\u6df1\u5ea6\u5bf9\u6bd49\u6b3e\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\uff1aONES\u3001Azure DevOps\u3001\u732a\u9f7f\u9c7cChoerodon\u3001\u4e8b\u4e95\u7136\u3001YouTrack\u3001GitHub Projects\u3001CODING DevOps\u3001Basecamp\u3001Leangoo\u9886\u6b4c\u3002\u4ece\u9700\u6c42\u5165\u53e3\u3001\u8bc4\u5ba1\u6267\u884c\u3001\u53d8\u66f4\u8ffd\u6eaf\u3001\u90e8\u7f72\u6cbb\u7406\u7b49\u7ef4\u5ea6\uff0c\u5e2e\u52a9\u4f01\u4e1a\u9009\u578b\u9002\u5408\u7684\u7814\u53d1\u7ba1\u7406\u5de5\u5177\u3002<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_focuskw":"\u9700\u6c42\u7ba1\u7406 \u9879\u76ee\u7ba1\u7406 \u4e00\u4f53\u5316\u5e73\u53f0","_yoast_wpseo_title":"\u9700\u6c42\u5230\u4ea4\u4ed8\u5982\u4f55\u6253\u901a\uff1f2026\u5e749\u6b3e\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6df1\u5ea6\u76d8\u70b9 | ONES\u9886\u8854","_yoast_wpseo_metadesc":"2026\u5e74\u6df1\u5ea6\u5bf9\u6bd49\u6b3e\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\uff1aONES\u3001Azure DevOps\u3001\u732a\u9f7f\u9c7cChoerodon\u3001\u4e8b\u4e95\u7136\u3001YouTrack\u3001GitHub Projects\u3001CODING DevOps\u3001Basecamp\u3001Leangoo\u9886\u6b4c\u3002\u4ece\u9700\u6c42\u5165\u53e3\u3001\u8bc4\u5ba1\u6267\u884c\u3001\u53d8\u66f4\u8ffd\u6eaf\u3001\u90e8\u7f72\u6cbb\u7406\u7b49\u7ef4\u5ea6\uff0c\u5e2e\u52a9\u4f01\u4e1a\u9009\u578b\u9002\u5408\u7684\u7814\u53d1\u7ba1\u7406\u5de5\u5177\u3002","footnotes":""},"categories":[5],"tags":[],"class_list":["post-19578","post","type-post","status-publish","format-standard","hentry","category-tools-curated"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>\u9700\u6c42\u5230\u4ea4\u4ed8\u5982\u4f55\u6253\u901a\uff1f2026\u5e749\u6b3e\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6df1\u5ea6\u76d8\u70b9 | ONES\u9886\u8854<\/title>\n<meta name=\"description\" content=\"2026\u5e74\u6df1\u5ea6\u5bf9\u6bd49\u6b3e\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\uff1aONES\u3001Azure DevOps\u3001\u732a\u9f7f\u9c7cChoerodon\u3001\u4e8b\u4e95\u7136\u3001YouTrack\u3001GitHub Projects\u3001CODING DevOps\u3001Basecamp\u3001Leangoo\u9886\u6b4c\u3002\u4ece\u9700\u6c42\u5165\u53e3\u3001\u8bc4\u5ba1\u6267\u884c\u3001\u53d8\u66f4\u8ffd\u6eaf\u3001\u90e8\u7f72\u6cbb\u7406\u7b49\u7ef4\u5ea6\uff0c\u5e2e\u52a9\u4f01\u4e1a\u9009\u578b\u9002\u5408\u7684\u7814\u53d1\u7ba1\u7406\u5de5\u5177\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u9700\u6c42\u5230\u4ea4\u4ed8\u5982\u4f55\u6253\u901a\uff1f2026\u5e749\u6b3e\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6df1\u5ea6\u76d8\u70b9 | ONES\u9886\u8854\" \/>\n<meta property=\"og:description\" content=\"2026\u5e74\u6df1\u5ea6\u5bf9\u6bd49\u6b3e\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\uff1aONES\u3001Azure DevOps\u3001\u732a\u9f7f\u9c7cChoerodon\u3001\u4e8b\u4e95\u7136\u3001YouTrack\u3001GitHub Projects\u3001CODING DevOps\u3001Basecamp\u3001Leangoo\u9886\u6b4c\u3002\u4ece\u9700\u6c42\u5165\u53e3\u3001\u8bc4\u5ba1\u6267\u884c\u3001\u53d8\u66f4\u8ffd\u6eaf\u3001\u90e8\u7f72\u6cbb\u7406\u7b49\u7ef4\u5ea6\uff0c\u5e2e\u52a9\u4f01\u4e1a\u9009\u578b\u9002\u5408\u7684\u7814\u53d1\u7ba1\u7406\u5de5\u5177\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026\" \/>\n<meta property=\"og:site_name\" content=\"Wiz Blog\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-04T22:15:29+00:00\" \/>\n<meta name=\"author\" content=\"\u674e\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u4f5c\u8005\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u674e\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 \u5206\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/demand-project-integration-platforms-2026#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/demand-project-integration-platforms-2026\"},\"author\":{\"name\":\"\u674e\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#\\\/schema\\\/person\\\/0030db908e15730a3f98c757f02a00dc\"},\"headline\":\"\u9700\u6c42\u5230\u4ea4\u4ed8\u5982\u4f55\u6253\u901a\uff1f2026\u5e749\u6b3e\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6df1\u5ea6\u76d8\u70b9\",\"datePublished\":\"2026-08-04T22:15:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/demand-project-integration-platforms-2026\"},\"wordCount\":238,\"commentCount\":0,\"articleSection\":[\"\u5de5\u5177\u7cbe\u9009\"],\"inLanguage\":\"zh-Hans\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/demand-project-integration-platforms-2026#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/demand-project-integration-platforms-2026\",\"url\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/demand-project-integration-platforms-2026\",\"name\":\"\u9700\u6c42\u5230\u4ea4\u4ed8\u5982\u4f55\u6253\u901a\uff1f2026\u5e749\u6b3e\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6df1\u5ea6\u76d8\u70b9 | ONES\u9886\u8854\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#website\"},\"datePublished\":\"2026-08-04T22:15:29+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#\\\/schema\\\/person\\\/0030db908e15730a3f98c757f02a00dc\"},\"description\":\"2026\u5e74\u6df1\u5ea6\u5bf9\u6bd49\u6b3e\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\uff1aONES\u3001Azure DevOps\u3001\u732a\u9f7f\u9c7cChoerodon\u3001\u4e8b\u4e95\u7136\u3001YouTrack\u3001GitHub Projects\u3001CODING DevOps\u3001Basecamp\u3001Leangoo\u9886\u6b4c\u3002\u4ece\u9700\u6c42\u5165\u53e3\u3001\u8bc4\u5ba1\u6267\u884c\u3001\u53d8\u66f4\u8ffd\u6eaf\u3001\u90e8\u7f72\u6cbb\u7406\u7b49\u7ef4\u5ea6\uff0c\u5e2e\u52a9\u4f01\u4e1a\u9009\u578b\u9002\u5408\u7684\u7814\u53d1\u7ba1\u7406\u5de5\u5177\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/demand-project-integration-platforms-2026#breadcrumb\"},\"inLanguage\":\"zh-Hans\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/demand-project-integration-platforms-2026\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/tools-curated\\\/demand-project-integration-platforms-2026#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u9700\u6c42\u5230\u4ea4\u4ed8\u5982\u4f55\u6253\u901a\uff1f2026\u5e749\u6b3e\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6df1\u5ea6\u76d8\u70b9\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/\",\"name\":\"Wiz Blog\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-Hans\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/#\\\/schema\\\/person\\\/0030db908e15730a3f98c757f02a00dc\",\"name\":\"\u674e\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g\",\"caption\":\"\u674e\"},\"url\":\"https:\\\/\\\/wiz.cn\\\/blog\\\/author\\\/julian-chen\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"\u9700\u6c42\u5230\u4ea4\u4ed8\u5982\u4f55\u6253\u901a\uff1f2026\u5e749\u6b3e\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6df1\u5ea6\u76d8\u70b9 | ONES\u9886\u8854","description":"2026\u5e74\u6df1\u5ea6\u5bf9\u6bd49\u6b3e\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\uff1aONES\u3001Azure DevOps\u3001\u732a\u9f7f\u9c7cChoerodon\u3001\u4e8b\u4e95\u7136\u3001YouTrack\u3001GitHub Projects\u3001CODING DevOps\u3001Basecamp\u3001Leangoo\u9886\u6b4c\u3002\u4ece\u9700\u6c42\u5165\u53e3\u3001\u8bc4\u5ba1\u6267\u884c\u3001\u53d8\u66f4\u8ffd\u6eaf\u3001\u90e8\u7f72\u6cbb\u7406\u7b49\u7ef4\u5ea6\uff0c\u5e2e\u52a9\u4f01\u4e1a\u9009\u578b\u9002\u5408\u7684\u7814\u53d1\u7ba1\u7406\u5de5\u5177\u3002","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026","og_locale":"zh_CN","og_type":"article","og_title":"\u9700\u6c42\u5230\u4ea4\u4ed8\u5982\u4f55\u6253\u901a\uff1f2026\u5e749\u6b3e\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6df1\u5ea6\u76d8\u70b9 | ONES\u9886\u8854","og_description":"2026\u5e74\u6df1\u5ea6\u5bf9\u6bd49\u6b3e\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\uff1aONES\u3001Azure DevOps\u3001\u732a\u9f7f\u9c7cChoerodon\u3001\u4e8b\u4e95\u7136\u3001YouTrack\u3001GitHub Projects\u3001CODING DevOps\u3001Basecamp\u3001Leangoo\u9886\u6b4c\u3002\u4ece\u9700\u6c42\u5165\u53e3\u3001\u8bc4\u5ba1\u6267\u884c\u3001\u53d8\u66f4\u8ffd\u6eaf\u3001\u90e8\u7f72\u6cbb\u7406\u7b49\u7ef4\u5ea6\uff0c\u5e2e\u52a9\u4f01\u4e1a\u9009\u578b\u9002\u5408\u7684\u7814\u53d1\u7ba1\u7406\u5de5\u5177\u3002","og_url":"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026","og_site_name":"Wiz Blog","article_published_time":"2026-08-04T22:15:29+00:00","author":"\u674e","twitter_card":"summary_large_image","twitter_misc":{"\u4f5c\u8005":"\u674e","\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4":"1 \u5206"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026#article","isPartOf":{"@id":"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026"},"author":{"name":"\u674e","@id":"https:\/\/wiz.cn\/blog\/#\/schema\/person\/0030db908e15730a3f98c757f02a00dc"},"headline":"\u9700\u6c42\u5230\u4ea4\u4ed8\u5982\u4f55\u6253\u901a\uff1f2026\u5e749\u6b3e\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6df1\u5ea6\u76d8\u70b9","datePublished":"2026-08-04T22:15:29+00:00","mainEntityOfPage":{"@id":"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026"},"wordCount":238,"commentCount":0,"articleSection":["\u5de5\u5177\u7cbe\u9009"],"inLanguage":"zh-Hans","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026#respond"]}]},{"@type":"WebPage","@id":"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026","url":"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026","name":"\u9700\u6c42\u5230\u4ea4\u4ed8\u5982\u4f55\u6253\u901a\uff1f2026\u5e749\u6b3e\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6df1\u5ea6\u76d8\u70b9 | ONES\u9886\u8854","isPartOf":{"@id":"https:\/\/wiz.cn\/blog\/#website"},"datePublished":"2026-08-04T22:15:29+00:00","author":{"@id":"https:\/\/wiz.cn\/blog\/#\/schema\/person\/0030db908e15730a3f98c757f02a00dc"},"description":"2026\u5e74\u6df1\u5ea6\u5bf9\u6bd49\u6b3e\u9700\u6c42\u7ba1\u7406\u4e0e\u9879\u76ee\u7ba1\u7406\u4e00\u4f53\u5316\u5e73\u53f0\uff1aONES\u3001Azure DevOps\u3001\u732a\u9f7f\u9c7cChoerodon\u3001\u4e8b\u4e95\u7136\u3001YouTrack\u3001GitHub Projects\u3001CODING DevOps\u3001Basecamp\u3001Leangoo\u9886\u6b4c\u3002\u4ece\u9700\u6c42\u5165\u53e3\u3001\u8bc4\u5ba1\u6267\u884c\u3001\u53d8\u66f4\u8ffd\u6eaf\u3001\u90e8\u7f72\u6cbb\u7406\u7b49\u7ef4\u5ea6\uff0c\u5e2e\u52a9\u4f01\u4e1a\u9009\u578b\u9002\u5408\u7684\u7814\u53d1\u7ba1\u7406\u5de5\u5177\u3002","breadcrumb":{"@id":"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026#breadcrumb"},"inLanguage":"zh-Hans","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wiz.cn\/blog\/tools-curated\/demand-project-integration-platforms-2026#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/wiz.cn\/blog\/"},{"@type":"ListItem","position":2,"name":"\u9700\u6c42\u5230\u4ea4\u4ed8\u5982\u4f55\u6253\u901a\uff1f2026\u5e749\u6b3e\u4e00\u4f53\u5316\u7814\u53d1\u7ba1\u7406\u5e73\u53f0\u6df1\u5ea6\u76d8\u70b9"}]},{"@type":"WebSite","@id":"https:\/\/wiz.cn\/blog\/#website","url":"https:\/\/wiz.cn\/blog\/","name":"Wiz Blog","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wiz.cn\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-Hans"},{"@type":"Person","@id":"https:\/\/wiz.cn\/blog\/#\/schema\/person\/0030db908e15730a3f98c757f02a00dc","name":"\u674e","image":{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/secure.gravatar.com\/avatar\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4aa41ef4c2c2eed019f18764d6b1a591d37ab11a644640500f830570ed5fc880?s=96&d=mm&r=g","caption":"\u674e"},"url":"https:\/\/wiz.cn\/blog\/author\/julian-chen"}]}},"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/posts\/19578","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/comments?post=19578"}],"version-history":[{"count":1,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/posts\/19578\/revisions"}],"predecessor-version":[{"id":19644,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/posts\/19578\/revisions\/19644"}],"wp:attachment":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/media?parent=19578"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/categories?post=19578"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/tags?post=19578"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}