{"name":"Wiz Blog","description":"","url":"https:\/\/wiz.cn\/blog","home":"https:\/\/wiz.cn\/blog","gmt_offset":8,"timezone_string":"Asia\/Shanghai","page_for_posts":0,"page_on_front":0,"show_on_front":"posts","namespaces":["oembed\/1.0","code-snippets\/v1","yoast\/v1","wp\/v2","wp-site-health\/v1","wp-block-editor\/v1","wp-abilities\/v1"],"authentication":{"application-passwords":{"endpoints":{"authorization":"https:\/\/wiz.cn\/blog\/wp-admin\/authorize-application.php"}}},"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/"}]}},"\/batch\/v1":{"namespace":"","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"validation":{"type":"string","enum":["require-all-validate","normal"],"default":"normal","required":false},"requests":{"type":"array","maxItems":25,"items":{"type":"object","properties":{"method":{"type":"string","enum":["POST","PUT","PATCH","DELETE"],"default":"POST"},"path":{"type":"string","required":true},"body":{"type":"object","properties":[],"additionalProperties":true},"headers":{"type":"object","properties":[],"additionalProperties":{"type":["string","array"],"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/batch\/v1"}]}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"oembed\/1.0","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/oembed\/1.0"}]}},"\/oembed\/1.0\/embed":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"\u9700\u8981\u83b7\u53d6 oEmbed \u6570\u636e\u7684\u94fe\u63a5\u3002","type":"string","format":"uri","required":true},"format":{"default":"json","required":false},"maxwidth":{"default":600,"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/oembed\/1.0\/embed"}]}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"\u9700\u8981\u83b7\u53d6 oEmbed \u6570\u636e\u7684\u94fe\u63a5\u3002","type":"string","format":"uri","required":true},"format":{"description":"\u4f7f\u7528\u7684 oEmbed \u683c\u5f0f\u3002","type":"string","default":"json","enum":["json","xml"],"required":false},"maxwidth":{"description":"\u5d4c\u5165\u7684\u5143\u7d20\u7684\u6700\u5927\u5bbd\u5ea6\uff08\u50cf\u7d20\uff09\u3002","type":"integer","default":600,"required":false},"maxheight":{"description":"\u5d4c\u5165\u7684\u5143\u7d20\u7684\u6700\u5927\u9ad8\u5ea6\uff08\u50cf\u7d20\uff09\u3002","type":"integer","required":false},"discover":{"description":"\u5bf9\u672a\u7ecf\u6279\u51c6\u7684\u63d0\u4f9b\u8005\u662f\u5426\u8fdb\u884c oEmbed \u53d1\u73b0\u8bf7\u6c42\u3002","type":"boolean","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/oembed\/1.0\/proxy"}]}},"\/code-snippets\/v1":{"namespace":"code-snippets\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"code-snippets\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/code-snippets\/v1"}]}},"\/code-snippets\/v1\/snippets":{"namespace":"code-snippets\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false}}},{"methods":["POST"],"args":{"name":{"description":"Descriptive title for the snippet.","type":"string","required":false},"desc":{"description":"Descriptive text associated with snippet.","type":"string","required":false},"code":{"description":"Executable snippet code.","type":"string","required":false},"tags":{"description":"List of tag categories the snippet belongs to.","type":"array","items":{"type":"string"},"required":false},"scope":{"description":"Context in which the snippet is executable.","type":"string","required":false},"condition_id":{"description":"Identifier of condition linked to this snippet.","type":"integer","required":false},"active":{"description":"Snippet activation status.","type":"boolean","required":false},"priority":{"description":"Relative priority in which the snippet is executed.","type":"integer","required":false},"network":{"description":"Whether the snippet is network-wide instead of site-wide.","type":["boolean","null"],"required":false},"shared_network":{"description":"If a network snippet, whether can be activated on discrete sites instead of network-wide.","type":["boolean","null"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/code-snippets\/v1\/snippets"}]}},"\/code-snippets\/v1\/snippets\/(?P<id>[\\d]+)":{"namespace":"code-snippets\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"name":{"description":"Descriptive title for the snippet.","type":"string","required":false},"desc":{"description":"Descriptive text associated with snippet.","type":"string","required":false},"code":{"description":"Executable snippet code.","type":"string","required":false},"tags":{"description":"List of tag categories the snippet belongs to.","type":"array","items":{"type":"string"},"required":false},"scope":{"description":"Context in which the snippet is executable.","type":"string","required":false},"condition_id":{"description":"Identifier of condition linked to this snippet.","type":"integer","required":false},"active":{"description":"Snippet activation status.","type":"boolean","required":false},"priority":{"description":"Relative priority in which the snippet is executed.","type":"integer","required":false},"network":{"description":"Whether the snippet is network-wide instead of site-wide.","type":["boolean","null"],"required":false},"shared_network":{"description":"If a network snippet, whether can be activated on discrete sites instead of network-wide.","type":["boolean","null"],"required":false}}},{"methods":["DELETE"],"args":[]}]},"\/code-snippets\/v1\/snippets\/schema":{"namespace":"code-snippets\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/code-snippets\/v1\/snippets\/schema"}]}},"\/code-snippets\/v1\/snippets\/(?P<id>[\\d]+)\/activate":{"namespace":"code-snippets\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/code-snippets\/v1\/snippets\/(?P<id>[\\d]+)\/deactivate":{"namespace":"code-snippets\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/code-snippets\/v1\/snippets\/(?P<id>[\\d]+)\/export":{"namespace":"code-snippets\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/code-snippets\/v1\/snippets\/(?P<id>[\\d]+)\/export-code":{"namespace":"code-snippets\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/code-snippets\/v1\/insert-headers-and-footers":{"namespace":"code-snippets\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/code-snippets\/v1\/insert-headers-and-footers"}]}},"\/code-snippets\/v1\/insert-headers-and-footers\/import":{"namespace":"code-snippets\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"ids":{"type":"array","required":false},"network":{"type":"boolean","required":false},"auto_add_tags":{"type":"boolean","required":false},"tag_value":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/code-snippets\/v1\/insert-headers-and-footers\/import"}]}},"\/code-snippets\/v1\/header-footer-code-manager":{"namespace":"code-snippets\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/code-snippets\/v1\/header-footer-code-manager"}]}},"\/code-snippets\/v1\/header-footer-code-manager\/import":{"namespace":"code-snippets\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"ids":{"type":"array","required":false},"network":{"type":"boolean","required":false},"auto_add_tags":{"type":"boolean","required":false},"tag_value":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/code-snippets\/v1\/header-footer-code-manager\/import"}]}},"\/code-snippets\/v1\/insert-php-code-snippet":{"namespace":"code-snippets\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/code-snippets\/v1\/insert-php-code-snippet"}]}},"\/code-snippets\/v1\/insert-php-code-snippet\/import":{"namespace":"code-snippets\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"ids":{"type":"array","required":false},"network":{"type":"boolean","required":false},"auto_add_tags":{"type":"boolean","required":false},"tag_value":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/code-snippets\/v1\/insert-php-code-snippet\/import"}]}},"\/code-snippets\/v1\/importers":{"namespace":"code-snippets\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/code-snippets\/v1\/importers"}]}},"\/code-snippets\/v1\/file-upload\/parse":{"namespace":"code-snippets\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/code-snippets\/v1\/file-upload\/parse"}]}},"\/code-snippets\/v1\/file-upload\/import":{"namespace":"code-snippets\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"snippets":{"description":"Array of snippet data to import","type":"array","required":true},"duplicate_action":{"description":"Action to take when duplicate snippets are found","type":"string","enum":["ignore","replace","skip"],"default":"ignore","required":false},"network":{"description":"Whether to import to network table","type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/code-snippets\/v1\/file-upload\/import"}]}},"\/yoast\/v1":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"yoast\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1"}]}},"\/yoast\/v1\/file_size":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"type":"string","description":"The url to retrieve","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/file_size"}]}},"\/yoast\/v1\/statistics":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/statistics"}]}},"\/yoast\/v1\/ai_generator\/callback":{"namespace":"yoast\/v1","methods":["POST","POST"],"endpoints":[{"methods":["POST"],"args":{"access_jwt":{"type":"string","description":"The access JWT.","required":true},"refresh_jwt":{"type":"string","description":"The JWT to be used when the access JWT needs to be refreshed.","required":true},"code_challenge":{"type":"string","description":"The SHA266 of the verification code used to check the authenticity of a callback call.","required":true},"user_id":{"type":"integer","description":"The id of the user associated to the code verifier.","required":true}}},{"methods":["POST"],"args":{"access_jwt":{"type":"string","description":"The access JWT.","required":true},"refresh_jwt":{"type":"string","description":"The JWT to be used when the access JWT needs to be refreshed.","required":true},"code_challenge":{"type":"string","description":"The SHA266 of the verification code used to check the authenticity of a callback call.","required":true},"user_id":{"type":"integer","description":"The id of the user associated to the code verifier.","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/ai_generator\/callback"}]}},"\/yoast\/v1\/ai_generator\/refresh_callback":{"namespace":"yoast\/v1","methods":["POST","POST"],"endpoints":[{"methods":["POST"],"args":{"access_jwt":{"type":"string","description":"The access JWT.","required":true},"refresh_jwt":{"type":"string","description":"The JWT to be used when the access JWT needs to be refreshed.","required":true},"code_challenge":{"type":"string","description":"The SHA266 of the verification code used to check the authenticity of a callback call.","required":true},"user_id":{"type":"integer","description":"The id of the user associated to the code verifier.","required":true}}},{"methods":["POST"],"args":{"access_jwt":{"type":"string","description":"The access JWT.","required":true},"refresh_jwt":{"type":"string","description":"The JWT to be used when the access JWT needs to be refreshed.","required":true},"code_challenge":{"type":"string","description":"The SHA266 of the verification code used to check the authenticity of a callback call.","required":true},"user_id":{"type":"integer","description":"The id of the user associated to the code verifier.","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/ai_generator\/refresh_callback"}]}},"\/yoast\/v1\/ai_generator\/consent":{"namespace":"yoast\/v1","methods":["POST","POST"],"endpoints":[{"methods":["POST"],"args":{"consent":{"type":"boolean","description":"Whether the consent to use AI-based services has been given by the user.","required":true}}},{"methods":["POST"],"args":{"consent":{"type":"boolean","description":"Whether the consent to use AI-based services has been given by the user.","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/ai_generator\/consent"}]}},"\/yoast\/v1\/ai_content_planner\/banner_permanent_dismissal":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"is_dismissed":{"type":"bool","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/ai_content_planner\/banner_permanent_dismissal"}]}},"\/yoast\/v1\/ai_content_planner\/get_outline":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_type":{"type":"string","description":"The post type to get a content outline for.","required":true},"language":{"type":"string","description":"The language the content is written in.","required":true},"editor":{"type":"string","enum":["classic","elementor","gutenberg"],"description":"The current editor.","required":true},"title":{"type":"string","description":"The title of the chosen content suggestion.","required":true},"intent":{"type":"string","description":"The intent of the chosen content suggestion.","required":true},"explanation":{"type":"string","description":"The explanation of the chosen content suggestion.","required":true},"keyphrase":{"type":"string","description":"The keyphrase of the chosen content suggestion.","required":true},"meta_description":{"type":"string","description":"The meta description of the chosen content suggestion.","required":true},"category":{"type":"object","properties":{"name":{"type":"string","required":true},"id":{"type":"integer","required":true}},"description":"The category of the chosen content suggestion. Use name \"\" and id -1 to indicate no category.","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/ai_content_planner\/get_outline"}]}},"\/yoast\/v1\/ai_content_planner\/get_suggestions":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"post_type":{"type":"string","description":"The post type to get content suggestions for.","required":true},"language":{"type":"string","description":"The language the content is written in.","required":true},"editor":{"type":"string","enum":["classic","elementor","gutenberg"],"description":"The current editor.","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/ai_content_planner\/get_suggestions"}]}},"\/yoast\/v1\/ai\/free_sparks":{"namespace":"yoast\/v1","methods":["POST","POST"],"endpoints":[{"methods":["POST"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/ai\/free_sparks"}]}},"\/yoast\/v1\/ai_generator\/bust_subscription_cache":{"namespace":"yoast\/v1","methods":["POST","POST"],"endpoints":[{"methods":["POST"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/ai_generator\/bust_subscription_cache"}]}},"\/yoast\/v1\/ai_generator\/get_suggestions":{"namespace":"yoast\/v1","methods":["POST","POST"],"endpoints":[{"methods":["POST"],"args":{"type":{"type":"string","enum":["seo-title","meta-description","product-seo-title","product-meta-description","product-taxonomy-seo-title","product-taxonomy-meta-description","taxonomy-seo-title","taxonomy-meta-description"],"description":"The type of suggestion requested.","required":true},"prompt_content":{"type":"string","description":"The content needed by the prompt to ask for suggestions.","required":true},"focus_keyphrase":{"type":"string","description":"The focus keyphrase associated to the post.","required":true},"language":{"type":"string","description":"The language the post is written in.","required":true},"platform":{"type":"string","enum":["Google","Facebook","Twitter"],"description":"The platform the post is intended for.","required":true},"editor":{"type":"string","enum":["classic","elementor","gutenberg"],"description":"The current editor.","required":true}}},{"methods":["POST"],"args":{"type":{"type":"string","enum":["seo-title","meta-description","product-seo-title","product-meta-description","product-taxonomy-seo-title","product-taxonomy-meta-description","taxonomy-seo-title","taxonomy-meta-description"],"description":"The type of suggestion requested.","required":true},"prompt_content":{"type":"string","description":"The content needed by the prompt to ask for suggestions.","required":true},"focus_keyphrase":{"type":"string","description":"The focus keyphrase associated to the post.","required":true},"language":{"type":"string","description":"The language the post is written in.","required":true},"platform":{"type":"string","enum":["Google","Facebook","Twitter"],"description":"The platform the post is intended for.","required":true},"editor":{"type":"string","enum":["classic","elementor","gutenberg"],"description":"The current editor.","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/ai_generator\/get_suggestions"}]}},"\/yoast\/v1\/ai_generator\/get_usage":{"namespace":"yoast\/v1","methods":["POST","POST"],"endpoints":[{"methods":["POST"],"args":{"is_woo_product_entity":{"type":"boolean","default":false,"required":false}}},{"methods":["POST"],"args":{"is_woo_product_entity":{"type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/ai_generator\/get_usage"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"postTypeName":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"taxonomyName":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy"}]}},"\/yoast\/v1\/site_kit_configuration_permanent_dismissal":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"is_dismissed":{"type":"bool","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/site_kit_configuration_permanent_dismissal"}]}},"\/yoast\/v1\/readability_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/readability_scores"}]}},"\/yoast\/v1\/seo_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/seo_scores"}]}},"\/yoast\/v1\/setup_steps_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"setup_widget_loaded":{"type":"string","enum":["yes","no"],"required":false},"first_interaction_stage":{"type":"string","enum":["install","activate","setup","grantConsent","successfullyConnected"],"required":false},"last_interaction_stage":{"type":"string","enum":["install","activate","setup","grantConsent","successfullyConnected"],"required":false},"setup_widget_temporarily_dismissed":{"type":"string","enum":["yes","no"],"required":false},"setup_widget_permanently_dismissed":{"type":"string","enum":["yes","no"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/setup_steps_tracking"}]}},"\/yoast\/v1\/introductions\/(?P<introduction_id>[\\w-]+)\/seen":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"introduction_id":{"type":"string","required":true},"is_seen":{"type":"bool","default":true,"required":false}}}]},"\/yoast\/v1\/wistia_embed_permission":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"value":{"type":"bool","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/wistia_embed_permission"}]}},"\/yoast\/v1\/available_posts":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"search":{"type":"string","default":"","required":false},"postType":{"type":"string","default":"page","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/available_posts"}]}},"\/yoast\/v1\/alerts\/dismiss":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"key":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/alerts\/dismiss"}]}},"\/yoast\/v1\/configuration\/site_representation":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"company_or_person":{"type":"string","enum":["company","person"],"required":true},"company_name":{"type":"string","required":false},"company_logo":{"type":"string","required":false},"company_logo_id":{"type":"integer","required":false},"person_logo":{"type":"string","required":false},"person_logo_id":{"type":"integer","required":false},"company_or_person_user_id":{"type":"integer","required":false},"description":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/configuration\/site_representation"}]}},"\/yoast\/v1\/configuration\/social_profiles":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"facebook_site":{"type":"string","required":false},"twitter_site":{"type":"string","required":false},"other_social_urls":{"type":"array","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/configuration\/social_profiles"}]}},"\/yoast\/v1\/configuration\/check_capability":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"user_id":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/configuration\/check_capability"}]}},"\/yoast\/v1\/configuration\/enable_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"tracking":{"type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/configuration\/enable_tracking"}]}},"\/yoast\/v1\/configuration\/save_configuration_state":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"finishedSteps":{"type":"array","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/configuration\/save_configuration_state"}]}},"\/yoast\/v1\/configuration\/get_configuration_state":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/configuration\/get_configuration_state"}]}},"\/yoast\/v1\/import\/(?P<plugin>[\\w-]+)\/(?P<type>[\\w-]+)":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/yoast\/v1\/get_head":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/get_head"}]}},"\/yoast\/v1\/indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/indexing\/posts"}]}},"\/yoast\/v1\/indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/indexing\/terms"}]}},"\/yoast\/v1\/indexing\/post-type-archives":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/indexing\/post-type-archives"}]}},"\/yoast\/v1\/indexing\/general":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/indexing\/general"}]}},"\/yoast\/v1\/indexing\/prepare":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/indexing\/prepare"}]}},"\/yoast\/v1\/indexing\/indexables-complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/indexing\/indexables-complete"}]}},"\/yoast\/v1\/indexing\/complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/indexing\/complete"}]}},"\/yoast\/v1\/link-indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/link-indexing\/posts"}]}},"\/yoast\/v1\/link-indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/link-indexing\/terms"}]}},"\/yoast\/v1\/integrations\/set_active":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"active":{"type":"boolean","required":true},"integration":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/integrations\/set_active"}]}},"\/yoast\/v1\/meta\/search":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/meta\/search"}]}},"\/yoast\/v1\/semrush\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/semrush\/authenticate"}]}},"\/yoast\/v1\/semrush\/country_code":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"country_code":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/semrush\/country_code"}]}},"\/yoast\/v1\/semrush\/related_keyphrases":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"keyphrase":{"required":true},"country_code":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/semrush\/related_keyphrases"}]}},"\/yoast\/v1\/wincher\/authorization-url":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/wincher\/authorization-url"}]}},"\/yoast\/v1\/wincher\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true},"websiteId":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/wincher\/authenticate"}]}},"\/yoast\/v1\/wincher\/keyphrases\/track":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/wincher\/keyphrases\/track"}]}},"\/yoast\/v1\/wincher\/keyphrases":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":false},"permalink":{"required":false},"startAt":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/wincher\/keyphrases"}]}},"\/yoast\/v1\/wincher\/keyphrases\/untrack":{"namespace":"yoast\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/wincher\/keyphrases\/untrack"}]}},"\/yoast\/v1\/wincher\/account\/limit":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/wincher\/account\/limit"}]}},"\/yoast\/v1\/wincher\/account\/upgrade-campaign":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/wincher\/account\/upgrade-campaign"}]}},"\/yoast\/v1\/workouts":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/workouts"}]}},"\/yoast\/v1\/complete_task":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"options":{"type":"object","properties":{"task":{"type":"string","required":true,"sanitize_callback":"sanitize_text_field"}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/complete_task"}]}},"\/yoast\/v1\/get_tasks":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"options":{"type":"object","properties":{"filter":{"type":"string","required":false,"sanitize_callback":"sanitize_text_field"},"limit":{"type":"int","required":false,"sanitize_callback":"absint"}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/get_tasks"}]}},"\/yoast\/v1\/action_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"action":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/yoast\/v1\/action_tracking"}]}},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2"}]}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"after":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u540e\u53d1\u5e03\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"modified_after":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u4e3a\u4e00\u4e2a\u7ed9\u5b9a\u7684\u65e5\u671f\uff08ISO 8601 \u517c\u5bb9\u683c\u5f0f\uff09\u4e4b\u540e\u4fee\u6539\u8fc7\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"author":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a\u7ed9\u7279\u5b9a\u4f5c\u8005\u7684\u6587\u7ae0\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a\u7ed9\u7279\u5b9a\u4f5c\u8005\u7684\u6587\u7ae0\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u524d\u53d1\u5e03\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"modified_before":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u4e3a\u4e00\u4e2a\u7ed9\u5b9a\u7684\u65e5\u671f\uff08ISO 8601 \u517c\u5bb9\u683c\u5f0f\uff09\u4e4b\u524d\u4fee\u6539\u8fc7\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"\u5982\u4f55\u89e3\u91ca\u641c\u7d22\u8f93\u5165\u3002","type":"string","enum":["exact"],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u6587\u7ae0\u5c5e\u6027\u5bf9\u96c6\u5408\u8fdb\u884c\u6392\u5e8f\u3002","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"\u9700\u8981\u641c\u7d22\u7684\u680f\u4f4d\u540d\u79f0\u7ec4\u3002","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u7279\u5b9a\u522b\u540d\u7684\u6587\u7ae0\u3002","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u72b6\u6001\u7684\u6587\u7ae0\u3002","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"\u57fa\u4e8e\u591a\u4e2a\u5206\u7c7b\u6cd5\u95f4\u7684\u5173\u7cfb\u9650\u5236\u7ed3\u679c\u96c6\u3002","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5728 categories \u5206\u7c7b\u6cd5\u4e2d\u6307\u5b9a\u4e86\u7279\u5b9a\u9879\u76ee\u7684\u9879\u76ee\u3002","type":["object","array"],"oneOf":[{"title":"\u672f\u8bed ID \u5217\u8868","description":"\u5c06\u9879\u76ee\u4e0e\u5217\u51fa\u7684 ID \u76f8\u5339\u914d\u3002","type":"array","items":{"type":"integer"}},{"title":"\u672f\u8bed ID \u5206\u7c7b\u6cd5\u67e5\u8be2\u3002","description":"\u8fdb\u884c\u4e00\u9879\u9ad8\u7ea7\u9879\u76ee\u67e5\u8be2\u3002","type":"object","properties":{"terms":{"description":"\u672f\u8bed ID\u3002","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"\u662f\u5426\u5728\u9650\u5236\u7ed3\u679c\u96c6\u7684\u9879\u76ee\u4e2d\u5305\u542b\u5b50\u9879\u76ee\u3002","type":"boolean","default":false},"operator":{"description":"\u9879\u76ee\u662f\u5426\u5fc5\u987b\u5206\u914d\u6240\u6709\u6216\u4efb\u4f55\u6307\u5b9a\u7684\u672f\u8bed\u3002","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5728 categories \u5206\u7c7b\u6cd5\u4e2d\u672a\u6307\u5b9a\u7279\u5b9a\u9879\u76ee\u7684\u9879\u76ee\u3002","type":["object","array"],"oneOf":[{"title":"\u672f\u8bed ID \u5217\u8868","description":"\u5c06\u9879\u76ee\u4e0e\u5217\u51fa\u7684 ID \u76f8\u5339\u914d\u3002","type":"array","items":{"type":"integer"}},{"title":"\u672f\u8bed ID \u5206\u7c7b\u6cd5\u67e5\u8be2\u3002","description":"\u8fdb\u884c\u4e00\u9879\u9ad8\u7ea7\u9879\u76ee\u67e5\u8be2\u3002","type":"object","properties":{"terms":{"description":"\u672f\u8bed ID\u3002","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"\u662f\u5426\u5728\u9650\u5236\u7ed3\u679c\u96c6\u7684\u9879\u76ee\u4e2d\u5305\u542b\u5b50\u9879\u76ee\u3002","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5728 tags \u5206\u7c7b\u6cd5\u4e2d\u6307\u5b9a\u4e86\u7279\u5b9a\u9879\u76ee\u7684\u9879\u76ee\u3002","type":["object","array"],"oneOf":[{"title":"\u672f\u8bed ID \u5217\u8868","description":"\u5c06\u9879\u76ee\u4e0e\u5217\u51fa\u7684 ID \u76f8\u5339\u914d\u3002","type":"array","items":{"type":"integer"}},{"title":"\u672f\u8bed ID \u5206\u7c7b\u6cd5\u67e5\u8be2\u3002","description":"\u8fdb\u884c\u4e00\u9879\u9ad8\u7ea7\u9879\u76ee\u67e5\u8be2\u3002","type":"object","properties":{"terms":{"description":"\u672f\u8bed ID\u3002","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"\u9879\u76ee\u662f\u5426\u5fc5\u987b\u5206\u914d\u6240\u6709\u6216\u4efb\u4f55\u6307\u5b9a\u7684\u672f\u8bed\u3002","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5728 tags \u5206\u7c7b\u6cd5\u4e2d\u672a\u6307\u5b9a\u7279\u5b9a\u9879\u76ee\u7684\u9879\u76ee\u3002","type":["object","array"],"oneOf":[{"title":"\u672f\u8bed ID \u5217\u8868","description":"\u5c06\u9879\u76ee\u4e0e\u5217\u51fa\u7684 ID \u76f8\u5339\u914d\u3002","type":"array","items":{"type":"integer"}},{"title":"\u672f\u8bed ID \u5206\u7c7b\u6cd5\u67e5\u8be2\u3002","description":"\u8fdb\u884c\u4e00\u9879\u9ad8\u7ea7\u9879\u76ee\u67e5\u8be2\u3002","type":"object","properties":{"terms":{"description":"\u672f\u8bed ID\u3002","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"sticky":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u7f6e\u9876\u9879\u76ee\u3002","type":"boolean","required":false},"ignore_sticky":{"description":"\u662f\u5426\u5ffd\u7565\u7f6e\u9876\u6587\u7ae0\u3002","type":"boolean","default":true,"required":false},"format":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5206\u914d\u4e00\u4e2a\u6216\u591a\u4e2a\u6307\u5b9a\u683c\u5f0f\u7684\u9879\u3002","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"\u7528\u6765\u4fdd\u62a4\u5185\u5bb9\u548c\u6458\u8981\u7684\u5bc6\u7801\u3002","type":"string","required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6807\u9898\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u5185\u5bb9\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"\u8be5\u6587\u7ae0\u6240\u4f7f\u7528\u7684\u5185\u5bb9\u533a\u5757\u683c\u5f0f\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"\u5185\u5bb9\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"\u6587\u7ae0\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false},"excerpt":{"description":"\u8be5\u7bc7\u6587\u7ae0\u7684\u6458\u8981\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6458\u8981\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6458\u8981\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"\u6458\u8981\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"\u6587\u7ae0\u7684\u7279\u8272\u5a92\u4f53 ID\u3002","type":"integer","required":false},"comment_status":{"description":"\u6587\u7ae0\u662f\u5426\u5f00\u653e\u8bc4\u8bba\u3002","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"\u6587\u7ae0\u662f\u5426\u63a5\u53d7 Ping\u3002","type":"string","enum":["open","closed"],"required":false},"format":{"description":"\u6587\u7ae0\u7684\u5f62\u5f0f\u3002","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"_yoast_wpseo_focuskw":{"type":"string","title":"","description":"Yoast SEO Focus Keyword","default":""},"_yoast_wpseo_title":{"type":"string","title":"","description":"Yoast SEO Title","default":""},"_yoast_wpseo_metadesc":{"type":"string","title":"","description":"Yoast SEO Meta Description","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"\u6587\u7ae0\u662f\u5426\u4e3a\u7f6e\u9876\u3002","type":"boolean","required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false},"categories":{"description":"\u5728 category \u5206\u7c7b\u6cd5\u4e2d\u5206\u914d\u7ed9\u8be5\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"\u5728 post_tag \u5206\u7c7b\u6cd5\u4e2d\u5206\u914d\u7ed9\u8be5\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/posts"}]}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"\u8986\u76d6\u9ed8\u8ba4\u6458\u8981\u957f\u5ea6\u3002","type":"integer","required":false},"password":{"description":"\u8be5\u6587\u7ae0\u7684\u5bc6\u7801\uff0c\u5982\u6587\u7ae0\u53d7\u5bc6\u7801\u4fdd\u62a4\u3002","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"\u7528\u6765\u4fdd\u62a4\u5185\u5bb9\u548c\u6458\u8981\u7684\u5bc6\u7801\u3002","type":"string","required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6807\u9898\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u5185\u5bb9\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"\u8be5\u6587\u7ae0\u6240\u4f7f\u7528\u7684\u5185\u5bb9\u533a\u5757\u683c\u5f0f\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"\u5185\u5bb9\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"\u6587\u7ae0\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false},"excerpt":{"description":"\u8be5\u7bc7\u6587\u7ae0\u7684\u6458\u8981\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6458\u8981\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6458\u8981\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"\u6458\u8981\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"\u6587\u7ae0\u7684\u7279\u8272\u5a92\u4f53 ID\u3002","type":"integer","required":false},"comment_status":{"description":"\u6587\u7ae0\u662f\u5426\u5f00\u653e\u8bc4\u8bba\u3002","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"\u6587\u7ae0\u662f\u5426\u63a5\u53d7 Ping\u3002","type":"string","enum":["open","closed"],"required":false},"format":{"description":"\u6587\u7ae0\u7684\u5f62\u5f0f\u3002","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"_yoast_wpseo_focuskw":{"type":"string","title":"","description":"Yoast SEO Focus Keyword","default":""},"_yoast_wpseo_title":{"type":"string","title":"","description":"Yoast SEO Title","default":""},"_yoast_wpseo_metadesc":{"type":"string","title":"","description":"Yoast SEO Meta Description","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"\u6587\u7ae0\u662f\u5426\u4e3a\u7f6e\u9876\u3002","type":"boolean","required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false},"categories":{"description":"\u5728 category \u5206\u7c7b\u6cd5\u4e2d\u5206\u914d\u7ed9\u8be5\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"\u5728 post_tag \u5206\u7c7b\u6cd5\u4e2d\u5206\u914d\u7ed9\u8be5\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u662f\u5426\u7ed5\u8fc7\u56de\u6536\u7ad9\u5e76\u5f3a\u884c\u5220\u9664\u3002","required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u4fee\u8ba2\u7248\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u5bf9\u8c61\u5c5e\u6027\u6392\u5e8f\u96c6\u5408\u3002","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u4fee\u8ba2\u7248\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"id":{"description":"\u4fee\u8ba2\u7248\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"\u4fee\u8ba2\u7248\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"id":{"description":"\u4fee\u8ba2\u7248\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u8981\u6c42\u4e3a true\uff0c\u56e0\u4e3a\u4fee\u8ba2\u7248\u672c\u4e0d\u80fd\u88ab\u79fb\u52a8\u5230\u56de\u6536\u7ad9\u3002","required":false}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"\u7528\u6765\u4fdd\u62a4\u5185\u5bb9\u548c\u6458\u8981\u7684\u5bc6\u7801\u3002","type":"string","required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6807\u9898\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u5185\u5bb9\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"\u8be5\u6587\u7ae0\u6240\u4f7f\u7528\u7684\u5185\u5bb9\u533a\u5757\u683c\u5f0f\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"\u5185\u5bb9\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"\u6587\u7ae0\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false},"excerpt":{"description":"\u8be5\u7bc7\u6587\u7ae0\u7684\u6458\u8981\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6458\u8981\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6458\u8981\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"\u6458\u8981\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"\u6587\u7ae0\u7684\u7279\u8272\u5a92\u4f53 ID\u3002","type":"integer","required":false},"comment_status":{"description":"\u6587\u7ae0\u662f\u5426\u5f00\u653e\u8bc4\u8bba\u3002","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"\u6587\u7ae0\u662f\u5426\u63a5\u53d7 Ping\u3002","type":"string","enum":["open","closed"],"required":false},"format":{"description":"\u6587\u7ae0\u7684\u5f62\u5f0f\u3002","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"_yoast_wpseo_focuskw":{"type":"string","title":"","description":"Yoast SEO Focus Keyword","default":""},"_yoast_wpseo_title":{"type":"string","title":"","description":"Yoast SEO Title","default":""},"_yoast_wpseo_metadesc":{"type":"string","title":"","description":"Yoast SEO Meta Description","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"\u6587\u7ae0\u662f\u5426\u4e3a\u7f6e\u9876\u3002","type":"boolean","required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false},"categories":{"description":"\u5728 category \u5206\u7c7b\u6cd5\u4e2d\u5206\u914d\u7ed9\u8be5\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"\u5728 post_tag \u5206\u7c7b\u6cd5\u4e2d\u5206\u914d\u7ed9\u8be5\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"id":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"after":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u540e\u53d1\u5e03\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"modified_after":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u4e3a\u4e00\u4e2a\u7ed9\u5b9a\u7684\u65e5\u671f\uff08ISO 8601 \u517c\u5bb9\u683c\u5f0f\uff09\u4e4b\u540e\u4fee\u6539\u8fc7\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"author":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a\u7ed9\u7279\u5b9a\u4f5c\u8005\u7684\u6587\u7ae0\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a\u7ed9\u7279\u5b9a\u4f5c\u8005\u7684\u6587\u7ae0\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u524d\u53d1\u5e03\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"modified_before":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u4e3a\u4e00\u4e2a\u7ed9\u5b9a\u7684\u65e5\u671f\uff08ISO 8601 \u517c\u5bb9\u683c\u5f0f\uff09\u4e4b\u524d\u4fee\u6539\u8fc7\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u7279\u5b9a menu_order \u7684\u6587\u7ae0\u3002","type":"integer","required":false},"search_semantics":{"description":"\u5982\u4f55\u89e3\u91ca\u641c\u7d22\u8f93\u5165\u3002","type":"string","enum":["exact"],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u6587\u7ae0\u5c5e\u6027\u5bf9\u96c6\u5408\u8fdb\u884c\u6392\u5e8f\u3002","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5177\u6709\u7279\u5b9a\u7236 ID \u7684\u9879\u76ee\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u9664\u7279\u5b9a\u7236 ID \u4e4b\u5916\u7684\u6240\u6709\u9879\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"\u9700\u8981\u641c\u7d22\u7684\u680f\u4f4d\u540d\u79f0\u7ec4\u3002","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u7279\u5b9a\u522b\u540d\u7684\u6587\u7ae0\u3002","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u72b6\u6001\u7684\u6587\u7ae0\u3002","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"\u7528\u6765\u4fdd\u62a4\u5185\u5bb9\u548c\u6458\u8981\u7684\u5bc6\u7801\u3002","type":"string","required":false},"parent":{"description":"\u6587\u7ae0\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6807\u9898\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u5185\u5bb9\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"\u8be5\u6587\u7ae0\u6240\u4f7f\u7528\u7684\u5185\u5bb9\u533a\u5757\u683c\u5f0f\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"\u5185\u5bb9\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"\u6587\u7ae0\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false},"excerpt":{"description":"\u8be5\u7bc7\u6587\u7ae0\u7684\u6458\u8981\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6458\u8981\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6458\u8981\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"\u6458\u8981\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"\u6587\u7ae0\u7684\u7279\u8272\u5a92\u4f53 ID\u3002","type":"integer","required":false},"comment_status":{"description":"\u6587\u7ae0\u662f\u5426\u5f00\u653e\u8bc4\u8bba\u3002","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"\u6587\u7ae0\u662f\u5426\u63a5\u53d7 Ping\u3002","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"\u6587\u7ae0\u4e0e\u5176\u4ed6\u6587\u7ae0\u7684\u987a\u5e8f\u3002","type":"integer","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/pages"}]}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"\u8986\u76d6\u9ed8\u8ba4\u6458\u8981\u957f\u5ea6\u3002","type":"integer","required":false},"password":{"description":"\u8be5\u6587\u7ae0\u7684\u5bc6\u7801\uff0c\u5982\u6587\u7ae0\u53d7\u5bc6\u7801\u4fdd\u62a4\u3002","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"\u7528\u6765\u4fdd\u62a4\u5185\u5bb9\u548c\u6458\u8981\u7684\u5bc6\u7801\u3002","type":"string","required":false},"parent":{"description":"\u6587\u7ae0\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6807\u9898\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u5185\u5bb9\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"\u8be5\u6587\u7ae0\u6240\u4f7f\u7528\u7684\u5185\u5bb9\u533a\u5757\u683c\u5f0f\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"\u5185\u5bb9\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"\u6587\u7ae0\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false},"excerpt":{"description":"\u8be5\u7bc7\u6587\u7ae0\u7684\u6458\u8981\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6458\u8981\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6458\u8981\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"\u6458\u8981\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"\u6587\u7ae0\u7684\u7279\u8272\u5a92\u4f53 ID\u3002","type":"integer","required":false},"comment_status":{"description":"\u6587\u7ae0\u662f\u5426\u5f00\u653e\u8bc4\u8bba\u3002","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"\u6587\u7ae0\u662f\u5426\u63a5\u53d7 Ping\u3002","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"\u6587\u7ae0\u4e0e\u5176\u4ed6\u6587\u7ae0\u7684\u987a\u5e8f\u3002","type":"integer","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u662f\u5426\u7ed5\u8fc7\u56de\u6536\u7ad9\u5e76\u5f3a\u884c\u5220\u9664\u3002","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u4fee\u8ba2\u7248\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u5bf9\u8c61\u5c5e\u6027\u6392\u5e8f\u96c6\u5408\u3002","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u4fee\u8ba2\u7248\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"id":{"description":"\u4fee\u8ba2\u7248\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"\u4fee\u8ba2\u7248\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"id":{"description":"\u4fee\u8ba2\u7248\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u8981\u6c42\u4e3a true\uff0c\u56e0\u4e3a\u4fee\u8ba2\u7248\u672c\u4e0d\u80fd\u88ab\u79fb\u52a8\u5230\u56de\u6536\u7ad9\u3002","required":false}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"\u6587\u7ae0\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"\u7528\u6765\u4fdd\u62a4\u5185\u5bb9\u548c\u6458\u8981\u7684\u5bc6\u7801\u3002","type":"string","required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6807\u9898\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u5185\u5bb9\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"\u8be5\u6587\u7ae0\u6240\u4f7f\u7528\u7684\u5185\u5bb9\u533a\u5757\u683c\u5f0f\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"\u5185\u5bb9\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"\u6587\u7ae0\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false},"excerpt":{"description":"\u8be5\u7bc7\u6587\u7ae0\u7684\u6458\u8981\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6458\u8981\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6458\u8981\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"\u6458\u8981\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"\u6587\u7ae0\u7684\u7279\u8272\u5a92\u4f53 ID\u3002","type":"integer","required":false},"comment_status":{"description":"\u6587\u7ae0\u662f\u5426\u5f00\u653e\u8bc4\u8bba\u3002","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"\u6587\u7ae0\u662f\u5426\u63a5\u53d7 Ping\u3002","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"\u6587\u7ae0\u4e0e\u5176\u4ed6\u6587\u7ae0\u7684\u987a\u5e8f\u3002","type":"integer","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"id":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"after":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u540e\u53d1\u5e03\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"modified_after":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u4e3a\u4e00\u4e2a\u7ed9\u5b9a\u7684\u65e5\u671f\uff08ISO 8601 \u517c\u5bb9\u683c\u5f0f\uff09\u4e4b\u540e\u4fee\u6539\u8fc7\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"author":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a\u7ed9\u7279\u5b9a\u4f5c\u8005\u7684\u6587\u7ae0\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a\u7ed9\u7279\u5b9a\u4f5c\u8005\u7684\u6587\u7ae0\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u524d\u53d1\u5e03\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"modified_before":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u4e3a\u4e00\u4e2a\u7ed9\u5b9a\u7684\u65e5\u671f\uff08ISO 8601 \u517c\u5bb9\u683c\u5f0f\uff09\u4e4b\u524d\u4fee\u6539\u8fc7\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"\u5982\u4f55\u89e3\u91ca\u641c\u7d22\u8f93\u5165\u3002","type":"string","enum":["exact"],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u6587\u7ae0\u5c5e\u6027\u5bf9\u96c6\u5408\u8fdb\u884c\u6392\u5e8f\u3002","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5177\u6709\u7279\u5b9a\u7236 ID \u7684\u9879\u76ee\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u9664\u7279\u5b9a\u7236 ID \u4e4b\u5916\u7684\u6240\u6709\u9879\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"\u9700\u8981\u641c\u7d22\u7684\u680f\u4f4d\u540d\u79f0\u7ec4\u3002","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u7279\u5b9a\u522b\u540d\u7684\u6587\u7ae0\u3002","type":"array","items":{"type":"string"},"required":false},"status":{"default":"inherit","description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u72b6\u6001\u7684\u6587\u7ae0\u3002","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"},"required":false},"media_type":{"default":null,"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u7279\u5b9a\u5a92\u4f53\u7c7b\u578b\u7684\u9644\u4ef6\u3002","type":"array","items":{"type":"string","enum":["image","video","text","application","audio"]},"required":false},"mime_type":{"default":null,"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u7279\u5b9a MIME \u7c7b\u578b\u7684\u9644\u4ef6\u3002","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6807\u9898\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"\u6587\u7ae0\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false},"featured_media":{"description":"\u6587\u7ae0\u7684\u7279\u8272\u5a92\u4f53 ID\u3002","type":"integer","required":false},"comment_status":{"description":"\u6587\u7ae0\u662f\u5426\u5f00\u653e\u8bc4\u8bba\u3002","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"\u6587\u7ae0\u662f\u5426\u63a5\u53d7 Ping\u3002","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":[],"required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false},"alt_text":{"description":"\u5728\u9644\u4ef6\u672a\u80fd\u663e\u793a\u65f6\u663e\u793a\u7684\u66ff\u6362\u6587\u672c\u3002","type":"string","required":false},"caption":{"description":"\u9644\u4ef6\u8bf4\u660e\u6587\u5b57\u3002","type":"object","properties":{"raw":{"description":"\u9644\u4ef6\u7684\u8bf4\u660e\u6587\u5b57\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u9644\u4ef6\u7684 HTML \u8bf4\u660e\u6587\u5b57\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"\u9644\u4ef6\u7684\u63cf\u8ff0\u3002","type":"object","properties":{"raw":{"description":"\u9644\u4ef6\u7684\u63cf\u8ff0\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u9644\u4ef6\u7684 HTML \u63cf\u8ff0\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"\u9644\u4ef6\u6240\u5c5e\u6587\u7ae0\u7684 ID\u3002","type":"integer","required":false},"generate_sub_sizes":{"type":"boolean","default":true,"description":"\u662f\u5426\u751f\u6210\u56fe\u50cf\u5b50\u5c3a\u5bf8\u3002","required":false},"convert_format":{"type":"boolean","default":true,"description":"\u662f\u5426\u8f6c\u6362\u56fe\u50cf\u683c\u5f0f\u3002","required":false},"url":{"type":"string","format":"uri","description":"\u8981\u4fa7\u8f7d\u5230\u5a92\u4f53\u5e93\u800c\u975e\u4e0a\u4f20\u6587\u4ef6\u7684\u5916\u90e8\u56fe\u7247 URL\u3002","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/media"}]}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6807\u9898\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"\u6587\u7ae0\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false},"featured_media":{"description":"\u6587\u7ae0\u7684\u7279\u8272\u5a92\u4f53 ID\u3002","type":"integer","required":false},"comment_status":{"description":"\u6587\u7ae0\u662f\u5426\u5f00\u653e\u8bc4\u8bba\u3002","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"\u6587\u7ae0\u662f\u5426\u63a5\u53d7 Ping\u3002","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":[],"required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false},"alt_text":{"description":"\u5728\u9644\u4ef6\u672a\u80fd\u663e\u793a\u65f6\u663e\u793a\u7684\u66ff\u6362\u6587\u672c\u3002","type":"string","required":false},"caption":{"description":"\u9644\u4ef6\u8bf4\u660e\u6587\u5b57\u3002","type":"object","properties":{"raw":{"description":"\u9644\u4ef6\u7684\u8bf4\u660e\u6587\u5b57\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u9644\u4ef6\u7684 HTML \u8bf4\u660e\u6587\u5b57\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"\u9644\u4ef6\u7684\u63cf\u8ff0\u3002","type":"object","properties":{"raw":{"description":"\u9644\u4ef6\u7684\u63cf\u8ff0\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u9644\u4ef6\u7684 HTML \u63cf\u8ff0\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"\u9644\u4ef6\u6240\u5c5e\u6587\u7ae0\u7684 ID\u3002","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u662f\u5426\u7ed5\u8fc7\u56de\u6536\u7ad9\u5e76\u5f3a\u884c\u5220\u9664\u3002","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/post-process":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"\u9644\u4ef6\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"action":{"type":"string","enum":["create-image-subsizes"],"required":true}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/edit":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"src":{"description":"\u5df2\u7ecf\u7f16\u8f91\u7684\u56fe\u7247\u6587\u4ef6 \u7684 URL\u3002","type":"string","format":"uri","required":true},"modifiers":{"description":"\u56fe\u7247\u7f16\u8f91\u6570\u7ec4\u3002","type":"array","minItems":1,"items":{"description":"\u56fe\u7247\u7f16\u8f91","type":"object","required":["type","args"],"oneOf":[{"title":"\u7ffb\u8f6c","properties":{"type":{"description":"\u7ffb\u8f6c\u7c7b\u578b\u3002","type":"string","enum":["flip"]},"args":{"description":"\u7ffb\u8f6c\u53c2\u6570\u3002","type":"object","required":["flip"],"properties":{"flip":{"description":"\u7ffb\u8f6c\u65b9\u5411\u3002","type":"object","required":["horizontal","vertical"],"properties":{"horizontal":{"description":"\u662f\u5426\u6c34\u5e73\u7ffb\u8f6c\u3002","type":"boolean"},"vertical":{"description":"\u662f\u5426\u5782\u76f4\u7ffb\u8f6c\u3002","type":"boolean"}}}}}}},{"title":"\u65cb\u8f6c","properties":{"type":{"description":"\u65cb\u8f6c\u7c7b\u578b\u3002","type":"string","enum":["rotate"]},"args":{"description":"\u65cb\u8f6c\u53c2\u6570\u3002","type":"object","required":["angle"],"properties":{"angle":{"description":"\u987a\u65f6\u9488\u65cb\u8f6c\u7684\u89d2\u5ea6\u3002","type":"number"}}}}},{"title":"\u88c1\u526a","properties":{"type":{"description":"\u88c1\u526a\u65b9\u5f0f\u3002","type":"string","enum":["crop"]},"args":{"description":"\u88c1\u526a\u53c2\u6570\u3002","type":"object","required":["left","top","width","height"],"properties":{"left":{"description":"\u4ece\u5de6\u8fb9\u5f00\u59cb\u88c1\u526a\u7684\u6c34\u5e73\u4f4d\u7f6e\u4ee5\u5360\u7528\u56fe\u7247\u5bbd\u5ea6\u7684\u767e\u5206\u6bd4\u8ba1\u7b97\u3002","type":"number"},"top":{"description":"\u4ece\u9876\u90e8\u5f00\u59cb\u88c1\u526a\u7684\u5782\u76f4\u4f4d\u7f6e\u4ee5\u5360\u7528\u56fe\u7247\u9ad8\u5ea6\u7684\u767e\u5206\u6bd4\u8ba1\u7b97\u3002","type":"number"},"width":{"description":"\u88c1\u526a\u5bbd\u5ea6\u4ee5\u5360\u7528\u56fe\u7247\u5bbd\u5ea6\u7684\u767e\u5206\u6bd4\u8ba1\u7b97\u3002","type":"number"},"height":{"description":"\u88c1\u526a\u7684\u9ad8\u5ea6\u4ee5\u5360\u7528\u56fe\u7247\u9ad8\u5ea6\u7684\u767e\u5206\u6bd4\u8ba1\u7b97\u3002","type":"number"}}}}}]},"required":false},"rotation":{"description":"\u987a\u65f6\u9488\u65cb\u8f6c\u7684\u89d2\u5ea6\u91cf\u3002\u5df2\u5f03\u7528\uff1a\u8bf7\u6539\u4e3a\u4f7f\u7528 `modifiers` \u53c2\u6570\u3002","type":"integer","minimum":0,"exclusiveMinimum":true,"maximum":360,"exclusiveMaximum":true,"required":false},"x":{"description":"\u4ece X \u8f74\u5f00\u59cb\u88c1\u526a\u7684\u4f4d\u7f6e\u4ee5\u5360\u7528\u56fe\u7247\u7684\u767e\u5206\u6bd4\u8ba1\u7b97\u3002\u5df2\u5f03\u7528\u3002\u4f7f\u7528`modifiers`\u4ee3\u66ff\u3002","type":"number","minimum":0,"maximum":100,"required":false},"y":{"description":"\u4ece Y \u8f74\u5f00\u59cb\u88c1\u526a\u7684\u4f4d\u7f6e\u4ee5\u5360\u7528\u56fe\u7247\u7684\u767e\u5206\u6bd4\u8ba1\u7b97\u3002\u5df2\u5f03\u7528\u3002\u4f7f\u7528`modifiers`\u4ee3\u66ff\u3002","type":"number","minimum":0,"maximum":100,"required":false},"width":{"description":"\u88c1\u526a\u5bbd\u5ea6\u4ee5\u56fe\u7247\u6240\u5360\u7528\u7684\u767e\u5206\u6bd4\u8ba1\u7b97\u3002\u5df2\u5f03\u7528\u3002\u4f7f\u7528`modifiers`\u4ee3\u66ff\u3002","type":"number","minimum":0,"maximum":100,"required":false},"height":{"description":"\u88c1\u526a\u9ad8\u5ea6\u4ee5\u56fe\u7247\u6240\u7ad9\u7528\u7684\u767e\u5206\u6bd4\u8ba1\u7b97\u3002\u5df2\u5f03\u7528\u3002\u4f7f\u7528`modifiers`\u4ee3\u66ff\u3002","type":"number","minimum":0,"maximum":100,"required":false},"caption":{"description":"\u9644\u4ef6\u8bf4\u660e\u6587\u5b57\u3002","type":"object","properties":{"raw":{"description":"\u9644\u4ef6\u7684\u8bf4\u660e\u6587\u5b57\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u9644\u4ef6\u7684 HTML \u8bf4\u660e\u6587\u5b57\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"\u9644\u4ef6\u7684\u63cf\u8ff0\u3002","type":"object","properties":{"raw":{"description":"\u9644\u4ef6\u7684\u63cf\u8ff0\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u9644\u4ef6\u7684 HTML \u63cf\u8ff0\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit"],"readonly":true}},"required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6807\u9898\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"post":{"description":"\u9644\u4ef6\u6240\u5c5e\u6587\u7ae0\u7684 ID\u3002","type":"integer","required":false},"alt_text":{"description":"\u5728\u9644\u4ef6\u672a\u80fd\u663e\u793a\u65f6\u663e\u793a\u7684\u66ff\u6362\u6587\u672c\u3002","type":"string","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/sideload":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"\u9644\u4ef6\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"image_size":{"description":"\u56fe\u7247\u5927\u5c0f\u3002\u53ef\u4ee5\u662f\u5355\u4e2a\u5c3a\u5bf8\u540d\u79f0\u6216\u5c3a\u5bf8\u540d\u79f0\u6570\u7ec4\uff0c\u4ee5\u5728\u591a\u4e2a\u5c3a\u5bf8\u4e0b\u6ce8\u518c\u76f8\u540c\u7684\u6587\u4ef6\u3002","type":["string","array"],"items":{"type":"string","minLength":1},"minItems":1,"minLength":1,"required":true},"convert_format":{"type":"boolean","default":true,"description":"\u662f\u5426\u8f6c\u6362\u56fe\u50cf\u683c\u5f0f\u3002","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/finalize":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"\u9644\u4ef6\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"sub_sizes":{"description":"\u4ece\u4fa7\u8f7d\u54cd\u5e94\u4e2d\u6536\u96c6\u7684\u5b50\u5c3a\u5bf8\u5143\u6570\u636e\u6570\u7ec4\u3002","type":"array","default":[],"maxItems":100,"items":{"type":"object","properties":{"image_size":{"description":"\u5c3a\u5bf8\u540d\u79f0\uff0c\u6216\u5f53\u5355\u4e2a\u6587\u4ef6\u5728\u5177\u6709\u5339\u914d\u5c3a\u5bf8\u7684\u591a\u4e2a\u5c3a\u5bf8\u4e0b\u6ce8\u518c\u65f6\u7684\u5c3a\u5bf8\u540d\u79f0\u6570\u7ec4\u3002","type":["string","array"],"items":{"type":"string","minLength":1},"minItems":1,"minLength":1,"required":true},"width":{"type":"integer","minimum":1},"height":{"type":"integer","minimum":1},"file":{"type":"string","minLength":1},"mime_type":{"type":"string","pattern":"^image\/.*"},"filesize":{"type":"integer","minimum":1},"original_image":{"type":"string","minLength":1}}},"required":false}}}]},"\/wp\/v2\/menu-items":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"after":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u540e\u53d1\u5e03\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"modified_after":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u4e3a\u4e00\u4e2a\u7ed9\u5b9a\u7684\u65e5\u671f\uff08ISO 8601 \u517c\u5bb9\u683c\u5f0f\uff09\u4e4b\u540e\u4fee\u6539\u8fc7\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"before":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u524d\u53d1\u5e03\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"modified_before":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u4e3a\u4e00\u4e2a\u7ed9\u5b9a\u7684\u65e5\u671f\uff08ISO 8601 \u517c\u5bb9\u683c\u5f0f\uff09\u4e4b\u524d\u4fee\u6539\u8fc7\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"\u5982\u4f55\u89e3\u91ca\u641c\u7d22\u8f93\u5165\u3002","type":"string","enum":["exact"],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u5bf9\u8c61\u5c5e\u6027\u6392\u5e8f\u96c6\u5408\u3002","type":"string","default":"menu_order","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"\u9700\u8981\u641c\u7d22\u7684\u680f\u4f4d\u540d\u79f0\u7ec4\u3002","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u7279\u5b9a\u522b\u540d\u7684\u6587\u7ae0\u3002","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u72b6\u6001\u7684\u6587\u7ae0\u3002","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"\u57fa\u4e8e\u591a\u4e2a\u5206\u7c7b\u6cd5\u95f4\u7684\u5173\u7cfb\u9650\u5236\u7ed3\u679c\u96c6\u3002","type":"string","enum":["AND","OR"],"required":false},"menus":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5728 menus \u5206\u7c7b\u6cd5\u4e2d\u6307\u5b9a\u4e86\u7279\u5b9a\u9879\u76ee\u7684\u9879\u76ee\u3002","type":["object","array"],"oneOf":[{"title":"\u672f\u8bed ID \u5217\u8868","description":"\u5c06\u9879\u76ee\u4e0e\u5217\u51fa\u7684 ID \u76f8\u5339\u914d\u3002","type":"array","items":{"type":"integer"}},{"title":"\u672f\u8bed ID \u5206\u7c7b\u6cd5\u67e5\u8be2\u3002","description":"\u8fdb\u884c\u4e00\u9879\u9ad8\u7ea7\u9879\u76ee\u67e5\u8be2\u3002","type":"object","properties":{"terms":{"description":"\u672f\u8bed ID\u3002","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"\u9879\u76ee\u662f\u5426\u5fc5\u987b\u5206\u914d\u6240\u6709\u6216\u4efb\u4f55\u6307\u5b9a\u7684\u672f\u8bed\u3002","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"menus_exclude":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5728 menus \u5206\u7c7b\u6cd5\u4e2d\u672a\u6307\u5b9a\u7279\u5b9a\u9879\u76ee\u7684\u9879\u76ee\u3002","type":["object","array"],"oneOf":[{"title":"\u672f\u8bed ID \u5217\u8868","description":"\u5c06\u9879\u76ee\u4e0e\u5217\u51fa\u7684 ID \u76f8\u5339\u914d\u3002","type":"array","items":{"type":"integer"}},{"title":"\u672f\u8bed ID \u5206\u7c7b\u6cd5\u67e5\u8be2\u3002","description":"\u8fdb\u884c\u4e00\u9879\u9ad8\u7ea7\u9879\u76ee\u67e5\u8be2\u3002","type":"object","properties":{"terms":{"description":"\u672f\u8bed ID\u3002","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"menu_order":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u7279\u5b9a menu_order \u7684\u6587\u7ae0\u3002","type":"integer","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"title":{"description":"\u5bf9\u8c61\u7684\u6807\u9898\u3002","type":["string","object"],"properties":{"raw":{"description":"\u5bf9\u8c61\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u5bf9\u8c61\u7684 HTML \u6807\u9898\uff0c\u8f6c\u6362\u540e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"default":"custom","description":"\u539f\u59cb\u8868\u793a\u7684\u5bf9\u8c61\u7ec4\uff0c\u5982\u300cpost_type\u300d\u6216\u300ctaxonomy\u300d\u3002","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"default":"publish","description":"\u5bf9\u8c61\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"parent":{"default":0,"description":"\u5bf9\u8c61\u7684\u7236\u5bf9\u8c61 ID\u3002","type":"integer","minimum":0,"required":false},"attr_title":{"description":"\u6b64\u83dc\u5355\u9879\u7684 link \u5143\u7d20\u7684 title \u5c5e\u6027\u7684\u6587\u672c\u3002","type":"string","required":false},"classes":{"description":"\u6b64\u83dc\u5355\u9879\u7684\u94fe\u63a5\u5143\u7d20\u7684\u7c7b\u540d\u79f0\u3002","type":"array","items":{"type":"string"},"required":false},"description":{"description":"\u6b64\u83dc\u5355\u9879\u7684\u63cf\u8ff0\u3002","type":"string","required":false},"menu_order":{"default":1,"description":"\u5bfc\u822a\u83dc\u5355\u9879\u7684 nav_menu_item \u7684 DB ID\uff08\u5982\u679c\u6709\uff09\uff0c\u5426\u5219\u4e3a 0\u3002","type":"integer","minimum":1,"required":false},"object":{"description":"\u5bf9\u8c61\u521d\u59cb\u7684\u8868\u793a\u7c7b\u578b\uff0c\u5982 \u300c\u5206\u7c7b\u300d\u3001\u300c\u6587\u7ae0\u300d\u548c\u300c\u9644\u4ef6\u300d\u3002","type":"string","required":false},"object_id":{"default":0,"description":"\u6b64\u83dc\u5355\u9879\u8868\u793a\u7684\u539f\u59cb\u5bf9\u8c61\u7684\u6570\u636e\u5e93 ID\uff0c\u4f8b\u5982\u6587\u7ae0\u7684 ID \u6216\u5206\u7c7b\u7684 term_id\u3002","type":"integer","minimum":0,"required":false},"target":{"description":"\u6b64\u83dc\u5355\u9879\u7684\u94fe\u63a5\u5143\u7d20\u7684 target \u5c5e\u6027\u3002","type":"string","enum":["_blank",""],"required":false},"url":{"description":"\u8be5\u83dc\u5355\u9879\u6307\u5411\u7684 URL\u3002","type":"string","format":"uri","required":false},"xfn":{"description":"\u8be5\u83dc\u5355\u9879\u7684\u94fe\u63a5\u4e2d\u8868\u793a\u7684 XFN \u5173\u7cfb\u3002","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"\u6b64\u5bf9\u8c61\u5728 nav_menu \u5206\u7c7b\u6cd5\u4e2d\u6307\u5b9a\u7684\u9879\u3002","type":"integer","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/menu-items"}]}},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"title":{"description":"\u5bf9\u8c61\u7684\u6807\u9898\u3002","type":["string","object"],"properties":{"raw":{"description":"\u5bf9\u8c61\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u5bf9\u8c61\u7684 HTML \u6807\u9898\uff0c\u8f6c\u6362\u540e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"\u539f\u59cb\u8868\u793a\u7684\u5bf9\u8c61\u7ec4\uff0c\u5982\u300cpost_type\u300d\u6216\u300ctaxonomy\u300d\u3002","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"\u5bf9\u8c61\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"parent":{"description":"\u5bf9\u8c61\u7684\u7236\u5bf9\u8c61 ID\u3002","type":"integer","minimum":0,"required":false},"attr_title":{"description":"\u6b64\u83dc\u5355\u9879\u7684 link \u5143\u7d20\u7684 title \u5c5e\u6027\u7684\u6587\u672c\u3002","type":"string","required":false},"classes":{"description":"\u6b64\u83dc\u5355\u9879\u7684\u94fe\u63a5\u5143\u7d20\u7684\u7c7b\u540d\u79f0\u3002","type":"array","items":{"type":"string"},"required":false},"description":{"description":"\u6b64\u83dc\u5355\u9879\u7684\u63cf\u8ff0\u3002","type":"string","required":false},"menu_order":{"description":"\u5bfc\u822a\u83dc\u5355\u9879\u7684 nav_menu_item \u7684 DB ID\uff08\u5982\u679c\u6709\uff09\uff0c\u5426\u5219\u4e3a 0\u3002","type":"integer","minimum":1,"required":false},"object":{"description":"\u5bf9\u8c61\u521d\u59cb\u7684\u8868\u793a\u7c7b\u578b\uff0c\u5982 \u300c\u5206\u7c7b\u300d\u3001\u300c\u6587\u7ae0\u300d\u548c\u300c\u9644\u4ef6\u300d\u3002","type":"string","required":false},"object_id":{"description":"\u6b64\u83dc\u5355\u9879\u8868\u793a\u7684\u539f\u59cb\u5bf9\u8c61\u7684\u6570\u636e\u5e93 ID\uff0c\u4f8b\u5982\u6587\u7ae0\u7684 ID \u6216\u5206\u7c7b\u7684 term_id\u3002","type":"integer","minimum":0,"required":false},"target":{"description":"\u6b64\u83dc\u5355\u9879\u7684\u94fe\u63a5\u5143\u7d20\u7684 target \u5c5e\u6027\u3002","type":"string","enum":["_blank",""],"required":false},"url":{"description":"\u8be5\u83dc\u5355\u9879\u6307\u5411\u7684 URL\u3002","type":"string","format":"uri","required":false},"xfn":{"description":"\u8be5\u83dc\u5355\u9879\u7684\u94fe\u63a5\u4e2d\u8868\u793a\u7684 XFN \u5173\u7cfb\u3002","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"\u6b64\u5bf9\u8c61\u5728 nav_menu \u5206\u7c7b\u6cd5\u4e2d\u6307\u5b9a\u7684\u9879\u3002","type":"integer","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u662f\u5426\u7ed5\u8fc7\u56de\u6536\u7ad9\u5e76\u5f3a\u884c\u5220\u9664\u3002","required":false}}}]},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"\u5bf9\u8c61\u7684\u7236\u5bf9\u8c61 ID\u3002","type":"integer","minimum":0,"required":false},"title":{"description":"\u5bf9\u8c61\u7684\u6807\u9898\u3002","type":["string","object"],"properties":{"raw":{"description":"\u5bf9\u8c61\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u5bf9\u8c61\u7684 HTML \u6807\u9898\uff0c\u8f6c\u6362\u540e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"\u539f\u59cb\u8868\u793a\u7684\u5bf9\u8c61\u7ec4\uff0c\u5982\u300cpost_type\u300d\u6216\u300ctaxonomy\u300d\u3002","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"\u5bf9\u8c61\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"attr_title":{"description":"\u6b64\u83dc\u5355\u9879\u7684 link \u5143\u7d20\u7684 title \u5c5e\u6027\u7684\u6587\u672c\u3002","type":"string","required":false},"classes":{"description":"\u6b64\u83dc\u5355\u9879\u7684\u94fe\u63a5\u5143\u7d20\u7684\u7c7b\u540d\u79f0\u3002","type":"array","items":{"type":"string"},"required":false},"description":{"description":"\u6b64\u83dc\u5355\u9879\u7684\u63cf\u8ff0\u3002","type":"string","required":false},"menu_order":{"description":"\u5bfc\u822a\u83dc\u5355\u9879\u7684 nav_menu_item \u7684 DB ID\uff08\u5982\u679c\u6709\uff09\uff0c\u5426\u5219\u4e3a 0\u3002","type":"integer","minimum":1,"required":false},"object":{"description":"\u5bf9\u8c61\u521d\u59cb\u7684\u8868\u793a\u7c7b\u578b\uff0c\u5982 \u300c\u5206\u7c7b\u300d\u3001\u300c\u6587\u7ae0\u300d\u548c\u300c\u9644\u4ef6\u300d\u3002","type":"string","required":false},"object_id":{"description":"\u6b64\u83dc\u5355\u9879\u8868\u793a\u7684\u539f\u59cb\u5bf9\u8c61\u7684\u6570\u636e\u5e93 ID\uff0c\u4f8b\u5982\u6587\u7ae0\u7684 ID \u6216\u5206\u7c7b\u7684 term_id\u3002","type":"integer","minimum":0,"required":false},"target":{"description":"\u6b64\u83dc\u5355\u9879\u7684\u94fe\u63a5\u5143\u7d20\u7684 target \u5c5e\u6027\u3002","type":"string","enum":["_blank",""],"required":false},"url":{"description":"\u8be5\u83dc\u5355\u9879\u6307\u5411\u7684 URL\u3002","type":"string","format":"uri","required":false},"xfn":{"description":"\u8be5\u83dc\u5355\u9879\u7684\u94fe\u63a5\u4e2d\u8868\u793a\u7684 XFN \u5173\u7cfb\u3002","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"\u6b64\u5bf9\u8c61\u5728 nav_menu \u5206\u7c7b\u6cd5\u4e2d\u6307\u5b9a\u7684\u9879\u3002","type":"integer","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":[],"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"id":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"after":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u540e\u53d1\u5e03\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"modified_after":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u4e3a\u4e00\u4e2a\u7ed9\u5b9a\u7684\u65e5\u671f\uff08ISO 8601 \u517c\u5bb9\u683c\u5f0f\uff09\u4e4b\u540e\u4fee\u6539\u8fc7\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"before":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u524d\u53d1\u5e03\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"modified_before":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u4e3a\u4e00\u4e2a\u7ed9\u5b9a\u7684\u65e5\u671f\uff08ISO 8601 \u517c\u5bb9\u683c\u5f0f\uff09\u4e4b\u524d\u4fee\u6539\u8fc7\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"\u5982\u4f55\u89e3\u91ca\u641c\u7d22\u8f93\u5165\u3002","type":"string","enum":["exact"],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u6587\u7ae0\u5c5e\u6027\u5bf9\u96c6\u5408\u8fdb\u884c\u6392\u5e8f\u3002","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"\u9700\u8981\u641c\u7d22\u7684\u680f\u4f4d\u540d\u79f0\u7ec4\u3002","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u7279\u5b9a\u522b\u540d\u7684\u6587\u7ae0\u3002","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u72b6\u6001\u7684\u6587\u7ae0\u3002","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"\u57fa\u4e8e\u591a\u4e2a\u5206\u7c7b\u6cd5\u95f4\u7684\u5173\u7cfb\u9650\u5236\u7ed3\u679c\u96c6\u3002","type":"string","enum":["AND","OR"],"required":false},"wp_pattern_category":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5728 wp_pattern_category \u5206\u7c7b\u6cd5\u4e2d\u6307\u5b9a\u4e86\u7279\u5b9a\u9879\u76ee\u7684\u9879\u76ee\u3002","type":["object","array"],"oneOf":[{"title":"\u672f\u8bed ID \u5217\u8868","description":"\u5c06\u9879\u76ee\u4e0e\u5217\u51fa\u7684 ID \u76f8\u5339\u914d\u3002","type":"array","items":{"type":"integer"}},{"title":"\u672f\u8bed ID \u5206\u7c7b\u6cd5\u67e5\u8be2\u3002","description":"\u8fdb\u884c\u4e00\u9879\u9ad8\u7ea7\u9879\u76ee\u67e5\u8be2\u3002","type":"object","properties":{"terms":{"description":"\u672f\u8bed ID\u3002","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"\u9879\u76ee\u662f\u5426\u5fc5\u987b\u5206\u914d\u6240\u6709\u6216\u4efb\u4f55\u6307\u5b9a\u7684\u672f\u8bed\u3002","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"wp_pattern_category_exclude":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5728 wp_pattern_category \u5206\u7c7b\u6cd5\u4e2d\u672a\u6307\u5b9a\u7279\u5b9a\u9879\u76ee\u7684\u9879\u76ee\u3002","type":["object","array"],"oneOf":[{"title":"\u672f\u8bed ID \u5217\u8868","description":"\u5c06\u9879\u76ee\u4e0e\u5217\u51fa\u7684 ID \u76f8\u5339\u914d\u3002","type":"array","items":{"type":"integer"}},{"title":"\u672f\u8bed ID \u5206\u7c7b\u6cd5\u67e5\u8be2\u3002","description":"\u8fdb\u884c\u4e00\u9879\u9ad8\u7ea7\u9879\u76ee\u67e5\u8be2\u3002","type":"object","properties":{"terms":{"description":"\u672f\u8bed ID\u3002","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"\u7528\u6765\u4fdd\u62a4\u5185\u5bb9\u548c\u6458\u8981\u7684\u5bc6\u7801\u3002","type":"string","required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit"]},"block_version":{"description":"\u8be5\u6587\u7ae0\u6240\u4f7f\u7528\u7684\u5185\u5bb9\u533a\u5757\u683c\u5f0f\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"\u5185\u5bb9\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"\u8be5\u7bc7\u6587\u7ae0\u7684\u6458\u8981\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6458\u8981\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6458\u8981\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"\u6458\u8981\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false},"wp_pattern_category":{"description":"\u5728 wp_pattern_category \u5206\u7c7b\u6cd5\u4e2d\u5206\u914d\u7ed9\u8be5\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/blocks"}]}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"\u8986\u76d6\u9ed8\u8ba4\u6458\u8981\u957f\u5ea6\u3002","type":"integer","required":false},"password":{"description":"\u8be5\u6587\u7ae0\u7684\u5bc6\u7801\uff0c\u5982\u6587\u7ae0\u53d7\u5bc6\u7801\u4fdd\u62a4\u3002","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"\u7528\u6765\u4fdd\u62a4\u5185\u5bb9\u548c\u6458\u8981\u7684\u5bc6\u7801\u3002","type":"string","required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit"]},"block_version":{"description":"\u8be5\u6587\u7ae0\u6240\u4f7f\u7528\u7684\u5185\u5bb9\u533a\u5757\u683c\u5f0f\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"\u5185\u5bb9\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"\u8be5\u7bc7\u6587\u7ae0\u7684\u6458\u8981\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6458\u8981\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6458\u8981\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"\u6458\u8981\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false},"wp_pattern_category":{"description":"\u5728 wp_pattern_category \u5206\u7c7b\u6cd5\u4e2d\u5206\u914d\u7ed9\u8be5\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u662f\u5426\u7ed5\u8fc7\u56de\u6536\u7ad9\u5e76\u5f3a\u884c\u5220\u9664\u3002","required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u4fee\u8ba2\u7248\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u5bf9\u8c61\u5c5e\u6027\u6392\u5e8f\u96c6\u5408\u3002","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u4fee\u8ba2\u7248\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"id":{"description":"\u4fee\u8ba2\u7248\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"\u4fee\u8ba2\u7248\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"id":{"description":"\u4fee\u8ba2\u7248\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u8981\u6c42\u4e3a true\uff0c\u56e0\u4e3a\u4fee\u8ba2\u7248\u672c\u4e0d\u80fd\u88ab\u79fb\u52a8\u5230\u56de\u6536\u7ad9\u3002","required":false}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"\u7528\u6765\u4fdd\u62a4\u5185\u5bb9\u548c\u6458\u8981\u7684\u5bc6\u7801\u3002","type":"string","required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit"]},"block_version":{"description":"\u8be5\u6587\u7ae0\u6240\u4f7f\u7528\u7684\u5185\u5bb9\u533a\u5757\u683c\u5f0f\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"\u5185\u5bb9\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"\u8be5\u7bc7\u6587\u7ae0\u7684\u6458\u8981\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6458\u8981\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6458\u8981\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"\u6458\u8981\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false},"wp_pattern_category":{"description":"\u5728 wp_pattern_category \u5206\u7c7b\u6cd5\u4e2d\u5206\u914d\u7ed9\u8be5\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"id":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u5bf9\u8c61\u5c5e\u6027\u6392\u5e8f\u96c6\u5408\u3002","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"id":{"description":"\u4fee\u8ba2\u7248\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"id":{"description":"\u4fee\u8ba2\u7248\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u8981\u6c42\u4e3a true\uff0c\u56e0\u4e3a\u4fee\u8ba2\u7248\u672c\u4e0d\u80fd\u88ab\u79fb\u52a8\u5230\u56de\u6536\u7ad9\u3002","required":false}}}]},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"slug":{"description":"\u6807\u8bc6\u6a21\u677f\u7684\u552f\u4e00\u522b\u540d\u3002","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"\u6a21\u677f\u7684\u4e3b\u9898\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"type":{"description":"\u6a21\u677f\u7684\u7c7b\u578b\u3002","type":"string","required":false},"content":{"description":"\u6a21\u677f\u7684\u5185\u5bb9\u3002","type":["object","string"],"properties":{"raw":{"description":"\u6a21\u677f\u7684\u5185\u5bb9\uff0c\u56e0\u4e3a\u5b83\u5b58\u5728\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit"]},"block_version":{"description":"\u6a21\u677f\u4f7f\u7528\u7684\u5185\u5bb9\u5757\u683c\u5f0f\u7684\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"\u6a21\u677f\u7684\u6807\u9898\u3002","type":["object","string"],"properties":{"raw":{"description":"\u6a21\u677f\u7684\u6807\u9898\uff0c\u56e0\u4e3a\u5b83\u5b58\u5728\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit","embed"]},"rendered":{"description":"\u6a21\u677f\u7684 HTML \u6807\u9898\uff0c\u5df2\u8f6c\u6362\u4ee5\u4f9b\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"\u6a21\u677f\u7684\u63cf\u8ff0\u3002","type":"string","required":false},"status":{"description":"\u6a21\u677f\u7684\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"\u6a21\u677f\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"id":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"\u9650\u5236\u4e3a\u6307\u5b9a\u7684\u6587\u7ae0 ID\u3002","type":"integer","required":false},"area":{"description":"\u9650\u5236\u4e3a\u6307\u5b9a\u7684\u6a21\u677f\u7ec4\u4ef6\u533a\u3002","type":"string","required":false},"post_type":{"description":"\u8981\u83b7\u53d6\u6a21\u677f\u7684\u6587\u7ae0\u7c7b\u578b\u3002","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"\u6807\u8bc6\u6a21\u677f\u7684\u552f\u4e00\u522b\u540d\u3002","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"\u6a21\u677f\u7684\u4e3b\u9898\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"type":{"description":"\u6a21\u677f\u7684\u7c7b\u578b\u3002","type":"string","required":false},"content":{"default":"","description":"\u6a21\u677f\u7684\u5185\u5bb9\u3002","type":["object","string"],"properties":{"raw":{"description":"\u6a21\u677f\u7684\u5185\u5bb9\uff0c\u56e0\u4e3a\u5b83\u5b58\u5728\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit"]},"block_version":{"description":"\u6a21\u677f\u4f7f\u7528\u7684\u5185\u5bb9\u5757\u683c\u5f0f\u7684\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"\u6a21\u677f\u7684\u6807\u9898\u3002","type":["object","string"],"properties":{"raw":{"description":"\u6a21\u677f\u7684\u6807\u9898\uff0c\u56e0\u4e3a\u5b83\u5b58\u5728\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit","embed"]},"rendered":{"description":"\u6a21\u677f\u7684 HTML \u6807\u9898\uff0c\u5df2\u8f6c\u6362\u4ee5\u4f9b\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"\u6a21\u677f\u7684\u63cf\u8ff0\u3002","type":"string","required":false},"status":{"default":"publish","description":"\u6a21\u677f\u7684\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"\u6a21\u677f\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/templates"}]}},"\/wp\/v2\/templates\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"\u83b7\u53d6\u56de\u9000\u6240\u7528\u7684\u6a21\u677f\u7684\u522b\u540d\uff1a","type":"string","required":true},"is_custom":{"description":"\u8868\u660e\u6a21\u677f\u662f\u81ea\u5b9a\u4e49\u7684\uff0c\u8fd8\u662f\u5c5e\u4e8e\u6a21\u677f\u5c42\u7ea7\u7684\u4e00\u90e8\u5206","type":"boolean","required":false},"template_prefix":{"description":"\u6240\u521b\u5efa\u6a21\u677f\u7684\u6a21\u677f\u524d\u7f00\u3002\u7528\u4e8e\u63d0\u53d6\u4e3b\u6a21\u677f\u7c7b\u578b\uff0c\u4f8b\u5982\u5728 `taxonomy-books` \u4e2d\u63d0\u53d6 `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/templates\/lookup"}]}},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"slug":{"description":"\u6807\u8bc6\u6a21\u677f\u7684\u552f\u4e00\u522b\u540d\u3002","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"\u6a21\u677f\u7684\u4e3b\u9898\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"type":{"description":"\u6a21\u677f\u7684\u7c7b\u578b\u3002","type":"string","required":false},"content":{"description":"\u6a21\u677f\u7684\u5185\u5bb9\u3002","type":["object","string"],"properties":{"raw":{"description":"\u6a21\u677f\u7684\u5185\u5bb9\uff0c\u56e0\u4e3a\u5b83\u5b58\u5728\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit"]},"block_version":{"description":"\u6a21\u677f\u4f7f\u7528\u7684\u5185\u5bb9\u5757\u683c\u5f0f\u7684\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"\u6a21\u677f\u7684\u6807\u9898\u3002","type":["object","string"],"properties":{"raw":{"description":"\u6a21\u677f\u7684\u6807\u9898\uff0c\u56e0\u4e3a\u5b83\u5b58\u5728\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit","embed"]},"rendered":{"description":"\u6a21\u677f\u7684 HTML \u6807\u9898\uff0c\u5df2\u8f6c\u6362\u4ee5\u4f9b\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"\u6a21\u677f\u7684\u63cf\u8ff0\u3002","type":"string","required":false},"status":{"description":"\u6a21\u677f\u7684\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"\u6a21\u677f\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"\u662f\u5426\u7ed5\u8fc7\u56de\u6536\u7ad9\u5e76\u5f3a\u884c\u5220\u9664\u3002","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u5bf9\u8c61\u5c5e\u6027\u6392\u5e8f\u96c6\u5408\u3002","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"id":{"description":"\u4fee\u8ba2\u7248\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"id":{"description":"\u4fee\u8ba2\u7248\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u8981\u6c42\u4e3a true\uff0c\u56e0\u4e3a\u4fee\u8ba2\u7248\u672c\u4e0d\u80fd\u88ab\u79fb\u52a8\u5230\u56de\u6536\u7ad9\u3002","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"slug":{"description":"\u6807\u8bc6\u6a21\u677f\u7684\u552f\u4e00\u522b\u540d\u3002","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"\u6a21\u677f\u7684\u4e3b\u9898\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"type":{"description":"\u6a21\u677f\u7684\u7c7b\u578b\u3002","type":"string","required":false},"content":{"description":"\u6a21\u677f\u7684\u5185\u5bb9\u3002","type":["object","string"],"properties":{"raw":{"description":"\u6a21\u677f\u7684\u5185\u5bb9\uff0c\u56e0\u4e3a\u5b83\u5b58\u5728\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit"]},"block_version":{"description":"\u6a21\u677f\u4f7f\u7528\u7684\u5185\u5bb9\u5757\u683c\u5f0f\u7684\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"\u6a21\u677f\u7684\u6807\u9898\u3002","type":["object","string"],"properties":{"raw":{"description":"\u6a21\u677f\u7684\u6807\u9898\uff0c\u56e0\u4e3a\u5b83\u5b58\u5728\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit","embed"]},"rendered":{"description":"\u6a21\u677f\u7684 HTML \u6807\u9898\uff0c\u5df2\u8f6c\u6362\u4ee5\u4f9b\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"\u6a21\u677f\u7684\u63cf\u8ff0\u3002","type":"string","required":false},"status":{"description":"\u6a21\u677f\u7684\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"\u6a21\u677f\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false},"area":{"description":"\u6a21\u677f\u7ec4\u4ef6\u7528\u9014\uff08\u9875\u7709\u3001\u9875\u811a\u7b49\uff09\u3002","type":"string","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"id":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/template-parts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"\u9650\u5236\u4e3a\u6307\u5b9a\u7684\u6587\u7ae0 ID\u3002","type":"integer","required":false},"area":{"description":"\u9650\u5236\u4e3a\u6307\u5b9a\u7684\u6a21\u677f\u7ec4\u4ef6\u533a\u3002","type":"string","required":false},"post_type":{"description":"\u8981\u83b7\u53d6\u6a21\u677f\u7684\u6587\u7ae0\u7c7b\u578b\u3002","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"\u6807\u8bc6\u6a21\u677f\u7684\u552f\u4e00\u522b\u540d\u3002","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"\u6a21\u677f\u7684\u4e3b\u9898\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"type":{"description":"\u6a21\u677f\u7684\u7c7b\u578b\u3002","type":"string","required":false},"content":{"default":"","description":"\u6a21\u677f\u7684\u5185\u5bb9\u3002","type":["object","string"],"properties":{"raw":{"description":"\u6a21\u677f\u7684\u5185\u5bb9\uff0c\u56e0\u4e3a\u5b83\u5b58\u5728\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit"]},"block_version":{"description":"\u6a21\u677f\u4f7f\u7528\u7684\u5185\u5bb9\u5757\u683c\u5f0f\u7684\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"\u6a21\u677f\u7684\u6807\u9898\u3002","type":["object","string"],"properties":{"raw":{"description":"\u6a21\u677f\u7684\u6807\u9898\uff0c\u56e0\u4e3a\u5b83\u5b58\u5728\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit","embed"]},"rendered":{"description":"\u6a21\u677f\u7684 HTML \u6807\u9898\uff0c\u5df2\u8f6c\u6362\u4ee5\u4f9b\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"\u6a21\u677f\u7684\u63cf\u8ff0\u3002","type":"string","required":false},"status":{"default":"publish","description":"\u6a21\u677f\u7684\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"\u6a21\u677f\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false},"area":{"description":"\u6a21\u677f\u7ec4\u4ef6\u7528\u9014\uff08\u9875\u7709\u3001\u9875\u811a\u7b49\uff09\u3002","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/template-parts"}]}},"\/wp\/v2\/template-parts\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"\u83b7\u53d6\u56de\u9000\u6240\u7528\u7684\u6a21\u677f\u7684\u522b\u540d\uff1a","type":"string","required":true},"is_custom":{"description":"\u8868\u660e\u6a21\u677f\u662f\u81ea\u5b9a\u4e49\u7684\uff0c\u8fd8\u662f\u5c5e\u4e8e\u6a21\u677f\u5c42\u7ea7\u7684\u4e00\u90e8\u5206","type":"boolean","required":false},"template_prefix":{"description":"\u6240\u521b\u5efa\u6a21\u677f\u7684\u6a21\u677f\u524d\u7f00\u3002\u7528\u4e8e\u63d0\u53d6\u4e3b\u6a21\u677f\u7c7b\u578b\uff0c\u4f8b\u5982\u5728 `taxonomy-books` \u4e2d\u63d0\u53d6 `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/template-parts\/lookup"}]}},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"slug":{"description":"\u6807\u8bc6\u6a21\u677f\u7684\u552f\u4e00\u522b\u540d\u3002","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"\u6a21\u677f\u7684\u4e3b\u9898\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"type":{"description":"\u6a21\u677f\u7684\u7c7b\u578b\u3002","type":"string","required":false},"content":{"description":"\u6a21\u677f\u7684\u5185\u5bb9\u3002","type":["object","string"],"properties":{"raw":{"description":"\u6a21\u677f\u7684\u5185\u5bb9\uff0c\u56e0\u4e3a\u5b83\u5b58\u5728\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit"]},"block_version":{"description":"\u6a21\u677f\u4f7f\u7528\u7684\u5185\u5bb9\u5757\u683c\u5f0f\u7684\u7248\u672c\u3002","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"\u6a21\u677f\u7684\u6807\u9898\u3002","type":["object","string"],"properties":{"raw":{"description":"\u6a21\u677f\u7684\u6807\u9898\uff0c\u56e0\u4e3a\u5b83\u5b58\u5728\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit","embed"]},"rendered":{"description":"\u6a21\u677f\u7684 HTML \u6807\u9898\uff0c\u5df2\u8f6c\u6362\u4ee5\u4f9b\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"\u6a21\u677f\u7684\u63cf\u8ff0\u3002","type":"string","required":false},"status":{"description":"\u6a21\u677f\u7684\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"\u6a21\u677f\u4f5c\u8005\u7684 ID\u3002","type":"integer","required":false},"area":{"description":"\u6a21\u677f\u7ec4\u4ef6\u7528\u9014\uff08\u9875\u7709\u3001\u9875\u811a\u7b49\uff09\u3002","type":"string","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"\u8be5\u6a21\u677f\u7684 ID","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"\u662f\u5426\u7ed5\u8fc7\u56de\u6536\u7ad9\u5e76\u5f3a\u884c\u5220\u9664\u3002","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u4fee\u8ba2\u7248\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","minimum":1,"maximum":100,"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u5168\u5c40\u6837\u5f0f\u4fee\u8ba2\u7248\u7236\u7248\u672c\u7684 ID\u3002","type":"integer","required":false},"id":{"description":"\u5168\u5c40\u6837\u5f0f\u4fee\u8ba2\u7248\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[\\\/\\s%\\w\\.\\(\\)\\[\\]\\@_\\-]+)\/variations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"\u4e3b\u9898\u6807\u8bc6\u7b26","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"\u4e3b\u9898\u6807\u8bc6\u7b26","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<id>[\\\/\\d+]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"id":{"description":"\u5168\u5c40\u6837\u5f0f\u914d\u7f6e\u7684 ID\u3002","type":"integer","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":false},"args":{"styles":{"description":"\u5168\u5c40\u6837\u5f0f\u3002","type":["object"],"required":false},"settings":{"description":"\u5168\u5c40\u8bbe\u7f6e\u3002","type":["object"],"required":false},"title":{"description":"\u5168\u5c40\u6837\u5f0f\u53d8\u4f53\u7684\u6807\u9898\u3002","type":["object","string"],"properties":{"raw":{"description":"\u5168\u5c40\u6837\u5f0f\u53d8\u4f53\u7684\u6807\u9898\uff0c\u56e0\u4e3a\u5b83\u5b58\u5728\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["view","edit","embed"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6807\u9898\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false}}}]},"\/wp\/v2\/navigation":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"after":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u540e\u53d1\u5e03\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"modified_after":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u4e3a\u4e00\u4e2a\u7ed9\u5b9a\u7684\u65e5\u671f\uff08ISO 8601 \u517c\u5bb9\u683c\u5f0f\uff09\u4e4b\u540e\u4fee\u6539\u8fc7\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"before":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u524d\u53d1\u5e03\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"modified_before":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u4e3a\u4e00\u4e2a\u7ed9\u5b9a\u7684\u65e5\u671f\uff08ISO 8601 \u517c\u5bb9\u683c\u5f0f\uff09\u4e4b\u524d\u4fee\u6539\u8fc7\u7684\u6587\u7ae0\u3002","type":"string","format":"date-time","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"\u5982\u4f55\u89e3\u91ca\u641c\u7d22\u8f93\u5165\u3002","type":"string","enum":["exact"],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u6587\u7ae0\u5c5e\u6027\u5bf9\u96c6\u5408\u8fdb\u884c\u6392\u5e8f\u3002","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"\u9700\u8981\u641c\u7d22\u7684\u680f\u4f4d\u540d\u79f0\u7ec4\u3002","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u7279\u5b9a\u522b\u540d\u7684\u6587\u7ae0\u3002","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u72b6\u6001\u7684\u6587\u7ae0\u3002","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"\u7528\u6765\u4fdd\u62a4\u5185\u5bb9\u548c\u6458\u8981\u7684\u5bc6\u7801\u3002","type":"string","required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit","embed"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6807\u9898\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit","embed"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u5185\u5bb9\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"\u8be5\u6587\u7ae0\u6240\u4f7f\u7528\u7684\u5185\u5bb9\u533a\u5757\u683c\u5f0f\u7248\u672c\u3002","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"\u5185\u5bb9\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/navigation"}]}},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"\u8be5\u6587\u7ae0\u7684\u5bc6\u7801\uff0c\u5982\u6587\u7ae0\u53d7\u5bc6\u7801\u4fdd\u62a4\u3002","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"\u7528\u6765\u4fdd\u62a4\u5185\u5bb9\u548c\u6458\u8981\u7684\u5bc6\u7801\u3002","type":"string","required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit","embed"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6807\u9898\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit","embed"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u5185\u5bb9\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"\u8be5\u6587\u7ae0\u6240\u4f7f\u7528\u7684\u5185\u5bb9\u533a\u5757\u683c\u5f0f\u7248\u672c\u3002","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"\u5185\u5bb9\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u662f\u5426\u7ed5\u8fc7\u56de\u6536\u7ad9\u5e76\u5f3a\u884c\u5220\u9664\u3002","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u4fee\u8ba2\u7248\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u5bf9\u8c61\u5c5e\u6027\u6392\u5e8f\u96c6\u5408\u3002","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u4fee\u8ba2\u7248\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"id":{"description":"\u4fee\u8ba2\u7248\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"\u4fee\u8ba2\u7248\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"id":{"description":"\u4fee\u8ba2\u7248\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u8981\u6c42\u4e3a true\uff0c\u56e0\u4e3a\u4fee\u8ba2\u7248\u672c\u4e0d\u80fd\u88ab\u79fb\u52a8\u5230\u56de\u6536\u7ad9\u3002","required":false}}}]},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"date":{"description":"\u6587\u7ae0\u53d1\u5e03\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"\u8be5\u6587\u7ae0\u53d1\u5e03\u7684 GMT \u65e5\u671f\u3002","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"\u6587\u7ae0\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\uff0c\u5176\u7c7b\u578b\u662f\u552f\u4e00\u7684\u3002","type":"string","required":false},"status":{"description":"\u6587\u7ae0\u7684\u547d\u540d\u72b6\u6001\u3002","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"\u7528\u6765\u4fdd\u62a4\u5185\u5bb9\u548c\u6458\u8981\u7684\u5bc6\u7801\u3002","type":"string","required":false},"title":{"description":"\u6587\u7ae0\u7684\u6807\u9898\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u6807\u9898\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit","embed"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u6807\u9898\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u6587\u7ae0\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit","embed"]},"rendered":{"description":"\u6587\u7ae0\u7684 HTML \u5185\u5bb9\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"\u8be5\u6587\u7ae0\u6240\u4f7f\u7528\u7684\u5185\u5bb9\u533a\u5757\u683c\u5f0f\u7248\u672c\u3002","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"\u5185\u5bb9\u662f\u5426\u53d7\u5230\u5bc6\u7801\u4fdd\u62a4\u3002","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"\u7528\u4e8e\u663e\u793a\u6587\u7ae0\u7684\u4e3b\u9898\u6587\u4ef6\u3002","type":"string","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"id":{"description":"\u81ea\u52a8\u4fdd\u5b58\u7684 ID\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/font-families":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"\u5982\u4f55\u89e3\u91ca\u641c\u7d22\u8f93\u5165\u3002","type":"string","enum":["exact"],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u6587\u7ae0\u5c5e\u6027\u5bf9\u96c6\u5408\u8fdb\u884c\u6392\u5e8f\u3002","type":"string","default":"id","enum":["id","include"],"required":false},"slug":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u7279\u5b9a\u522b\u540d\u7684\u6587\u7ae0\u3002","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"theme_json_version":{"description":"\u7528\u4e8e\u6392\u7248\u8bbe\u7f6e\u7684 theme.json \u6a21\u5f0f\u7248\u672c\u3002","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"\u4ee5\u5b57\u7b26\u4e32\u5f62\u5f0f\u7f16\u7801\u7684 theme.json \u683c\u5f0f\u7684 font-family \u58f0\u660e\u3002","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/font-families"}]}},"\/wp\/v2\/font-families\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"theme_json_version":{"description":"\u7528\u4e8e\u6392\u7248\u8bbe\u7f6e\u7684 theme.json \u6a21\u5f0f\u7248\u672c\u3002","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"\u4ee5\u5b57\u7b26\u4e32\u5f62\u5f0f\u7f16\u7801\u7684 theme.json \u683c\u5f0f\u7684 font-family \u58f0\u660e\u3002","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"\u6587\u7ae0\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u662f\u5426\u7ed5\u8fc7\u56de\u6536\u7ad9\u5e76\u5f3a\u884c\u5220\u9664\u3002","required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"\u5b57\u4f53\u9762\u7684\u7236\u5b57\u4f53\u7cfb\u5217\u7684 ID\u3002","type":"integer","required":true},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"\u5982\u4f55\u89e3\u91ca\u641c\u7d22\u8f93\u5165\u3002","type":"string","enum":["exact"],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u6587\u7ae0\u5c5e\u6027\u5bf9\u96c6\u5408\u8fdb\u884c\u6392\u5e8f\u3002","type":"string","default":"id","enum":["id","include"],"required":false}}},{"methods":["POST"],"args":{"font_family_id":{"description":"\u5b57\u4f53\u9762\u7684\u7236\u5b57\u4f53\u7cfb\u5217\u7684 ID\u3002","type":"integer","required":true},"theme_json_version":{"description":"\u7528\u4e8e\u6392\u7248\u8bbe\u7f6e\u7684 theme.json \u6a21\u5f0f\u7248\u672c\u3002","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_face_settings":{"description":"\u5728 theme.json \u683c\u5f0f\u4e2d\u4ee5\u5b57\u7b26\u4e32\u5f62\u5f0f\u7f16\u7801\u7684 font-face \u58f0\u660e\u3002","type":"string","required":true}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"\u5b57\u4f53\u9762\u7684\u7236\u5b57\u4f53\u7cfb\u5217\u7684 ID\u3002","type":"integer","required":true},"id":{"description":"\u5b57\u4f53\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":true},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"font_family_id":{"description":"\u5b57\u4f53\u9762\u7684\u7236\u5b57\u4f53\u7cfb\u5217\u7684 ID\u3002","type":"integer","required":true},"id":{"description":"\u5b57\u4f53\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"\u662f\u5426\u7ed5\u8fc7\u56de\u6536\u7ad9\u5e76\u5f3a\u884c\u5220\u9664\u3002","required":false}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/types"}]}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"\u6587\u7ae0\u7c7b\u578b\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/statuses"}]}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"\u72b6\u6001\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"\u9650\u5236\u7ed3\u679c\u4e3a\u5173\u8054\u5230\u7279\u5b9a\u6587\u7ae0\u7c7b\u578b\u7684\u5206\u7c7b\u6cd5\u3002","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/taxonomies"}]}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"description":"\u5206\u7c7b\u6cd5\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u9879\u76ee\u5c5e\u6027\u6392\u5e8f\u96c6\u5408\u3002","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"\u662f\u5426\u9690\u85cf\u672a\u88ab\u6307\u5b9a\u5230\u4efb\u4f55\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"boolean","default":false,"required":false},"parent":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a\u7ed9\u7279\u5b9a\u7236\u9879\u76ee\u7684\u9879\u76ee\u3002","type":"integer","required":false},"post":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a\u7ed9\u7279\u5b9a\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"integer","default":null,"required":false},"slug":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5177\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u522b\u540d\u7684\u5206\u7c7b\u6cd5\u9879\u76ee\u3002","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"\u9879\u76ee\u7684 HTML \u63cf\u8ff0\u3002","type":"string","required":false},"name":{"description":"\u9879\u76ee\u7684 HTML \u6807\u9898\u3002","type":"string","required":true},"slug":{"description":"\u9879\u76ee\u7c7b\u578b\u800c\u8a00\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"parent":{"description":"\u7236\u672f\u8bed ID\u3002","type":"integer","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/categories"}]}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u9879\u76ee\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u9879\u76ee\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"description":{"description":"\u9879\u76ee\u7684 HTML \u63cf\u8ff0\u3002","type":"string","required":false},"name":{"description":"\u9879\u76ee\u7684 HTML \u6807\u9898\u3002","type":"string","required":false},"slug":{"description":"\u9879\u76ee\u7c7b\u578b\u800c\u8a00\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"parent":{"description":"\u7236\u672f\u8bed ID\u3002","type":"integer","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u9879\u76ee\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u8981\u6c42\u4e3a true\uff0c\u56e0\u4e3a\u9879\u76ee\u4e0d\u80fd\u88ab\u79fb\u52a8\u5230\u56de\u6536\u7ad9\u3002","required":false}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u9879\u76ee\u5c5e\u6027\u6392\u5e8f\u96c6\u5408\u3002","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"\u662f\u5426\u9690\u85cf\u672a\u88ab\u6307\u5b9a\u5230\u4efb\u4f55\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"boolean","default":false,"required":false},"post":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a\u7ed9\u7279\u5b9a\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"integer","default":null,"required":false},"slug":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5177\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u522b\u540d\u7684\u5206\u7c7b\u6cd5\u9879\u76ee\u3002","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"\u9879\u76ee\u7684 HTML \u63cf\u8ff0\u3002","type":"string","required":false},"name":{"description":"\u9879\u76ee\u7684 HTML \u6807\u9898\u3002","type":"string","required":true},"slug":{"description":"\u9879\u76ee\u7c7b\u578b\u800c\u8a00\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/tags"}]}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u9879\u76ee\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u9879\u76ee\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"description":{"description":"\u9879\u76ee\u7684 HTML \u63cf\u8ff0\u3002","type":"string","required":false},"name":{"description":"\u9879\u76ee\u7684 HTML \u6807\u9898\u3002","type":"string","required":false},"slug":{"description":"\u9879\u76ee\u7c7b\u578b\u800c\u8a00\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u9879\u76ee\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u8981\u6c42\u4e3a true\uff0c\u56e0\u4e3a\u9879\u76ee\u4e0d\u80fd\u88ab\u79fb\u52a8\u5230\u56de\u6536\u7ad9\u3002","required":false}}}]},"\/wp\/v2\/menus":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u9879\u76ee\u5c5e\u6027\u6392\u5e8f\u96c6\u5408\u3002","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"\u662f\u5426\u9690\u85cf\u672a\u88ab\u6307\u5b9a\u5230\u4efb\u4f55\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"boolean","default":false,"required":false},"post":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a\u7ed9\u7279\u5b9a\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"integer","default":null,"required":false},"slug":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5177\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u522b\u540d\u7684\u5206\u7c7b\u6cd5\u9879\u76ee\u3002","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"\u9879\u76ee\u7684 HTML \u63cf\u8ff0\u3002","type":"string","required":false},"name":{"description":"\u9879\u76ee\u7684 HTML \u6807\u9898\u3002","type":"string","required":true},"slug":{"description":"\u9879\u76ee\u7c7b\u578b\u800c\u8a00\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":[],"required":false},"locations":{"description":"\u5206\u914d\u7ed9\u83dc\u5355\u7684\u4f4d\u7f6e\u3002","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"\u662f\u5426\u81ea\u52a8\u6dfb\u52a0\u9876\u7ea7\u9875\u9762\u5230\u6b64\u83dc\u5355\u3002","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/menus"}]}},"\/wp\/v2\/menus\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u9879\u76ee\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u9879\u76ee\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"description":{"description":"\u9879\u76ee\u7684 HTML \u63cf\u8ff0\u3002","type":"string","required":false},"name":{"description":"\u9879\u76ee\u7684 HTML \u6807\u9898\u3002","type":"string","required":false},"slug":{"description":"\u9879\u76ee\u7c7b\u578b\u800c\u8a00\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":[],"required":false},"locations":{"description":"\u5206\u914d\u7ed9\u83dc\u5355\u7684\u4f4d\u7f6e\u3002","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"\u662f\u5426\u81ea\u52a8\u6dfb\u52a0\u9876\u7ea7\u9875\u9762\u5230\u6b64\u83dc\u5355\u3002","type":"boolean","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u9879\u76ee\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u8981\u6c42\u4e3a true\uff0c\u56e0\u4e3a\u9879\u76ee\u4e0d\u80fd\u88ab\u79fb\u52a8\u5230\u56de\u6536\u7ad9\u3002","required":false}}}]},"\/wp\/v2\/wp_pattern_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u9879\u76ee\u5c5e\u6027\u6392\u5e8f\u96c6\u5408\u3002","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"\u662f\u5426\u9690\u85cf\u672a\u88ab\u6307\u5b9a\u5230\u4efb\u4f55\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"boolean","default":false,"required":false},"post":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a\u7ed9\u7279\u5b9a\u6587\u7ae0\u7684\u9879\u76ee\u3002","type":"integer","default":null,"required":false},"slug":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5177\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u522b\u540d\u7684\u5206\u7c7b\u6cd5\u9879\u76ee\u3002","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"\u9879\u76ee\u7684 HTML \u63cf\u8ff0\u3002","type":"string","required":false},"name":{"description":"\u9879\u76ee\u7684 HTML \u6807\u9898\u3002","type":"string","required":true},"slug":{"description":"\u9879\u76ee\u7c7b\u578b\u800c\u8a00\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/wp_pattern_category"}]}},"\/wp\/v2\/wp_pattern_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u9879\u76ee\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u9879\u76ee\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"description":{"description":"\u9879\u76ee\u7684 HTML \u63cf\u8ff0\u3002","type":"string","required":false},"name":{"description":"\u9879\u76ee\u7684 HTML \u6807\u9898\u3002","type":"string","required":false},"slug":{"description":"\u9879\u76ee\u7c7b\u578b\u800c\u8a00\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u9879\u76ee\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u8981\u6c42\u4e3a true\uff0c\u56e0\u4e3a\u9879\u76ee\u4e0d\u80fd\u88ab\u79fb\u52a8\u5230\u56de\u6536\u7ad9\u3002","required":false}}}]},"\/wp\/v2\/users":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"default":"asc","description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","enum":["asc","desc"],"type":"string","required":false},"orderby":{"default":"name","description":"\u6309\u7528\u6237\u5c5e\u6027\u5bf9\u96c6\u5408\u8fdb\u884c\u6392\u5e8f\u3002","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"type":"string","required":false},"slug":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5177\u6709\u4e00\u4e2a\u6216\u591a\u4e2a\u522b\u540d\u7684\u7528\u6237\u3002","type":"array","items":{"type":"string"},"required":false},"roles":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5339\u914d\u81f3\u5c11\u4e00\u4e2a\u89d2\u8272\u7684\u7528\u6237\uff0c\u63a5\u53d7.csv \u683c\u5f0f\u5217\u8868\u6216\u5355\u4e2a\u89d2\u8272\u3002","type":"array","items":{"type":"string"},"required":false},"capabilities":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5339\u914d\u81f3\u5c11\u4e00\u9879\u63d0\u4f9b\u7684\u7279\u5b9a\u529f\u80fd\u7684\u7528\u6237\u3002\u63a5\u53d7 CSV \u5217\u8868\u6216\u5355\u4e2a\u529f\u80fd\u3002","type":"array","items":{"type":"string"},"required":false},"who":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u7528\u6237\u4e2d\u7684\u6240\u6709\u4f5c\u8005\u3002","type":"string","enum":["authors"],"required":false},"has_published_posts":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e8e\u5df2\u53d1\u5e03\u6587\u7ae0\u7684\u7528\u6237\u3002","type":["boolean","array"],"items":{"type":"string","enum":{"post":"post","page":"page","attachment":"attachment","nav_menu_item":"nav_menu_item","wp_block":"wp_block","wp_template":"wp_template","wp_template_part":"wp_template_part","wp_global_styles":"wp_global_styles","wp_navigation":"wp_navigation","wp_font_family":"wp_font_family","wp_font_face":"wp_font_face"}},"required":false},"search_columns":{"default":[],"description":"\u9700\u8981\u641c\u7d22\u7684\u680f\u4f4d\u540d\u79f0\u7ec4\u3002","type":"array","items":{"enum":["email","name","id","username","slug"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"username":{"description":"\u7528\u6237\u7684\u767b\u5f55\u540d\u3002","type":"string","required":true},"name":{"description":"\u7528\u6237\u7684\u663e\u793a\u540d\u3002","type":"string","required":false},"first_name":{"description":"\u7528\u6237\u7684\u540d\u5b57\u3002","type":"string","required":false},"last_name":{"description":"\u7528\u6237\u7684\u59d3\u6c0f\u3002","type":"string","required":false},"email":{"description":"\u7528\u6237\u7684\u90ae\u7bb1\u5730\u5740\u3002","type":"string","format":"email","required":true},"url":{"description":"\u7528\u6237\u7684 URL\u3002","type":"string","format":"uri","required":false},"description":{"description":"\u7528\u6237\u7684\u63cf\u8ff0\u3002","type":"string","required":false},"locale":{"description":"\u7528\u6237\u7684\u5730\u533a\u8bed\u8a00\u3002","type":"string","enum":["","en_US","zh_CN"],"required":false},"nickname":{"description":"\u7528\u6237\u7684\u6635\u79f0\u3002","type":"string","required":false},"slug":{"description":"\u7528\u6237\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"roles":{"description":"\u7528\u6237\u88ab\u8d4b\u4e88\u7684\u89d2\u8272\u3002","type":"array","items":{"type":"string"},"required":false},"password":{"description":"\u7528\u6237\u7684\u5bc6\u7801\uff08\u4ece\u4e0d\u88ab\u5305\u542b\uff09\u3002","type":"string","required":true},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"\u65e5\u671f\u548c\u65f6\u95f4\u7684\u504f\u597d\u8bbe\u7f6e\u5df2\u66f4\u65b0\u3002","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/users"}]}},"\/wp\/v2\/users\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u7528\u6237\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u7528\u6237\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"username":{"description":"\u7528\u6237\u7684\u767b\u5f55\u540d\u3002","type":"string","required":false},"name":{"description":"\u7528\u6237\u7684\u663e\u793a\u540d\u3002","type":"string","required":false},"first_name":{"description":"\u7528\u6237\u7684\u540d\u5b57\u3002","type":"string","required":false},"last_name":{"description":"\u7528\u6237\u7684\u59d3\u6c0f\u3002","type":"string","required":false},"email":{"description":"\u7528\u6237\u7684\u90ae\u7bb1\u5730\u5740\u3002","type":"string","format":"email","required":false},"url":{"description":"\u7528\u6237\u7684 URL\u3002","type":"string","format":"uri","required":false},"description":{"description":"\u7528\u6237\u7684\u63cf\u8ff0\u3002","type":"string","required":false},"locale":{"description":"\u7528\u6237\u7684\u5730\u533a\u8bed\u8a00\u3002","type":"string","enum":["","en_US","zh_CN"],"required":false},"nickname":{"description":"\u7528\u6237\u7684\u6635\u79f0\u3002","type":"string","required":false},"slug":{"description":"\u7528\u6237\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"roles":{"description":"\u7528\u6237\u88ab\u8d4b\u4e88\u7684\u89d2\u8272\u3002","type":"array","items":{"type":"string"},"required":false},"password":{"description":"\u7528\u6237\u7684\u5bc6\u7801\uff08\u4ece\u4e0d\u88ab\u5305\u542b\uff09\u3002","type":"string","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"\u65e5\u671f\u548c\u65f6\u95f4\u7684\u504f\u597d\u8bbe\u7f6e\u5df2\u66f4\u65b0\u3002","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u7528\u6237\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u8981\u6c42\u4e3a true\uff0c\u56e0\u4e3a\u7528\u6237\u4e0d\u80fd\u88ab\u79fb\u52a8\u5230\u56de\u6536\u7ad9\u3002","required":false},"reassign":{"type":"integer","description":"\u5c06\u88ab\u5220\u9664\u7528\u6237\u7684\u6587\u7ae0\u548c\u94fe\u63a5\u91cd\u65b0\u6307\u5b9a\u5230\u6b64\u7528\u6237 ID\u3002","required":true}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"description":"\u7528\u6237\u7684\u767b\u5f55\u540d\u3002","type":"string","required":false},"name":{"description":"\u7528\u6237\u7684\u663e\u793a\u540d\u3002","type":"string","required":false},"first_name":{"description":"\u7528\u6237\u7684\u540d\u5b57\u3002","type":"string","required":false},"last_name":{"description":"\u7528\u6237\u7684\u59d3\u6c0f\u3002","type":"string","required":false},"email":{"description":"\u7528\u6237\u7684\u90ae\u7bb1\u5730\u5740\u3002","type":"string","format":"email","required":false},"url":{"description":"\u7528\u6237\u7684 URL\u3002","type":"string","format":"uri","required":false},"description":{"description":"\u7528\u6237\u7684\u63cf\u8ff0\u3002","type":"string","required":false},"locale":{"description":"\u7528\u6237\u7684\u5730\u533a\u8bed\u8a00\u3002","type":"string","enum":["","en_US","zh_CN"],"required":false},"nickname":{"description":"\u7528\u6237\u7684\u6635\u79f0\u3002","type":"string","required":false},"slug":{"description":"\u7528\u6237\u7684\u82f1\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"roles":{"description":"\u7528\u6237\u88ab\u8d4b\u4e88\u7684\u89d2\u8272\u3002","type":"array","items":{"type":"string"},"required":false},"password":{"description":"\u7528\u6237\u7684\u5bc6\u7801\uff08\u4ece\u4e0d\u88ab\u5305\u542b\uff09\u3002","type":"string","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"\u65e5\u671f\u548c\u65f6\u95f4\u7684\u504f\u597d\u8bbe\u7f6e\u5df2\u66f4\u65b0\u3002","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false}}},{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"description":"\u8981\u6c42\u4e3a true\uff0c\u56e0\u4e3a\u7528\u6237\u4e0d\u80fd\u88ab\u79fb\u52a8\u5230\u56de\u6536\u7ad9\u3002","required":false},"reassign":{"type":"integer","description":"\u5c06\u88ab\u5220\u9664\u7528\u6237\u7684\u6587\u7ae0\u548c\u94fe\u63a5\u91cd\u65b0\u6307\u5b9a\u5230\u6b64\u7528\u6237 ID\u3002","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/users\/me"}]}},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords":{"namespace":"wp\/v2","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"app_id":{"description":"\u7531\u5e94\u7528\u7a0b\u5e8f\u63d0\u4f9b\u7684\u7528\u4e8e\u552f\u4e00\u8bc6\u522b\u7684 UUID\u3002\u5efa\u8bae\u4f7f\u7528\u542b\u6709 URL \u6216 DNS \u547d\u540d\u7a7a\u95f4\u7684 UUID v5\u3002","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"\u5e94\u7528\u7a0b\u5e8f\u5bc6\u7801\u540d\u79f0\u3002","type":"string","minLength":1,"pattern":".*\\S.*","required":true}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/introspect":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/(?P<uuid>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"app_id":{"description":"\u7531\u5e94\u7528\u7a0b\u5e8f\u63d0\u4f9b\u7684\u7528\u4e8e\u552f\u4e00\u8bc6\u522b\u7684 UUID\u3002\u5efa\u8bae\u4f7f\u7528\u542b\u6709 URL \u6216 DNS \u547d\u540d\u7a7a\u95f4\u7684 UUID v5\u3002","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"\u5e94\u7528\u7a0b\u5e8f\u5bc6\u7801\u540d\u79f0\u3002","type":"string","minLength":1,"pattern":".*\\S.*","required":false}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"after":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u540e\u53d1\u5e03\u7684\u8bc4\u8bba\u3002","type":"string","format":"date-time","required":false},"author":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a\u7ed9\u7279\u5b9a\u7528\u6237 ID \u7684\u8bc4\u8bba\uff0c\u9700\u8981\u6388\u6743\u3002","type":"array","items":{"type":"integer"},"required":false},"author_exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a\u7ed9\u7279\u5b9a\u7528\u6237 ID \u7684\u8bc4\u8bba\uff0c\u9700\u8981\u6388\u6743\u3002","type":"array","items":{"type":"integer"},"required":false},"author_email":{"default":null,"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a\u4f5c\u8005\u7684\u90ae\u7bb1\u5730\u5740\uff0c\u9700\u8981\u6388\u6743\u3002","format":"email","type":"string","required":false},"before":{"description":"\u5c06\u56de\u5e94\u9650\u5236\u5728\u4e00\u4e2a\u7ed9\u5b9a\u7684 ISO8601 \u517c\u5bb9\u65e5\u671f\u4e4b\u524d\u53d1\u5e03\u7684\u8bc4\u8bba\u3002","type":"string","format":"date-time","required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u8bc4\u8bba\u5c5e\u6027\u5bf9\u96c6\u5408\u8fdb\u884c\u6392\u5e8f\u3002","type":"string","default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"required":false},"parent":{"default":[],"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a\u7236 ID \u7684\u8bc4\u8bba\u3002","type":"array","items":{"type":"integer"},"required":false},"parent_exclude":{"default":[],"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a\u7236 ID \u7684\u8bc4\u8bba\u3002","type":"array","items":{"type":"integer"},"required":false},"post":{"default":[],"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5173\u8054\u5230\u6307\u5b9a\u6587\u7ae0 ID \u7684\u8bc4\u8bba\u3002","type":"array","items":{"type":"integer"},"required":false},"status":{"default":"approve","description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u8bbe\u7f6e\u7279\u5b9a\u72b6\u6001\u7684\u8bc4\u8bba\uff0c\u9700\u8981\u6388\u6743\u3002","type":"string","required":false},"type":{"default":"comment","description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u8bbe\u7f6e\u7279\u5b9a\u7c7b\u578b\u7684\u8bc4\u8bba\uff0c\u9700\u8981\u6388\u6743\u3002","type":"string","required":false},"password":{"description":"\u8be5\u6587\u7ae0\u7684\u5bc6\u7801\uff0c\u5982\u6587\u7ae0\u53d7\u5bc6\u7801\u4fdd\u62a4\u3002","type":"string","required":false}}},{"methods":["POST"],"args":{"author":{"description":"\u7528\u6237\u5bf9\u8c61\u7684 ID\uff0c\u5982\u679c\u4f5c\u8005\u662f\u7528\u6237\u3002","type":"integer","required":false},"author_email":{"description":"\u8bc4\u8bba\u8005\u7684\u90ae\u7bb1\u5730\u5740\u3002","type":"string","format":"email","required":false},"author_ip":{"description":"\u8bc4\u8bba\u8005\u7684 IP \u5730\u5740\u3002","type":"string","format":"ip","required":false},"author_name":{"description":"\u8bc4\u8bba\u8005\u7684\u663e\u793a\u540d\u3002","type":"string","required":false},"author_url":{"description":"\u8bc4\u8bba\u8005\u7684\u7f51\u5740\u3002","type":"string","format":"uri","required":false},"author_user_agent":{"description":"\u8bc4\u8bba\u8005\u7684 User-Agent\u3002","type":"string","required":false},"content":{"description":"\u8bc4\u8bba\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u8bc4\u8bba\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u8bc4\u8bba\u7684 HTML \u5185\u5bb9\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"\u8bc4\u8bba\u53d1\u8868\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":"string","format":"date-time","required":false},"date_gmt":{"description":"\u8bc4\u8bba\u53d1\u8868\u7684 GMT \u65e5\u671f\u3002","type":"string","format":"date-time","required":false},"parent":{"default":0,"description":"\u8bc4\u8bba\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"post":{"default":0,"description":"\u5173\u8054\u6587\u7ae0\u5bf9\u8c61\u7684 ID\u3002","type":"integer","required":false},"status":{"description":"\u8bc4\u8bba\u7684\u72b6\u6001\u3002","type":"string","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"\u6279\u6ce8\u89e3\u51b3\u72b6\u6001","default":"","enum":["resolved","reopen"]}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/comments"}]}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"\u8bc4\u8bba\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"\u8bc4\u8bba\u6240\u5c5e\u6587\u7ae0\u7684\u5bc6\u7801\uff08\u5982\u679c\u8be5\u6587\u7ae0\u88ab\u5bc6\u7801\u4fdd\u62a4\uff09\u3002","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"\u8bc4\u8bba\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"author":{"description":"\u7528\u6237\u5bf9\u8c61\u7684 ID\uff0c\u5982\u679c\u4f5c\u8005\u662f\u7528\u6237\u3002","type":"integer","required":false},"author_email":{"description":"\u8bc4\u8bba\u8005\u7684\u90ae\u7bb1\u5730\u5740\u3002","type":"string","format":"email","required":false},"author_ip":{"description":"\u8bc4\u8bba\u8005\u7684 IP \u5730\u5740\u3002","type":"string","format":"ip","required":false},"author_name":{"description":"\u8bc4\u8bba\u8005\u7684\u663e\u793a\u540d\u3002","type":"string","required":false},"author_url":{"description":"\u8bc4\u8bba\u8005\u7684\u7f51\u5740\u3002","type":"string","format":"uri","required":false},"author_user_agent":{"description":"\u8bc4\u8bba\u8005\u7684 User-Agent\u3002","type":"string","required":false},"content":{"description":"\u8bc4\u8bba\u7684\u5185\u5bb9\u3002","type":"object","properties":{"raw":{"description":"\u8bc4\u8bba\u7684\u5185\u5bb9\uff0c\u5b58\u653e\u4e8e\u6570\u636e\u5e93\u4e2d\u3002","type":"string","context":["edit"]},"rendered":{"description":"\u8bc4\u8bba\u7684 HTML \u5185\u5bb9\uff0c\u7ecf\u8f6c\u6362\u540e\u7528\u4e8e\u663e\u793a\u3002","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"\u8bc4\u8bba\u53d1\u8868\u7684\u65e5\u671f\uff08\u7ad9\u70b9\u65f6\u533a\uff09\u3002","type":"string","format":"date-time","required":false},"date_gmt":{"description":"\u8bc4\u8bba\u53d1\u8868\u7684 GMT \u65e5\u671f\u3002","type":"string","format":"date-time","required":false},"parent":{"description":"\u8bc4\u8bba\u7684\u7236\u7ea7 ID\u3002","type":"integer","required":false},"post":{"description":"\u5173\u8054\u6587\u7ae0\u5bf9\u8c61\u7684 ID\u3002","type":"integer","required":false},"status":{"description":"\u8bc4\u8bba\u7684\u72b6\u6001\u3002","type":"string","required":false},"meta":{"description":"\u5143\u5b57\u6bb5\u3002","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"\u6279\u6ce8\u89e3\u51b3\u72b6\u6001","default":"","enum":["resolved","reopen"]}},"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"\u8bc4\u8bba\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"\u662f\u5426\u7ed5\u8fc7\u56de\u6536\u7ad9\u5e76\u5f3a\u884c\u5220\u9664\u3002","required":false},"password":{"description":"\u8bc4\u8bba\u6240\u5c5e\u6587\u7ae0\u7684\u5bc6\u7801\uff08\u5982\u679c\u8be5\u6587\u7ae0\u88ab\u5bc6\u7801\u4fdd\u62a4\uff09\u3002","type":"string","required":false}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"type":{"default":"post","description":"\u9650\u5236\u7ed3\u679c\u4e3a\u4e00\u79cd\u5bf9\u8c61\u7c7b\u578b\u3002","type":"string","enum":["post","term","post-format"],"required":false},"subtype":{"default":"any","description":"\u9650\u5236\u7ed3\u679c\u4e3a\u4e00\u79cd\u6216\u591a\u79cd\u5bf9\u8c61\u5b50\u7c7b\u578b\u3002","type":"array","items":{"enum":["post","page","category","post_tag","any"],"type":"string"},"required":false},"exclude":{"description":"\u786e\u4fdd\u7ed3\u679c\u96c6\u6392\u9664\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a ID\u3002","type":"array","items":{"type":"integer"},"default":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/search"}]}},"\/wp\/v2\/block-renderer\/(?P<name>[a-z0-9-]+\/[a-z0-9-]+)":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"name":{"description":"\u6b64\u533a\u5757\u7684\u552f\u4e00\u6ce8\u518c\u540d\u3002","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["edit"],"default":"view","required":false},"attributes":{"description":"\u6b64\u533a\u5757\u7684\u5c5e\u6027\u3002","type":"object","default":[],"required":false},"post_id":{"description":"\u6587\u7ae0\u4e0a\u4e0b\u6587\u7684 ID\u3002","type":"integer","required":false}}}]},"\/wp\/v2\/block-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"\u533a\u5757\u547d\u540d\u7a7a\u95f4\u3002","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/block-types"}]}},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"\u533a\u5757\u547d\u540d\u7a7a\u95f4\u3002","type":"string","required":false}}}]},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)\/(?P<name>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"\u533a\u5757\u540d\u79f0","type":"string","required":false},"namespace":{"description":"\u533a\u5757\u547d\u540d\u7a7a\u95f4\u3002","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"title":{"title":"\u6807\u9898","description":"\u7ad9\u70b9\u6807\u9898\u3002","type":"string","required":false},"description":{"title":"\u526f\u6807\u9898","description":"\u7ad9\u70b9\u526f\u6807\u9898\u3002","type":"string","required":false},"url":{"title":"","description":"\u7ad9\u70b9 URL\u3002","type":"string","format":"uri","required":false},"email":{"title":"","description":"\u6b64\u5730\u5740\u88ab\u7528\u4f5c\u7ba1\u7406\u7528\u9014\uff0c\u5982\u65b0\u7528\u6237\u901a\u77e5\u3002","type":"string","format":"email","required":false},"timezone":{"title":"","description":"\u548c\u60a8\u5728\u540c\u4e00\u4e2a\u65f6\u533a\u7684\u57ce\u5e02\u3002","type":"string","required":false},"date_format":{"title":"","description":"\u5bf9\u6240\u6709\u65e5\u671f\u5b57\u7b26\u4e32\u9002\u7528\u7684\u65e5\u671f\u683c\u5f0f\u3002","type":"string","required":false},"time_format":{"title":"","description":"\u5bf9\u6240\u6709\u65f6\u95f4\u5b57\u7b26\u4e32\u9002\u7528\u7684\u65f6\u95f4\u683c\u5f0f\u3002","type":"string","required":false},"start_of_week":{"title":"","description":"\u4e00\u5468\u4ece\u5468\u51e0\u5f00\u59cb\u3002","type":"integer","required":false},"language":{"title":"","description":"WordPress \u5730\u533a\u8bed\u8a00\u4ee3\u7801\u3002","type":"string","required":false},"use_smilies":{"title":"","description":"\u5c06\u8868\u60c5\u7b26\u53f7\u5982:-) \u548c:-P \u8f6c\u6362\u4e3a\u56fe\u7247\u663e\u793a\u3002","type":"boolean","required":false},"default_category":{"title":"","description":"\u9ed8\u8ba4\u6587\u7ae0\u5206\u7c7b\u3002","type":"integer","required":false},"default_post_format":{"title":"","description":"\u9ed8\u8ba4\u6587\u7ae0\u5f62\u5f0f\u3002","type":"string","required":false},"posts_per_page":{"title":"\u6bcf\u9875\u6700\u591a\u6587\u7ae0\u6570","description":"\u6700\u591a\u663e\u793a\u7684\u535a\u5ba2\u9875\u9762\u6570\u91cf\u3002","type":"integer","required":false},"show_on_front":{"title":"\u5728\u524d\u9762\u663e\u793a","description":"\u9700\u8981\u5728\u9996\u9875\u4e0a\u663e\u793a\u7684\u9879\u76ee","type":"string","required":false},"page_on_front":{"title":"\u524d\u4e00\u9875","description":"\u9700\u8981\u5728\u9996\u9875\u4e0a\u663e\u793a\u7684\u9875\u9762 ID","type":"integer","required":false},"page_for_posts":{"title":"","description":"\u9700\u8981\u663e\u793a\u6700\u65b0\u6587\u7ae0\u7684\u9875\u9762 ID","type":"integer","required":false},"default_ping_status":{"title":"","description":"\u5141\u8bb8\u5728\u6587\u7ae0\u4e2d\u63a5\u6536\u6765\u81ea\u5176\u4ed6\u535a\u5ba2\u7684\u94fe\u63a5\u901a\u77e5\uff08Pingback \u548c Trackback\uff09\u3002","type":"string","enum":["open","closed"],"required":false},"default_comment_status":{"title":"\u5141\u8bb8\u5bf9\u65b0\u6587\u7ae0\u53d1\u8868\u8bc4\u8bba","description":"\u5141\u8bb8\u4ed6\u4eba\u5728\u65b0\u6587\u7ae0\u4e0a\u53d1\u8868\u8bc4\u8bba\u3002","type":"string","enum":["open","closed"],"required":false},"site_logo":{"title":"Logo","description":"\u7ad9\u70b9 logo","type":"integer","required":false},"site_icon":{"title":"\u56fe\u6807","description":"\u7ad9\u70b9\u56fe\u6807\u3002","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/settings"}]}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u6307\u5b9a\u4e86\u4e00\u4e2a\u6216\u591a\u4e2a\u72b6\u6001\u7684\u4e3b\u9898\u3002","type":"array","items":{"enum":["active","inactive"],"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/themes"}]}},"\/wp\/v2\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"\u4e3b\u9898\u7684\u6837\u5f0f\u8868\u3002\u8fd9\u662f\u4e3b\u9898\u7684\u552f\u4e00\u6807\u8bc6\u3002","type":"string","required":false}}}]},"\/wp\/v2\/plugins":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"status":{"description":"\u9650\u5236\u7ed3\u679c\u96c6\u4e3a\u5177\u6709\u7ed9\u5b9a\u72b6\u6001\u7684\u63d2\u4ef6\u3002","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org \u63d2\u4ef6\u76ee\u5f55\u522b\u540d\u3002","pattern":"[\\w\\-]+","required":true},"status":{"description":"\u63d2\u4ef6\u542f\u7528\u72b6\u6001\u3002","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/plugins"}]}},"\/wp\/v2\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"status":{"description":"\u63d2\u4ef6\u542f\u7528\u72b6\u6001\u3002","type":"string","enum":["inactive","active"],"required":false}}},{"methods":["DELETE"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}}]},"\/wp\/v2\/sidebars":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/sidebars"}]}},"\/wp\/v2\/sidebars\/(?P<id>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"\u5df2\u6ce8\u518c\u7684\u8fb9\u680f ID","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"widgets":{"description":"\u5d4c\u5957\u5c0f\u5de5\u5177\u3002","type":"array","items":{"type":["object","string"]},"required":false}}}]},"\/wp\/v2\/widget-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/widget-types"}]}},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"\u5c0f\u5de5\u5177\u7c7b\u578b ID\u3002","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/encode":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"\u5c0f\u5de5\u5177\u7c7b\u578b ID\u3002","type":"string","required":true},"instance":{"description":"\u5c0f\u5de5\u5177\u7684\u5f53\u524d\u8bbe\u7f6e\u5b9e\u4f8b\u3002","type":"object","required":false},"form_data":{"description":"\u5e8f\u5217\u5316\u5c0f\u5de5\u5177\u8868\u5355\u6570\u636e\uff0c\u4ee5\u7f16\u7801\u4e3a\u8bbe\u7f6e\u5b9e\u4f8b\u3002","type":"string","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/render":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"\u5c0f\u5de5\u5177\u7c7b\u578b ID\u3002","type":"string","required":true},"instance":{"description":"\u5c0f\u5de5\u5177\u7684\u5f53\u524d\u8bbe\u7f6e\u5b9e\u4f8b\u3002","type":"object","required":false}}}]},"\/wp\/v2\/widgets":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"sidebar":{"description":"\u8fd4\u56de\u5c0f\u5de5\u5177\u7684\u4fa7\u8fb9\u680f\u3002","type":"string","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u5c0f\u5de5\u5177\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"id_base":{"description":"\u5c0f\u5de5\u5177\u7684\u7c7b\u578b\u3002\u5bf9\u5e94\u4e8e widget-types \u7aef\u70b9\u7684 ID\u3002","type":"string","required":false},"sidebar":{"default":"wp_inactive_widgets","description":"\u5c0f\u5de5\u5177\u6240\u5c5e\u7684\u4fa7\u8fb9\u680f\u3002","type":"string","required":true},"instance":{"description":"\u5c0f\u5de5\u5177\u7684\u5b9e\u4f8b\u8bbe\u7f6e\uff08\u5982\u679c\u652f\u6301\uff09\u3002","type":"object","properties":{"encoded":{"description":"\u5b9e\u4f8b\u8bbe\u7f6e\u7684 Base64 \u7f16\u7801\u8868\u793a\u3002","type":"string","context":["edit"]},"hash":{"description":"\u5b9e\u4f8b\u8bbe\u7f6e\u7684\u52a0\u5bc6\u54c8\u5e0c\u503c\u3002","type":"string","context":["edit"]},"raw":{"description":"\u672a\u7f16\u7801\u7684\u5b9e\u4f8b\u8bbe\u7f6e\uff08\u5982\u679c\u652f\u6301\uff09\u3002","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"\u6765\u81ea\u5c0f\u5de5\u5177\u7ba1\u7406\u8868\u5355\u7684 URL \u7f16\u7801\u8868\u5355\u6570\u636e\u3002\u7528\u4e8e\u66f4\u65b0\u4e0d\u652f\u6301\u5b9e\u4f8b\u7684\u5c0f\u5de5\u5177\uff08\u6307\u5199\uff09\u3002","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/widgets"}]}},"\/wp\/v2\/widgets\/(?P<id>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"\u5c0f\u5de5\u5177\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"id_base":{"description":"\u5c0f\u5de5\u5177\u7684\u7c7b\u578b\u3002\u5bf9\u5e94\u4e8e widget-types \u7aef\u70b9\u7684 ID\u3002","type":"string","required":false},"sidebar":{"description":"\u5c0f\u5de5\u5177\u6240\u5c5e\u7684\u4fa7\u8fb9\u680f\u3002","type":"string","required":false},"instance":{"description":"\u5c0f\u5de5\u5177\u7684\u5b9e\u4f8b\u8bbe\u7f6e\uff08\u5982\u679c\u652f\u6301\uff09\u3002","type":"object","properties":{"encoded":{"description":"\u5b9e\u4f8b\u8bbe\u7f6e\u7684 Base64 \u7f16\u7801\u8868\u793a\u3002","type":"string","context":["edit"]},"hash":{"description":"\u5b9e\u4f8b\u8bbe\u7f6e\u7684\u52a0\u5bc6\u54c8\u5e0c\u503c\u3002","type":"string","context":["edit"]},"raw":{"description":"\u672a\u7f16\u7801\u7684\u5b9e\u4f8b\u8bbe\u7f6e\uff08\u5982\u679c\u652f\u6301\uff09\u3002","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"\u6765\u81ea\u5c0f\u5de5\u5177\u7ba1\u7406\u8868\u5355\u7684 URL \u7f16\u7801\u8868\u5355\u6570\u636e\u3002\u7528\u4e8e\u66f4\u65b0\u4e0d\u652f\u6301\u5b9e\u4f8b\u7684\u5c0f\u5de5\u5177\uff08\u6307\u5199\uff09\u3002","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"force":{"description":"\u5f3a\u884c\u79fb\u9664\u5c0f\u5de5\u5177\uff0c\u8d27\u5c06\u5176\u79fb\u52a8\u5230\u672a\u542f\u7528\u7684\u5c0f\u5de5\u5177\u4fa7\u8fb9\u680f\u3002","type":"boolean","required":false}}}]},"\/wp\/v2\/block-directory\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"term":{"description":"\u5c06\u7ed3\u679c\u96c6\u9650\u5236\u4e3a\u5339\u914d\u641c\u7d22\u8bcd\u7684\u533a\u5757\u3002","type":"string","minLength":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/block-directory\/search"}]}},"\/wp\/v2\/pattern-directory\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","minLength":1,"required":false},"category":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u4e0e\u5206\u7c7b ID \u5339\u914d\u7684\u7ed3\u679c\u3002","type":"integer","minimum":1,"required":false},"keyword":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u4e0e\u5173\u952e\u5b57 ID \u5339\u914d\u7684\u7ed3\u679c\u3002","type":"integer","minimum":1,"required":false},"slug":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u4e0e\u6837\u677f\uff08\u522b\u540d\uff09\u5339\u914d\u7684\u7ed3\u679c\u3002","type":"array","required":false},"offset":{"description":"\u5c06\u7ed3\u679c\u96c6\u79fb\u4f4d\u7279\u5b9a\u6570\u91cf\u3002","type":"integer","required":false},"order":{"description":"\u8bbe\u7f6e\u6392\u5e8f\u5b57\u6bb5\u5347\u5e8f\u6216\u964d\u5e8f\u3002","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"\u6309\u6587\u7ae0\u5c5e\u6027\u5bf9\u96c6\u5408\u8fdb\u884c\u6392\u5e8f\u3002","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","favorite_count"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/pattern-directory\/patterns"}]}},"\/wp\/v2\/block-patterns\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/block-patterns\/patterns"}]}},"\/wp\/v2\/block-patterns\/categories":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/block-patterns\/categories"}]}},"\/wp-site-health\/v1":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-site-health\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-site-health\/v1"}]}},"\/wp-site-health\/v1\/tests\/background-updates":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-site-health\/v1\/tests\/background-updates"}]}},"\/wp-site-health\/v1\/tests\/loopback-requests":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-site-health\/v1\/tests\/loopback-requests"}]}},"\/wp-site-health\/v1\/tests\/https-status":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-site-health\/v1\/tests\/https-status"}]}},"\/wp-site-health\/v1\/tests\/dotorg-communication":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-site-health\/v1\/tests\/dotorg-communication"}]}},"\/wp-site-health\/v1\/tests\/authorization-header":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-site-health\/v1\/tests\/authorization-header"}]}},"\/wp-site-health\/v1\/directory-sizes":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-site-health\/v1\/directory-sizes"}]}},"\/wp-site-health\/v1\/tests\/page-cache":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-site-health\/v1\/tests\/page-cache"}]}},"\/wp-block-editor\/v1":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-block-editor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-block-editor\/v1"}]}},"\/wp-block-editor\/v1\/url-details":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"\u8981\u5904\u7406\u7684 URL\u3002","type":"string","format":"uri","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-block-editor\/v1\/url-details"}]}},"\/wp\/v2\/menu-locations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/menu-locations"}]}},"\/wp\/v2\/menu-locations\/(?P<location>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"location":{"description":"\u83dc\u5355\u4f4d\u7f6e\u7684\u5b57\u6bcd\u6570\u5b57\u6807\u8bc6\u7b26\u3002","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-block-editor\/v1\/export":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-block-editor\/v1\/export"}]}},"\/wp-block-editor\/v1\/navigation-fallback":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-block-editor\/v1\/navigation-fallback"}]}},"\/wp\/v2\/font-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/font-collections"}]}},"\/wp\/v2\/font-collections\/(?P<slug>[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-abilities\/v1":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-abilities\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-abilities\/v1"}]}},"\/wp-abilities\/v1\/categories":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":50,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-abilities\/v1\/categories"}]}},"\/wp-abilities\/v1\/categories\/(?P<slug>[a-z0-9]+(?:-[a-z0-9]+)*)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"\u80fd\u529b\u5206\u7c7b\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"string","pattern":"^[a-z0-9]+(?:-[a-z0-9]+)*$","required":false}}}]},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+?)\/run":{"namespace":"wp-abilities\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"name":{"description":"\u80fd\u529b\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"input":{"description":"\u6267\u884c\u80fd\u529b\u7684\u8f93\u5165\u53c2\u6570\u3002","type":["integer","number","boolean","string","array","object","null"],"default":null,"required":false}}}]},"\/wp-abilities\/v1\/abilities":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"category":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u7279\u5b9a\u80fd\u529b\u5206\u7c7b\u4e2d\u7684\u80fd\u529b\u3002","type":"string","required":false},"namespace":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u7279\u5b9a\u547d\u540d\u7a7a\u95f4\u4e2d\u7684\u80fd\u529b\u3002","type":"string","required":false},"meta":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u4e0e\u6240\u6709\u7ed9\u5b9a\u5143\u5b57\u6bb5\u5339\u914d\u7684\u80fd\u529b\u3002","type":"object","properties":{"annotations":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u4e0e\u7ed9\u5b9a\u884c\u4e3a\u6ce8\u91ca\u76f8\u5339\u914d\u7684\u80fd\u529b\u3002","type":"object","properties":{"readonly":{"description":"\u80fd\u529b\u662f\u5426\u4e0d\u4f1a\u6539\u53d8\u5176\u73af\u5883\u3002","type":["boolean","null"]},"destructive":{"description":"\u8be5\u80fd\u529b\u662f\u5426\u53ef\u4ee5\u5bf9\u5176\u73af\u5883\u6267\u884c\u7834\u574f\u6027\u66f4\u65b0\u3002","type":["boolean","null"]},"idempotent":{"description":"\u4f7f\u7528\u76f8\u540c\u53c2\u6570\u91cd\u590d\u8c03\u7528\u662f\u5426\u6ca1\u6709\u989d\u5916\u6548\u679c\u3002","type":["boolean","null"]}},"additionalProperties":true}},"additionalProperties":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp-abilities\/v1\/abilities"}]}},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"\u80fd\u529b\u7684\u552f\u4e00\u6807\u8bc6\u7b26\u3002","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false}}}]},"\/wp\/v2\/icons":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false},"collection":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5c5e\u4e8e\u7ed9\u5b9a\u96c6\u5408\u522b\u540d\u7684\u56fe\u6807\u3002","type":"string","pattern":"^[a-z0-9]([a-z0-9_-]*[a-z0-9])?$","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/icons"}]}},"\/wp\/v2\/icons\/(?P<collection>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"collection":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5c5e\u4e8e\u7ed9\u5b9a\u96c6\u5408\u522b\u540d\u7684\u56fe\u6807\u3002","type":"string","pattern":"^[a-z0-9]([a-z0-9_-]*[a-z0-9])?$","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false}}}]},"\/wp\/v2\/icons\/(?P<name>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?\/[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"\u56fe\u6807\u540d\u79f0\u3002","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/icon-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"\u96c6\u5408\u7684\u5f53\u524d\u9875\u3002","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"\u7ed3\u679c\u96c6\u5305\u542b\u7684\u6700\u5927\u9879\u76ee\u6570\u91cf\u3002","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"\u5c06\u7ed3\u679c\u9650\u5236\u4e3a\u5339\u914d\u5b57\u7b26\u4e32\u7684\u3002","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/icon-collections"}]}},"\/wp\/v2\/icon-collections\/(?P<slug>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"\u56fe\u6807\u96c6\u5408\u522b\u540d\u3002","type":"string","required":false},"context":{"description":"\u8bf7\u6c42\u63d0\u51fa\u7684\u8303\u56f4\uff0c\u7528\u4e8e\u51b3\u5b9a\u56de\u5e94\u5305\u542b\u7684\u5b57\u6bb5\u3002","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/view-config":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"description":"\u5b9e\u4f53\u7c7b\u578b\u3002","type":"string","required":true},"name":{"description":"\u5b9e\u4f53\u540d\u79f0\u3002","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/wiz.cn\/blog\/wp-json\/wp\/v2\/view-config"}]}}},"site_logo":0,"site_icon":0,"site_icon_url":"","_links":{"help":[{"href":"https:\/\/developer.wordpress.org\/rest-api\/"}]}}